Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Vegetation removal Approval for Fire Management STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118

of 2

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Document Set ID: 21955679
Version: 1, Version Date: 08/06/2022


[OCR of page images]
14. All machinery is to be controlled by competent operators in possession of appropriate and
current licences/tickets.

15. Contractors must hold Public Liability Insurance in the sum of $20 million.

16. The Dial Before You Dig information obtained (this can be done online at
https://Awww.1100.com.au/) which demonstrates that the tree works will not interfere with
existing underground services, is to be provided to the tree contractor prior to works
commencing.

17. Traffic and pedestrian access and management must be MUTCD (Manual of Uniform
Traffic Control Devices) compliant.

18. Work must be undertaken and completed within 28 days of receipt of approval.

Native wildlife
19. A licensed and qualified fauna spotter/catcher is present at all times during operations.

Stumps

20. Stumps are to be cut as low as possible and poisoned with an appropriate herbicide
application to prevent re-shooting.

OR

21, Stumps must be ground to a minimum depth of 200mm.

22. Stump grinding is to be inclusive of any surface roots that may be reasonably considered
a potential trip hazard to pedestrians.

23. Woodchip produced during stump grinding is to be removed from the site.

24, Depressions created during stump grinding operations must be back filled to existing
ground level with soil containing no more than 2% organic material.

25. Stump grinding sites are to be left in a clean and safe condition for use by pedestrians.

Please note that in order to receive the Bond refund OZCARE must email Council to advise
completion of all works and provide your bank account details. Once inspected and all works
are fully completed and accepted, Council will release the performance bond back to you.

Should you wish to discuss this issue further, please do not hesitate to contact our Natural
Areas team at [email protected]., or Council’s contact officer noted on this
correspondence. Please quote RM2022/09056 for any future communication regarding this
matter.

Yours faithfully,

 

Leo Jensen
Director Environment and Sustainable Development (Acting)

Document Set ID: 21955679
Version: 1, Version Date: 08/06/2022

Used in these records

About this file

File size
194 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Vegetation removal Approval for Fire Management STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 194 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.