20220206 Elm St OPW RFI Civil Drawings

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                       1 METER MAX.              STAR PICKETS

                                               PROVIDE WASH WATER FOR                                                                                                            DROP INLET
TIMBER SLEEPER OR METAL                                                                                                                                                          WITH GRATE
                                               TRUCKS EXITING SITE
GRID 100mm HIGH AND                                                                                                                                                              WIRE OR STEEL MESH
SPACED AT 300mm CTS                                MIN LEN                                                                                                                       (14 GAUGE x 150mm                                                                                                WRAP FILTER




                                                                                                                                                                                                                                                                                                                                                       500 - 600mm
                                                          GTH 10m
                                                                                     BERM 300 HIGH MIN                                                                           OPENINGS) WHERE GEOTEXTILE                                                                                       CLOTH OVER GRATE
  CONSTRUCTION SITE                                                                                                                                                              IS NOT SELF-SUPPORTING
                                                                                                                                                                                 WOVEN GEOTEXTILE                                                                                                                                                                                                1.5m STAR
                                                                                          EXISTING ROADWAY                                                                                                                                                                                                                                                                                       PICKETS
                                                                                                                                                                                                                                                                                                                                                                                                 AT MAX. 2.5m CENTRES

  GEOTEXTILE FABRIC                                                                                                                                                         STAR PICKET                                                                                                                                                                                                       SELF-SUPPORTING
                                                                                                                                                                            FITTED WITH                                                                                                                                                                                                       GEOTEXTILE
                                               50-75mm GRAVEL BED                                                                                                           SAFETY CAP                                                                                                                                                                                                                    OW
                                               MIN 200mm THICK                                                                                                                                                                                                                                                                                                                            DIRECTION OF FL
                 RUNOFF FROM PAD DIRECTED                                                                          SANDBAGS                                           WOVEN GEOTEXTILE
                 TO SEDIMENT TRAP
                                                                                                                                                                               RUNOFF                                                                             WRAP FILTER
                                                                                                                                                                                                                                           RUNOFF                                                                                                                                                ON SOIL, 150mm x 100mm
           TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                                                 WATER WITH                                                                         CLOTH OVER GRATE




                                                                                                                                               FLOW
                                                                                                                                                                                                                                           WATER WITH                                                                                                                                            TRENCH WITH
                                     SCALE: N.T.S.                                                                 WATERWAY                                                    SEDIMENT
                                                                                                                                                                                                                                           SEDIMENT                                                                                                                                              COMPACTED BACKFILL
                                                                                                                                                                                                                                                                                                                                                                                                 AND ON ROCK, SET INTO
                                                                                                                   EXCAVATION                                                                                                                                                                                                                                                                    SURFACE CONCRETE
                                                                                                                                                                                                                                                                                                                                                                             SECTION DETAIL




                                                                                                                                                                                                                                                                                                                                                       600mm MIN.
                                                                                                                                                                                                        FILTERED                                                               FILTERED
                                                                                                                                                                                                         WATER                                                                  WATER
                                                                                                                                                                              GEOTEXTILE
                                                                                                                   EARTH BANK                                                 EMBEDDED 150mm
                                                                                                                                                                              INTO GROUND                                                                                                                                                                                             20m MAX.




                                                                                                                                                                                                                                                                                                                                MIN. 1.5m
                                                                                                                                                                      FOR DROP INLETS AT NON-SAG POINTS,                                          GEOTEXTILE INLET FILTER TYPE B                                                                                                                    FLOW
                                                                                                                                                                      SANDBAGS, EARTH BANK OR EXCAVATION                                                              SCALE N.T.S
                                                                                                                                                                      USED TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                       STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                                MAX. 2.5m SPACINGS
                                                                                                                     GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                                TYPICAL
                                                                                                                     1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                                     2.        PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                            PLAN

                                                                                                                     3.        IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS
                                                                                                                               OR EARTH BANKS AS SHOWN IN THE DRAWING.

                                                                                                                     4.        DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
                                                                                                                                                                                                                                                                                                                                                                     DISTURBED             DIRECTION           1.5m STAR PICKETS
                                                                                                                               ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
                                                                                                                                                                                                                                                                                                                                                                     AREA                  OF FLOW             AT MAX. 2.5m
                                                                                                                                     GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                                 CENTRES
                                                                                                                                                             SCALE N.T.S

                  TIMBER SPACER                             KERB-SIDE
                  TO SUIT                                   INLET




                                                                                                                                                                                                                                                                                                                                                                     UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                                     AREAS

                                                      GRAVEL-FILLED WIRE
                                                      MESH OR GEOTEXTILE
                                                      "SAUSAGE"
                              OVERFLOW         TIMBER SPACER
  RUNOFF                                                                                                                              GRADIENT OF
  WATER WITH                                   TO SUIT                                                                                                                        CAN BE CONSTRUCTED        ALL BATTER
                                                                                                                                      DRAIN 1% TO 5%
  SEDIMENT                                                                                                                                                                    WITH OR WITHOUT           GRADES 2(H):1(V)
                                                                                                                                                                              CHANNEL                                                                                                                                      SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                                        MAX.                                                                        STABILISE STOCKPILE SURFACE
                                                                                                                                      DIRECTION O                                                                                                                                                                          1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
                                                                                                                                                             F FLOW                                                                 EARTH BANK                                    2:1                                          TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
    SEDIMENT                                                                                                                                                                                                                                                            AX.)            SLO                                    DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE




                                                                                                                                                                                                            300mm MIN.
                                                                                                                                                                                                                                                                  PE (M                    PE
                                                           FILTERED WATER
                                                                                                                                                                                                                                           FLOW                SLO                              (MA                            CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
      GRAVEL-FILLED WIRE                                                                                                                                                                                                                                 2:1                                          X.)
                                                                                                                                                                                                                                                                                                                               CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
      MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                                       STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                                                  2m MIN
      "SAUSAGE"
                                                                                                                                           150mm MIN




      MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                                                   NOTE: ONLY TO BE USED AS TEMPORARY                                                                                       SEDIMENT FENCE                             2.               CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
      1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                            BANK WHERE MAXIMUM UPSLOPE LENGTH                                                                                                                                                    THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                                       IS 80 METRES.
                                                                                                                                                                                                                                      STOCKPILE CONSTRUCTION NOTES:                                                        3.               DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
      2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                                          DIVERSION DRAIN CONSTRUCTION NOTES:
           THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                                          1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                               THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                                     1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.
                                                                                                                                                                                                                                             VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                   FITTED WITH SAFETY CAPS.
      3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.                                                            2.      AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                                                      2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                      4.               FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
      4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                                                                                                                                                                                                                                                   ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                                      3.     ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER
           BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                                                                                                                                            3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                               WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                                             IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
           BLOCKS.                                                                                                                                                                                                                           THAN 2 METRES IN HEIGHT.                                                                       GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                      4.     BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                       SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
      5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                                                        4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                                             CROSS-SECTIONS, NOT "V" SHAPED.
                                                                                                                                                                                                                                             FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                 5.               JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
      6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                                                        LESS THAN 0.10.
                                                                                                                                      5.     ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
           GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                                                                                                                               6.               BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
           EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                                                  5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND                               THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                                      6.     COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                                             STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                                             CONSTRUCTION.
                    MESH & GRAVEL INLET FILTER                                                                                                                        DIVERSION DRAIN                                                                                   STOCKPILES                                                                                      SEDIMENT FENCE
                                     SCALE N.T.S                                                                                                                            SCALE N.T.S                                                                                        SCALE N.T.S                                                                                       SCALE: N.T.S.




                                                                                                                                              CLIENT DETAILS:                                                              PROJECT ADDRESS:                                                                 APPROVED BY:                      PROJECT NAME:

                                                                                                                                                                                                                                                                                                                                              PROPOSED COMMERCIAL DEVELOPMENT
                                                                                                                                                                 IRONBARK SMSF PTY LTD                                                                                                                                                        TITLE:                                                          STATUS:

                                                                                                                                                                                                                                            48 ELM STREET                                                                                     EROSION AND SEDIMENT                                            FOR APPROVAL - NOT FOR
       © ABN 89 647 469 707                           03
                                                      02
                                                             28/06/24
                                                             25/05/23
                                                                        RFI UPDATE
                                                                        RFI UPDATE
                                                                                                              JB
                                                                                                             BP
                                                                                                                          AB
                                                                                                                          BP
                                                                                                                                    AB
                                                                                                                                    BP                                                                                                     COOROY, 4570, QLD                                                                                  CONTROL DETAILS                                                 CONSTRUCTION
        75 NOOSA DRIVE                                                                                                              JB
                                                      01     09/02/23   OPW ISSUE                            BP           JB                  SCALE:
     NOOSA HEADS, QLD 4567
         +61 7 5211 1003                             REV      DATE               DESCRIPTION                 DWN      CHK           APP
                                                                                                                                                                           AS INDICATED                                                                                                                                                       DRAWING NUMBER:                                                 PROJECT NUMBER:      SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                                                    SIZE:
     RECORCONSULTING.COM                                                                 REVISIONS
                                                                                                                                                                        DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                                              031                                                              20220206            A1 03
Log in to download the original file

20220206 Elm St OPW RFI Civil Drawings.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.