Log in to see the plans as drawnGENERAL NOTES 18. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING 300MM CENTRES SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER
CONSULTANTS/CONTRACTORS DRAWINGS: OR ENCLOSE STOCKPILES WHERE REASONABLY PRACTICAL TO RESTRICT
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. DUST MOVEMENT.
SURVEYOR: NOOSA COOLOOLA LAND SURVEYS PTY LTD EARTHWORKS NOTES
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 20. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS
CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY ARCHITECT: BLACKWOOD ARCHITECTURE 1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN
SETOUT THE WORKS. HYDRAULICS: TBC VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED. CONFIRMATION THAT WORKS CAN COMMENCE.
2. FOR DETAILED GEOTECHNICAL INFORMATION, IT IS RECOMMENDED THAT THE 21. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT STRUCTURAL: RECOR GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE SOIL REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE CONDITIONS PRIOR TO EARTHWORKS COMMENCING.
LANDSCAPE: ELEMENT DESIGN GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT
3. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT
GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED STANDARD 19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY:
OVER THE EXTENT OF THE WORKS UNLESS DIRECTED OTHERWISE AND 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M IN
DRAWINGS AND SPECIFICATIONS U.N.O. ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS
STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS
3. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF MATERIALS MUST NOT BE USED IN STRUCTURAL FILL. ENGINEER.
ASSOCIATED WITH IMPLEMENTATION OF THE TMP.
THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND 4. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT 22. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED,
LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT 20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING SUBGRADE TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE OF A
THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS INCURRED BY RECOR. APPROVALS RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE SPECIALIST SHORING CONTRACTOR.
APPROVALS BY COUNCIL. REMOVED FROM SITE AT CONTRACTORS EXPENSE. 23. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
4. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS
SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS 21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE 5. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE CARRIED
TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF VOLUMES OF WATER COMBINED WITH VIBRATORY COMPACTION EQUIPMENT. OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL
COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF THE THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD CARE MUST BE TAKEN TO ENSURE THERE ARE NO IMPACTS ON ENGINEER.
CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND LEVEL OF ALL RESERVE, PARKS/OPENSPACE, EASEMENTS. SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE 24. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY
EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY WITH GEOTECHNICAL REPORT AND AS1289. CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON THE SITE
22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. 6. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF
DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.
CONTRACTOR TO LOCATE AND PROTECT SERVICES AS REQUIRED DURING ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN AREAS TO SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
PROPOSED WORKS. 23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED 25. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF
ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND PRIOR TO MOBILISATION AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING DRAWINGS FOR
5. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND
CONSTRUCTION CODE (2013). THE SITE. BUILDING SLAB THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR
SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN
ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES 7. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED DRAINAGE FOR DETERMINATION OF REQUIRED BULK EARTHWORKS SURFACE.
WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED AND AS OTHERWISE 26. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
PRIOR TO COMMENCEMENT OF CIVIL WORKS. CONTRACTOR TO IMMEDIATELY STANDARD SIGNS AND LINE MARKING NOTES NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW FOR
REPORT ANY DISCREPANCIES TO RECOR AND AWAIT FORMAL DIRECTION
PRIOR TO COMMENCING CIVIL WORKS. 1. GENERAL FILL MATERIAL SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE
1.1. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH THE MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND THE PRELOADING OPERATIONS.
6. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED
QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROL 27. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, STANDARD. THE MATERIAL SHALL HAVE A MAXIMUM PLASTICITY INDEX OF
DEVICES (CURRENT EDITION).
CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. 15%, A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM
2. SIGNS
7. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO 2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS
C.B.R. OF 10%. INSPECTIONS:
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT NOTED OTHERWISE. 8. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF CONTENT FOR STANDARD COMPACTION.
2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO
INFRASTRUCTURE OWNER/MANAGER / AUTHORITY/COUNCIL. 9. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE
8. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM FACE PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF INSPECTIONS. SHOULD THE
WORKPLACE HEALTH AND SAFETY REQUIREMENTS. OF KERB. RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT.
RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH STRUCTURAL CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
9. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE 2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO
ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION
PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
REQUIREMENTS OF GEOTECHNICAL REPORT.
CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL MEASURES BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
HEADLIGHT. 10. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION
NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND OF RETAINING WALL COLOUR AND FINISH. a. PRESTART
INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW VIBRATION 3. SIGN SUPPORTS
11. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2' SOIL b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT
EQUIPMENT, TRENCH SHORING ETC AS REQUIRED. 3.1. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS WHERE
ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF AS 3798. AND EROSION CONTROL MEASURES UNSUITABLE GROUND
THEY ARE IN A PAVED SURFACE.
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE
DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN 4. LINEMARKING CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS HAVE BEEN c. SIDE AND CUT OFF DRAINS
CONFIRMATION THAT WORKS CAN COMMENCE. 4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF. CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE. AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
BEARING CAPACITY UNDER THE PLATFORM/STRUCTURES AS SPECIFIED BY
CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT
REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR TO JOINTING NOTES THE GEOTECHNICAL REPORT. f. STORMWATER STRUCTURE BASE SLABS
NOTE COUNCILS ADAC REQUIREMENTS. 12. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO
g. SEWER RETICULATION
1. ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF AT
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF h. WATER RETICULATION
APPROVALS. REQUIREMENTS OF AS3727.1:2016.
250MM LOOSE THICKNESS (PRIOR TO COMPACTION). i. PAVEMENT SUBGRADE
2. SAW CUT JOINTS MUST BE:
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, 13. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS
LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL 2.1. BETWEEN 41 AND 31 OF CONCRETE PAVEMENT DEPTHS. PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED 300MM IN j. PAVEMENT REINFORCING
CONSTRUCTION. 2.2. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD. ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL k. PAVEMENT PRIOR TO SEALING (PRESEAL)
2.3. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS. EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL ENGINEER
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION AND LOCAL AUTHORITY REQUIREMENTS. l. RETAINING WALL FOOTING REINFORCING
WORKS COMMENCING ON SITE. 3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT TO
14. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
ALLOW EXPANSION AND CONTRACTION MOVEMENTS.
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS ACCORDANCE WITH LANDSCAPE DRAWINGS.
4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. 15. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES IN o. PRACTICAL COMPLETION
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS. 16. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED
PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT 5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES ONLY MANAGEMENT PLANS. p. ON MAINTENANCE
OF ANY WORKS ON SITE. AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB SURFACE. 17. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE q. OFF MAINTENANCE
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED 6. DOWEL BARS ARE TO BE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE ETC
IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN. r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
IN THE APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO 6.1. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT DEVELOPMENT APPROVAL)
ENSURE ALL TREE ROOTS AND STUMPS ARE COMPLETELY REMOVED AND 18. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR
400MM CENTRES
BACKFILLED TO LEVEL 1 SUPERVISION. CONTRACTOR TO ALLOW TO MULCH RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
6.2. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT
ALL CLEARED VEGETATION AND STOCKPILE ON SITE OR REMOVE FROM SITE AUSTRALIAN STANDARDS AND LEGISLATION. RELEVANT TO THEIR CERTIFICATION SCHEME
300MM CENTRES
AS DIRECTED. 19. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED
6.3. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT LEVEL TO
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
14 WYANDRA STREET, NOOSA HEADS
14 Wyandra Pty Ltd TITLE: STATUS:
GENERAL NOTES FOR APPROVAL
© ABN 89 647 469 707
14 WYANDRA STREET, NOOSA HEADS JARO BAULEKA NOT FOR CONSTRUCTION
37 MARY ST RPEQ: 2693
01 24/08/2022 ISSUED FOR APPROVAL MVP SCALE:
NOOSAVILLE, QLD 4566 CPEng
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
AS INDICATED DATE: 24/08/2022
DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
002 20220171 A1 01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.