Original source · versioned page text
Annual Report 2014
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
NOOSA SHIRE COUNCIL
Notes to the financial statements
For the six months ending 30 June 2014
SS RESTS
19 Fair value measurements - continued
In most cases the move:nent in base unit rates has been modest although there have been some larger increases due to increased material supply costs
and plant hire rates.
A review of the Australian Burcau of Statistics Queensland Roads, and Bridges Indices for the period t January to 30 June 2014 shows no significant
matcrial changes and therefore the values are considered still at fair value
Accumulated depreciation:
In determining the level of accumulated depreciation, roads were disaggregated into significant components which exhibited different useful lives.
Estimated useful lives are disclosed in note 18.
Bridges
Current replacement cost:
A full valuation of bridges assets was undertaken by independent valuers, Aurecon Australia Pty Ltd effective } January 2014. All bridges, with
exception to 3 major bridges, were valued based on unit rates developed according to varying materia! types used for construction, the deck area, size
and fength. Construction estimates were determined on a similar basis to roads, Significant bridge structures were individually assessed by Aurecon
Australia Pty Ltd.
A review of the Australian Bureau of Statistics Qucensland Roads, and Bridges Indices for the period ! January 2014 to 36 June 2014 shows no
significant material changes and therefore the values are considered still at fair value,
Accumulated depreciation: .
In determining the fevel of accumulated depreciation, bridges were disaggregated into significant construction materials which exhibited different
useful lives
Estimated useful lives are disclosed in note 18.
Stormwater
Current repiaceinent cost:
The fair value of stormwater assets was determined by reference to the Australian Bureau of Statistics Road and Bridge Construction Qld December
2013 quarter which reflected an increment of 1.921%
Where Stormwater assets are located underground and physical inspection is not possible, the age, size and type of construction material, tngether with
current and planned maintenance records are used to determine the fair value at reporting date. Council uses both location and depth adjustment factors
in its calculation of fair value as presented in the table below.
Adjustment Pactors
| Location | Depth
Rural <1.5m
Urban i.5m to 2.5m
Industrial/Commercial 2.5m to 3.5m
3.5m to 4.5m
> 4.51n
The last comprehensive revaluation of Stormwater was completed by Aurccon Australia Pty Ltd under the auspices of Sunshine Coast Regional Council
as at 30 June 2012.
Accumulated depreciation:
In determining the level of accumulated depreciation, Stormwater assets were disaggregated into significant components which exhibited different
useful lives.
Estimates of expired service potential and remaining useful lives were determined on a straight line basis based on industry standard practices and past
experience, supporied by maintenance programs.
Estimated useful lives are disclosed in note 18.
A review of the Australian Bureau of Statistics Queensland Roads, and Bridges Indices for the period | January 2014 to 30 June 2014 shows no
significant material changes and therefore the values are considered still at fair value
3 ' certified statements
Page 28See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Annual Report 2014(PDF, 1MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.