                      Coastal Protection
               12.    External colours and finishes of the building must comprise of muted/environmental tones
                      that blend with the natural environment.
                      Site Access and Driveways
               13.    A sealed access driveway must be provided from the existing formation in Plover Street to
                      all parking and manoeuvring areas of the development. The works must be undertaken in
                      accordance with an Operational Works approval and must include in particular:
                      a.      a driveway crossover generally in accordance with drawings numbered 21624-C1-P5,
                              21624-C2-P5, 21624-C3-P3 and 21624-C4-P2 prepared by Rienmac Pty Ltd dated 16
                              March 2021
                      Stormwater Drainage
               14.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property. The works must be undertaken
                      generally in accordance with drawings numbered 3582-1 dated 16 February 2021, 3582-2
                      Revision A dated 26 March 2021 prepared by Construction Hydraulic
               15.    Prior to the commencement of the use a certificate must be issued by an RPEQ certifying
                      that the stormwater drainage system has been constructed in accordance with the conditions
                      of this permit.
                      Easements
               16.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               17.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               18.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               19.    All works must be carried out in accordance with the recommendations contained in the Soil
                      Test Report – Report No: 200365(S) prepared by Australian Soils Investigations dated 14
                      December 2020
               20.    Prior to the commencement of the use certification must be submitted to Council from a
                      qualified person* which certifies that the development has been constructed in accordance
                      with the Soil Test Report – Report No: 200365(S) prepared by Australian Soils Investigations
                      dated 14 December 2020 and that the development has a minimum factor of safety against
                      landslip of 1.5 in the long term.
                      *(Refer to advisory Note)
                      Earthworks and Retaining Walls
               21.    Earthworks carried out on site must not affect the structural integrity of any adjoining lands
                      and/or buildings and/or structures and/or services that border the development site.
               22.    All fill and associated batters/retaining structures, both temporary and/or permanent, both
                      above and below ground level, must be contained entirely within the subject site unless
                      written permission from the respective landowner(s) is provided to Council. All earthworks
                      must be undertaken in accordance with the provisions of Australian Standard AS3798:
                      Guidelines on Earthworks for Commercial and Residential Developments.




                                                                                                        Page 3 of 6
Document Set ID: 21487816
Version: 3, Version Date: 04/06/2021                                                            Print Date: 25 October 2021, 12:19 PM

Used in these records

About this file

File size
5.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

NC MCU approval.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.