Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

engineering plans

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                          1 METER MAX.                  STAR PICKETS

                                             PROVIDE WASH WATER FOR                                                                                     DROP INLET
TIMBER SLEEPER OR METAL                                                                                                                                 WITH GRATE
                                             TRUCKS EXITING SITE
GRID 100mm HIGH AND




                                                                                                                                                                                                                                                                                                                               500 - 600mm
                                             MIN LENG                                                                                                   WIRE OR STEEL MESH
SPACED AT 300mm CTS                                                                                                                                     (14 GAUGE x 150mm                                                                                                   WRAP FILTER
                                                     TH 10m                                                                                             OPENINGS) WHERE GEOTEXTILE                                                                                          CLOTH OVER GRATE
                                                                          BERM 300 HIGH MIN
  CONSTRUCTION SITE                                                                                                                                     IS NOT SELF-SUPPORTING
                                                                                                                                                        WOVEN GEOTEXTILE                                                                                                                                                                                                 1.5m STAR
                                                                               EXISTING ROADWAY                                                                                                                                                                                                                                                                          PICKETS
                                                                                                                                                                                                                                                                                                                                                                         AT MAX. 2.5m CENTRES

  GEOTEXTILE FABRIC                                                                                                                                STAR PICKET                                                                                                                                                                                                        SELF-SUPPORTING
                                                                                                                                                   FITTED WITH                                                                                                                                                                                                        GEOTEXTILE
                                             50-75mm GRAVEL BED                                                                                    SAFETY CAP                                                                                                                                                                                                                     OW
                                             MIN 200mm THICK                                                                                                                                                                                                                                                                                                      DIRECTION OF FL
                 RUNOFF FROM PAD DIRECTED                                                         SANDBAGS                                   WOVEN GEOTEXTILE
                 TO SEDIMENT TRAP
                                                                                                                                                      RUNOFF                                                                        WRAP FILTER
                                                                                                                                                                                                              RUNOFF                                                                                                                                                     ON SOIL, 150mm x 100mm
           TEMPORARY CONSTRUCTION VEHICLE EXIT                                                                                                        WATER WITH                                                                    CLOTH OVER GRATE




                                                                                                                         FLOW
                                                                                                                                                                                                              WATER WITH                                                                                                                                                 TRENCH WITH
                                   SCALE: N.T.S.                                                  WATERWAY                                            SEDIMENT
                                                                                                                                                                                                              SEDIMENT                                                                                                                                                   COMPACTED BACKFILL
                                                                                                                                                                                                                                                                                                                                                                         AND ON ROCK, SET INTO
                                                                                                                                                                                                                                                                                                                                                                         SURFACE CONCRETE




                                                                                                                                                                                                                                                                                                                               600mm MIN.
                                                                                                  EXCAVATION
                                                                                                                                                                                                                                                      FILTERED                                                                                       SECTION DETAIL
                                                                                                                                                                               FILTERED
                                                                                                                                                                                WATER                                                                  WATER
                                                                                                                                                     GEOTEXTILE
                                                                                                  EARTH BANK                                         EMBEDDED 150mm




                                                                                                                                                                                                                                                                                                            MIN. 1.5m
                                                                                                                                                     INTO GROUND                                                                                                                                                                                             20m MAX.
                                                                                                                                             FOR DROP INLETS AT NON-SAG POINTS,                                      GEOTEXTILE INLET FILTER TYPE B                                                                                                                         FLOW
                                                                                                                                             SANDBAGS, EARTH BANK OR EXCAVATION                                                          SCALE N.T.S
                                                                                                                                             USED TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                       STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                       MAX. 2.5m SPACINGS
                                                                                                    GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                        TYPICAL
                                                                                                    1. FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                    2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                          PLAN

                                                                                                    3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS
                                                                                                         OR EARTH BANKS AS SHOWN IN THE DRAWING.

                                                                                                    4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS
                                                                                                                                                                                                                                                                                                                                             DISTURBED             DIRECTION           1.5m STAR PICKETS
                                                                                                         ADEQUATE TO ALLOW FOR ALL WATERS TO BYPASS IT.
                                                                                                                                                                                                                                                                                                                                             AREA                  OF FLOW             AT MAX. 2.5m
                                                                                                                GEOTEXTILE INLET FILTER A                                                                                                                                                                                                                                              CENTRES
                                                                                                                                    SCALE N.T.S

                  TIMBER SPACER                     KERB-SIDE
                  TO SUIT                           INLET




                                                                                                                                                                                                                                                                                                                                             UNDISTURBED
                                                                                                                                                                                                                                                                                                                                             AREAS

                                                    GRAVEL-FILLED WIRE
                                                    MESH OR GEOTEXTILE
                                                    "SAUSAGE"
                            OVERFLOW         TIMBER SPACER
  RUNOFF                                                                                                        GRADIENT OF
  WATER WITH                                 TO SUIT                                                                                                 CAN BE CONSTRUCTED        ALL BATTER
                                                                                                                DRAIN 1% TO 5%
  SEDIMENT                                                                                                                                           WITH OR WITHOUT           GRADES 2(H):1(V)
                                                                                                                                                     CHANNEL                                                                                                                                                SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                               MAX.                                                                        STABILISE STOCKPILE SURFACE
                                                                                                                DIRECTION O                                                                                                                                                                                 1. CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL
                                                                                                                                    F FLOW                                                             EARTH BANK                                        2:1                                                    TO THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE




                                                                                                                                                                                   300mm MIN.
    SEDIMENT                                                                                                                                                                                                                                A   X.)            SLO                                              DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                       E (M                          PE
                                                                                                                                                                                                              FLOW               LOP                                      (MA                                   CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
      GRAVEL-FILLED WIRE                           FILTERED WATER                                                                                                                                                           2:1 S                                               X.)
                                                                                                                                                                                                                                                                                                                CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
      MESH OR GEOTEXTILE                                                                                                                                                                                                                                                                                        STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                        2m MIN
                                                                                                                     150mm MIN




      "SAUSAGE"
      MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:                                                                              NOTE: ONLY TO BE USED AS TEMPORARY                                                                                   SEDIMENT FENCE                                       2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR
      1. INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                       BANK WHERE MAXIMUM UPSLOPE LENGTH                                                                                                                                                     THE BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                  IS 80 METRES.
                                                                                                                                                                                                         STOCKPILE CONSTRUCTION NOTES:                                                                      3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
      2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN                                     DIVERSION DRAIN CONSTRUCTION NOTES:
           THE LENGTH OF THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                             1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                        THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                1. BUILD WITH GRADIENTS BETWEEN 1% AND 5%.
                                                                                                                                                                                                                VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                            FITTED WITH SAFETY CAPS.
      3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH x 400mm WIDE.                                      2.      AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                         2.     CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                    4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
      4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE                                                                                                                                                                                                                                               ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                3.      ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER
           BETWEEN IT AND THE KERB INLET. MAINTAIN THE OPENING WITH SPACER                                                                                                                               3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                        WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                        IRREGULARITIES THAT COULD IMPEDE WATER FLOW.
           BLOCKS.                                                                                                                                                                                              THAN 2 METRES IN HEIGHT.                                                                                GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                4.      BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                        SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
      5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING THE FILTER.                                                                                                                           4.     WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                        CROSS-SECTIONS, NOT "V" SHAPED.
                                                                                                                                                                                                                FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                               5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
      6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR                                                                                                                                           LESS THAN 0.10.
                                                                                                                5.      ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
           GEOTEXTILE PROVIDING THEY ARE PLACED SO THAT THEY CAN FIRMLY ABUT                                                                                                                                                                                                                                6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
           EACH OTHER AND SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                                                     5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER AROUND                                        THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                6.      COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF
                                                                                                                                                                                                                STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                        CONSTRUCTION.
                    MESH & GRAVEL INLET FILTER                                                                                               DIVERSION DRAIN                                                                                STOCKPILES                                                                                          SEDIMENT FENCE
                                   SCALE N.T.S                                                                                                     SCALE N.T.S                                                                                        SCALE N.T.S                                                                                        SCALE: N.T.S.




                                                                                                                                 CLIENT DETAILS:                                                  PROJECT ADDRESS:                                                                    APPROVED BY:                             PROJECT NAME:

                                                                                                                                                                                                                                                                                                                              14 WYANDRA STREET, NOOSA HEADS
                                                                                                                                                   14 Wyandra Pty Ltd                                                                                                                                                          TITLE:                                                      STATUS:

                                                                                                                                                                                                                                                                                                                               EROSION SEDIMENT                                            FOR APPROVAL
                                                                                                                                                                                                  14 WYANDRA STREET, NOOSA HEADS                                                                                                                                                           NOT FOR CONSTRUCTION
            © ABN 89 647 469 707                                                                                                                                                                                                                                                               JARO BAULEKA                    CONTROL DETAILS
               37 MARY ST                                                                                                                                                                                                                                                                        RPEQ: 2693
                                                     01   24/08/2022 ISSUED FOR APPROVAL          MVP                            SCALE:
           NOOSAVILLE, QLD 4566                                                                                                                                                                                                                                                                    CPEng
              +61 7 5211 1003                      REV     DATE              DESCRIPTION          DWN     CHK        APP
                                                                                                                                                      AS INDICATED                                                                                                                             DATE: 24/08/2022
                                                                                                                                                                                                                                                                                                                               DRAWING NUMBER:                                             PROJECT NUMBER:   SHEET REV:
                                                                                                                                                                                                                                                                                                                                                                                                              SIZE:
           RECORCONSULTING.COM                                                     REVISIONS
                                                                                                                                                   DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                               031                                                         20220171          A1 01
Log in to download the original file

engineering plans.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.