Original source · versioned page text
20220206 Elm St OPW RFI Civil Drawings
Original PDF page 8, section 4. The text section number identifies this passage in the reader.
/
/
/
O
· AT LEAST DAILY (WHEN WORK IS OCCURRING ON
/
/
/
(D)
////
/
//
/
/
/
/ O
/
/
10
/
//
SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING
|S|
/
/
/
////
/ O
/
8
/
//
/
/
/
.0
/
/
ON SITE)
O
/
/
/
/
//
/ / /
/
/
/
/
/
O
/
//
(D)
/
/
· WITHIN 24 HOURS OF EXPECTED RAIN; AND
/
/ / /
////
////
/
/
/
//
O
/
/
/
/
/
· WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN
//
/
O
/
/
/
/
//// //// //// ////
/
//// ////
//
////
/
////
O
/
EVENT OF SUFFICIENT INTENSITY AND DURATION TO
/
|S|
/
/
/
//
(D)
/
O
/
/
/
////
/
//
MOBILISE SEDIMENT ON SITE).
/
/
/
/
/ O
(RW)
/
//
////
/
/ / /
/
/
/ O
17. IN ACCORDANCE WITH NC ESC GUIDELINES,
//
/
/
/
/
/
////
O
//
/
/
(D)
MAINTENANCE OF ESC MEASURES SHALL OCCUR IN
/
/
/
//
O
/
/
/
/
//
|S|
/
ACCORDANCE WITH THE FOLLOWING TABLE:
/ / / / /
/
/ / / /
O
/
////
/
/
/
/ / / / / / / / / / / / / / / /
//
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/
/ / / / / / / / / / / / /
O
/ / / / / / / / / / / / / / / / / / / /
10
/ / See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.