Original source · versioned page text
20220206 Elm St OPW RFI Civil Drawings
Original PDF page 3, section 5. The text section number identifies this passage in the reader.
/
(D)
/
//
/
/
dWM
////
/
/
/
//
/
dE
SURVEY, DBYD AND COUNCIL RECORDS. IT IS THE
/
/
/
////
/
//
/
/
/
/
//
/
CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL
////
/
/
/
//
(D)
/
/
dTU
dOF
/
////
dS
/
//
/
/
LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
/
/
10
dE
/
//
/
/
/
/
/
////
8.
dWM
/
EXCAVATION OR TRENCHING WORKS.
//
/
/
0
/
/
/ / /
//
/
/
/
(D)
/
/
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING
//
/
/
/
//
/
/
dE
/
/
dS
/
/
/
/
SERVICES ON SITE PRIOR TO COMMENCEMENT OF WORKS.
/
dTU
/
////
dOF
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
(D)
/
/
/
/
5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS
/
/
/
/
/
/
/
/
/
/
/
/
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.