Original source · versioned page text
2021-03-15 GC Agenda - Item 9 - Attachment 5 - MCU19-0114 & RAL19 0027 Infrastructure Agreement (44 pages)
The original of this document is very large (38.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
24
SCHEDULE 3
Drawings schedule
Drawing Description Drawing Date Engineering Revision
Number Drawing Number
Number
1 Overall Scope of Works 9 November BP1074/SK/1.01 Issue A
2020
2 Proposed Golf Course 9 November BP1074/SK/1.02 Issue A
Reconfiguration 2020
3 GemLife Master Plan 13 February BP1074/SK/2.01 Issue T
2020
4 Golf Club Site Plan 18 June 2020 BP1074/SK1.01 Issue C
5 Golf Club Floor Plan (Pre 18 June 2020 BP1074/SK2.02 Issue C
fitout)
6 Golf Club Floor Plan (Post 18 June 2020 BP1074/SK2.01 Issue G
fitout)
7 Golf Club Dimension Plan 18 June 2020 BP1074/SK2.03 Issue E
8 Cart / Buggy Store Floor Plan 18 June 2020 BP1074/SK2.04 Issue C
9 Golf Club Elevations 1 and 2 18 June 2020 BP1074/SK3.01 Issue C
10 Golf Club Elevations 3 and 4 18 June 2020 BP1074/SK3.02 Issue C
11 Golf Club Sections 18 June 2020 BP1074/SK3.03 Issue C
12 Perspective – Golf Course 9 November BP1074/SK/1.09 Issue A
Building 2020
13 Golf Course Draft Master February 2020 G288.MP.07 -
Plan 7
Document Set ID: 21379346
Version: 1, Version Date: 27/01/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.