OR THROUGH AN UNLINED OPEN DRAIN OR CHANNEL, THE SEWER IS TO BE CONCRETE ENCASED.
/
/
O
/
dWM
dE
/
O
(D)
FOR DETAILS
/
O
O O / /
O
/
O
/
(D)
O
/
/
O
ENCASEMENT SHALL EXTEND AT LEAST 1M EACH SIDE OF THE PIPE OR CHANNEL WITH CLEARANCE TO OTHER
/ /
O
/
/
O
O O / /
O
/
O
/
/
O / /
SERVICES MEASURED FROM THE OUTSIDE OF THE ENCASEMENT.
/
(D)
/
O
/
dS
/ /
/
/
/ / /
/ /
O
/ /
/
/ / /
(D)
/
dE
/
12. ALL SANITARY HYDRAULICS AND WATER RETICULATION IS TO BE IN ACCORDANCE WITH AS3500, SYDNEY
/
DECOMMISION EXISTING
/
O
/
/
/ /
dTU
/
dOF
/ / /
/
WATER SERVICE WATER SPECIFICATIONS AND COMPLY WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING RELEVANT
/
O
/
/
dWM
/
/
JURISDICTION.
O
EXISTING HYDRANT
/
/
/
dS
O
TO BE RAISED 13. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND APPROVALS PRIOR TO COMMENCING WORK.
(D)
dE
/
/
O
/
/
/
EXISTING WATER VALVE
O
14. WATER MAINS SHOULD ALWAYS CROSS OVER SEWER AND STORMWATER DRAINS TO AVOID RISK OF
/
/
(NOT LOCATED) TO BE
dTU
H
dOF
/
O
BACKFLOW CONTAMINATION WHEREVER POSSIBLE.
/
/
RAISED
(D)
O
dWM
/
/
/
dE
dS
/ O
/
15. SEWER MUST MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 500MM BELOW A WATER MAIN AND SHALL BE
/
/
/
O
OFFSET BY A MINIMUM HORIZONTAL CLEARANCE OF 1000MM.
20
/
/
O
/
(D)
/
/
O
dTU
dOF
dE
/ 16. WATER MAINS ARE TO BE FLUSHED, CHLORINATED AND PRESSURE TESTED AFTER INSTALLATION. THE
/
/
/ O
/
dS
CONTRACTOR SHALL PROVIDE THE RESULTS OF THESE TESTS TO THE SUPERINTENDANT PRIOR TO
dWM
/ O
/
/
ON-MAINTENANCE INSPECTIONS.
/ O
(D)
/
/
/ O
/
dE
17. CLEAN OUTS, INSPECTION OPENINGS AND CLOSING CAPS SITUATED IN VEHICULAR OR PEDESTRIAN
/
/
O
PROPOSED BUILDING
/
dTU
dOF
/
/
PAVEMENTS ARE TO BE FITTED WITH EITHER BRASS OR CAST-IRON COVERS.
O
dS
/
/
(D)
FFL 109.30
/
O
dWM
/
/
18. ALL IN-GROUND VALVES SHALL BE IN APPROVED CONCRETE PATH BOXES IN ACCORDANCE WITH THE
O
dE
/
/
/
AUTHORITIES REQUIREMENTS.
/ O
/
/
O
(RW)
/
/
EET
(D)
dTU
/
dOF
O
/
19. ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS ARE TO BE WRAPPED IN AN APPROVED
dS
/
/
/
dE
O
FLEXIBLE JOINT WRAPPING.
ELM STR
/
/
dWM
/
/O
/
(D)
O
20. ALL SERVICES ARE TO BE PROTECTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.