Decision Notice - 010.2007.00002333.001 [As Published] · 142007.2333

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  2007/2333




Page 8 of 13


[OCR of page images]
2007/2333

 

Concurrence Agency.Response

EPA Permit number: 1PCC01226208

 

 

 

Plan / Drawing numbers Date
07/65-1 A prepared by S Ashton (John Norden & Associates) May. 2007
07/65-2 prepared by S Ashton (John Norden & Associates) May 2007

 

 

 

 

2. Removal of the existing pontoon:

(a) All debris created from the removal of the existing structure must be removed and disposed of
in an appropriate manner above the level of highest astronomical tide.
(b) Any material or debris that falls or is deposited on tidal lands during the removal of the existing
pontoon structure must be removed by the constructing authority at its cost and expense prior
“to the completion of.the works. &
3. All reasonable and practicable measures must be taken to minimise pollution of tidal waters-as a s
result of sediment runoff, and the discharge of other contaminants, including fuel, oil, construction
waste and hydraulic fluid to the waterway during construction of the works.

Reasons for inclusion of development conditions

In accordance with section 3.3.18(8) of the Integrated Planning Act 1997 and section 27B of the Acts
Interpretation Act 1954, the reasons for the inclusion of development conditions are:

The Environmental Protection Agency is a concurrence agency under the Integrated Planning Regulation 1998
for coastal management under the Coastal Projection and Management Act 1995, excluding amenity or
aesthetic significance or value.

Additional information for applicants

Contaminated Land

Itis a requirement of the Environmenial Protection Act 1994 that if an owner or occupier of land becomes aware
a Notifiable Activity (as defined. by Schedule 2 of the Environmental Protection Act 1994) is being carried out on
the land or that the land has been affected by a hazardous contaminant; they must, within 30 days after
becoming so aware, give notice to the Environmental Protection Agency.

Ben Salo

Delegate ° ‘
Environmental Protection Agency .
20-OCT-2008

 

 

Page 2 of § Environmental Protection Agency

Page 8 of 13

Used in these records

About this file

File size
504 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002333.001 [As Published].pdf · 504 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.