Coastal Protection
12. External colours and finishes of the building must comprise of muted/environmental tones
that blend with the natural environment.
Site Access and Driveways
13. A sealed access driveway must be provided from the existing formation in Plover Street to
all parking and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with drawings numbered 21624-C1-P5,
21624-C2-P5, 21624-C3-P3 and 21624-C4-P2 prepared by Rienmac Pty Ltd dated 16
March 2021
Stormwater Drainage
14. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The works must be undertaken
generally in accordance with drawings numbered 3582-1 dated 16 February 2021, 3582-2
Revision A dated 26 March 2021 prepared by Construction Hydraulic
15. Prior to the commencement of the use a certificate must be issued by an RPEQ certifying
that the stormwater drainage system has been constructed in accordance with the conditions
of this permit.
Easements
16. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
17. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
19. All works must be carried out in accordance with the recommendations contained in the Soil
Test Report – Report No: 200365(S) prepared by Australian Soils Investigations dated 14
December 2020
20. Prior to the commencement of the use certification must be submitted to Council from a
qualified person* which certifies that the development has been constructed in accordance
with the Soil Test Report – Report No: 200365(S) prepared by Australian Soils Investigations
dated 14 December 2020 and that the development has a minimum factor of safety against
landslip of 1.5 in the long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
21. Earthworks carried out on site must not affect the structural integrity of any adjoining lands
and/or buildings and/or structures and/or services that border the development site.
22. All fill and associated batters/retaining structures, both temporary and/or permanent, both
above and below ground level, must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
Page 3 of 6
Document Set ID: 21487816
Version: 3, Version Date: 04/06/2021 Print Date: 25 October 2021, 12:19 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NC MCU approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.