Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                               ACCEPTABLE OUTCOMES                                      COMMENTS

 does not present an appearance of excessive bulk and
 overdevelopment when viewed from adjoining and
 adjacent properties, any watercourses or the street.
  Gross floor area - Noosa Heads Locality,                          S14.1                                                    Refer to architectural plans
  Detached House Zone, 6-14 Park Road
  O14                                                               If on premises at 6-14 Park Road Noosa Heads, the        prepared by Nettleton Tribe for
  The gross floor area and bulk and scale of buildings and          maximum gross floor area does not exceed 150m2.          details.
  other roofed structures–
  a)    has a low site impact to maximise the opportunity
        to retain natural site characteristics such as native
        vegetation and natural landforms; and
 maintains the safety of people and property from the
 risk of landslide and bushfire.
  Roof form                                                         S15.1 Buildings and structures do not include roof top   Refer to architectural plans
  O15 Roof forms—                                                   terrace areas.
  a) contribute positively to the local skyline;                                                                             prepared by Nettleton Tribe for
  b) complement the low density character of the                                                                             details.
     locality;
  c) do not present an appearance of excessive bulk to
     side neighbours (ie. avoid low pitched roofs or box
     profiles/parapets without eaves);
  d) use simple traditional roof designs; and
  e)    do not create opportunities for residents to overlook the
        private open space areas of neighbouring properties.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 12 of 20
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 104 (of 138)

Section 2

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                           COMMENTS

 Streetscape & character–Kin Kin village                         S16.1 If in Kin Kin village, buildings–
                                                                 a)   for the front elevation, have recessed or framed
 O16                                                                  windows and doorways that are vertically
 For Kin Kin village, the predominant Queensland vernacular           proportioned and placed symmetrically in the
 detached housing form is retained and enhanced by                    building façade; and
 incorporating design elements reflecting or interpreting        b)   if more than 1 storey in height - have clearly defined
 elements of this style of housing.                                   vertical separation of floors by way of design
                                                                      features such as verandas or changes of materials
                                                                      or finishes.
  Streetscape & character–Boreen Point village                    S17.1                                                        Refer to architectural plans
  O17                                                            If in Boreen Point village and a
   For Boreen Point village, the lakeside holiday detached        Detached house—                                              prepared by Nettleton Tribe for
  housing character is maintained and enhanced by                 a) any building within 9m of the primary frontage and        details.
  ensuring the scale, bulk and siting of buildings and                  more than 1 storey in height, has any upper storeys
  structures do not—                                                    set back at least 3m further from the primary
  a)    visually dominate the lot, dwelling units on adjoining          frontage than the storey below;
        lots or the frontage;                                     S17.2                                                        Refer to architectural plans
  b)    detract from the visual amenity of the streetscape        Where located on a lot less than 600m 2 in area—
        and surrounding village; and                              a)     the combined gross floor area of all buildings        prepared by Nettleton Tribe for
  c)    result in a loss of natural light to adjoining                   does not exceed 180m 2; or                            details.
        dwellings or their private open space areas.              b)     if the Detached house consists of 3 or more
                                                                         buildings and at least 2 contain habitable
                                                                         rooms, the combined gross floor area of all
                                                                         buildings does not exceed 230m 2.
  Garages, carports and other Class 10a                           S18.1                                                        Refer to architectural plans
  buildings                                                       Within the Detached Housing, Semi- Attached Housing,
  O18                                                             Attached Housing and Visitor Mixed Use Zones, garages,       prepared by Nettleton Tribe for
  Within the Detached Housing, Semi- Attached Housing,            carports and other class 10a buildings—                      details.



 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 13 of 20
July 2017

Section 3

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                              COMMENTS
  Attached Housing and Visitor Mixed Use Zones, garages,          a)    have a front boundary setback of at least 6m; and
  carports and other class 10 buildings are designed and          b)    garage doors that face the street and are visible
  sited to visually integrate with any associated dwelling unit         from the road frontage have a maximum width of
  and avoid dominating the street by—                                   6m within any one plane, with additional garage
  a)     minimising the width of the garage or carport;                 doors setback an additional 1m from the frontage
         and                                                            to break up the width of the garage façade.
  b)     minimising projection of the garage or carport
         forward of the main face of the dwelling unit,


  14.96 Effects of use
 Lighting                                                         S19.1                                                            Refer to electrical engineers plans
 O19                                                               A 1.5m landscaped buffer separates any private tennis
                                                                  court or other sports court from side property                   for further details prior to OPW
 Lighting associated with the use or works does not have an       boundaries;                                                      commencement.
 adverse impact upon the amenity enjoyed by users of
 adjoining or nearby premises nor do it cause unreasonable
 disturbance to local fauna.                                      S19.2                                                            Refer to electrical engineers plans
                                                                  Tennis courts or half courts are fenced with fencing of          for further details prior to OPW
                                                                  3.6m in height for a full sized court or 2.4m in height          commencement.
                                                                  for a half court;



                                                                  S19.3                                                            Refer to electrical engineers plans
                                                                  Any lit tennis court or other sports court is located at least   for further details prior to OPW
                                                                  60m from the external wall of an existing or approved            commencement.
                                                                  residential dwelling on an adjacent or nearby lot (as



 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 14 of 20
July 2017

Section 4

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                          COMMENTS
                                                            measured from the centre line of the court);


                                                            S19.4                                                        Refer to electrical engineers plans
                                                            For lighting–                                                for further details prior to OPW
                                                            a)     the vertical illumination resulting from direct,      commencement.
                                                                   reflected or other incidental lighting emanating
                                                                   from the site does not exceed 8 lux when
                                                                   measured at any point 1.5m outside the boundary
                                                                   and at any level from ground level upward;
                                                            b)     all flood lighting is hooded or baffled to direct
                                                                   lighting downward or is of a type that gives no
                                                                   upward component of light when mounted
                                                                   horizontally;
                                                            c)     all flood lighting is setback a minimum of–
                                                                     i)    6m from the boundary to any
                                                                           frontage; and
                                                                     ii) 2m to any other boundary; and
                                                            d)     lighting structures are not more than 8m in height.
  Environmental Protection                                  S20.1
 O20                                                        Where there is an existing building envelope on the
                                                            lot that contains vegetation protection measures,
 The design, siting and construction of buildings and       clearing of native vegetation and building works do
 structures minimise the clearing of vegetation and where   not extend beyond the building envelope, except for
                                                            the purposes of a driveway access;




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 15 of 20
July 2017

Section 5

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                         COMMENTS
 there is an existing preliminary approval for the property that    S20.2
 contains vegetation protection measures, the proposal is           Where there is no building envelope existing on the lot,
 consistent with those measures.                                    clearing of native vegetation, other than for a driveway
                                                                    access does not extend beyond—
                                                                    a) 30m of a building or 10m of a structure on lots
                                                                        greater than 10ha;
                                                                    b) 10m of a building or structure on lots 10ha or less
                                                                        but more than 0.3ha; or
                                                                    c) 3m of a building or structure on lots 0.3ha or less.
  14.97 Self-contained units – building works
  O21                                                               S21.1
  Building works do not result in an increase in the number of      A Detached House or Community residence or
  self-contained accommodation units or dwelling units on a         dwelling unit contains no more than 1 kitchen and 1
  property.                                                         laundry.


 O22                                                                S22.1
                                                                    Studios, pavilions or other habitable outbuildings have
 A Detached house accommodates 1 household only.                    a maximum gross floor area of 50m2;


                                                                   S22.2
                                                                   No part of a Detached house or Community residence
                                                                   containing habitable rooms is more than 25m from another
                                                                   part of the Detached house or Community residence.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 16 of 20
July 2017

Section 6

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                             COMMENTS

 14.98 Protection of Extractive Resources
  O23                                                           S23.1
  Where located within proximity of protected extractive        Where located within an extractive resource area on
  resources, building works for Residential Uses and            Overlay Maps OM1.5— OM9.5, residential or
  Community Uses incorporate design, orientation, and           community buildings—
  construction measures that mitigate the effects of noise,     a) are located at least 200m from the Extractive
  dust, ground vibration, or air blast overpressure from the        Resource/Processing Area; and
  extractive industry.                                          b) achieve a minimum sound transmission class
                                                                    rating of 30 for any windows or glass doors on the
                                                                    wall closest to the Extractive Resource/Processing
                                                                    Area.
  14.99 Amenity
  O24                                                          S24.1
  The removal building does not have an adverse impact         Any part of the removal building that is affected by termite
  on the amenity of the premises or surrounding premises.      attack, borers, dry rot or severe weathering is repaired or
                                                               replaced using new or sound second-hand materials;
    Editor’s note:
    Council’s Environmental Health Section has                 S24.2
    guidelines for the transportation and disposal of          Any part of the removal building that is damaged as a
    building materials containing asbestos. Locally,           consequence of relocation is repaired using new or
    asbestos can only be disposed of at Council’s landfill     sound second-hand materials;
    at Eumundi Road Noosaville.
                                                               S24.3
                                                                Where located in a town or village, external surfaces of the
                                                               removal building are cleaned and painted.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 17 of 20
July 2017

Section 7

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                          COMMENTS

  14.100 Built form
  Sloping Sites & Ridgelines                                     S25.1                                                       N/A.
  O25                                                            Buildings are not constructed on land with a slope
   Detached houses and Ancillary dwelling                        greater than 1 in 3 (33%);
  units in the Rural and Rural Settlement Zones on
  sloping sites —                                               S25.2                                                        N/A
                                                                Buildings are of split level design that step down the
  a)     are responsive to the natural topography of the site
                                                                slope or are designed with a suspended floor
         to minimise the need for cut and fill;
                                                                construction to minimise cut and fill;
  b)     do not visually dominate the hill slope or interrupt
         the skyline;
                                                                S25.3                                                        Development will comply.
  c)     are visually integrated with the natural site          Cut or fill is less than 2m in depth relative to natural
         characteristics including vegetation.                  ground level;


                                                                S25.4                                                        Development will comply.
                                                                Buildings present no more than 2 storeys at any one
                                                                point;


                                                                S25.5                                                        Development will comply.
                                                                The distance between the ground and the lowest part of
                                                                the floor of the building does not exceed 3m;

                                                                S25.6                                                        N/A
                                                                The building incorporates undercroft skirting or screening
                                                                (e.g. timber battens) to the full height of any undercroft
                                                                area exceeding 3m above the ground;



 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 18 of 20
July 2017

Section 8

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                               COMMENTS
                                                                S25.7                                                             N/A
                                                                The building incorporates landscape screening for the
                                                                full height of any undercroft area exceeding 3m above
                                                                the ground.
                                                                Editor’s note
                                                                 The following is a useful guide for ensuring that buildings on
                                                                 sloping sites and ridgelines blend with the natural surrounds
                                                                 and minimise glare and reflection. Appropriate colours will
                                                                 depend on the existing native vegetation and backdrop, but
                                                                 may include muted earth/environmental tones such as–
                                                                      •    green;
                                                                      •    olive green;
                                                                      •    blue green;
                                                                      •    grey green;
                                                                      •    yellow green;
                                                                      •    green blue;
                                                                      •    blue
                                                                      •    violet,
                                                                      •    indigo;
                                                                      •    brown;
                                                                      •    blue grey; and
                                                                green yellow.

  14.101 Landscaping
  O26                                                           S26.1                                                             Refer to landscape architects plans
  The flood detention and amenity functions of areas            No building works, filling or excavation works are within
  adjacent to the revetment walls within Noosa Waters           4.5m of the centre line of the top of the concrete                for details.
  Estate are retained and enhanced by ensuring—                 revetment wall;
   a) works do not protrude through a batter line of 1:4.5      S26.2
         measured from the centre line of the revetment wall;   A minimum of 25% of the area within 4.5m of the




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 19 of 20
July 2017

Section 9

Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                          COMMENTS

   b)    there is no additional load placed on the                revetment wall is planted with shrubs and trees with a       Refer to landscape architects plans
          revetment wall; and                                     mature height of 3m or less;                                 for details.
   c)    works do not pose a risk to the membrane adjoining
          the revetment wall.
                                                                  S26.3                                                        Refer to landscape architects plans
   d)    the amenity of the locality is not adversely affected
          by the building works, filling or excavation works or   A maximum of 25% of the area within 4.5m of the              for details.
          improvements.                                           revetment wall is under hard pavement and the balance is
                                                                  to be grass, ground covers or scrubs provided no shrubs
                                                                  are planted within the first 1m of the revetment wall;
                                                                  S26.4                                                        Refer to landscape architects plans
                                                                  No tree species with a mature height of over 3m are
                                                                  planted within 4.5m of the revetment wall;                   for details.


                                                                  S26.5                                                        Refer to landscape architects plans
                                                                  The ground surface within the first metre from the
                                                                  revetment wall is turf or groundcover;                       for details.


                                                                  S26.6                                                        Refer to landscape architects plans
                                                                  Side boundary fences within 4.5m of the revetment wall       for details.
                                                                  taper down to a maximum height of 1.2m at the revetment
                                                                  wall and no more than 1.5m at a distance of 2.25m from the
                                                                  revetment wall.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 20 of 20
July 2017

Section 10

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                  COMMENTS

  14.112 General
 O1                                                        S1.1                                                                  ✓
                                                           Vehicular access is located and designed in
 Vehicular access does not adversely impact on safety,     accordance withAS/NZS2890.1:2004;
                                                                                                                Refer to architectural plans
 capacity and operations of the existing or planned road                                                        prepared by Nettleton Tribe for
 network, the proposed driveway, cycleways or pedestrian                                                        details.
 pathway systems.
                                                                                                                Driveway’s to be constructed in
                                                                                                                accordance with NSC guidelines
                                                                                                                and standard IPWEAQ drawing RS-
                                                                                                                051.
                                                           S1.2                                                                  ✓
                                                           Only one footpath crossing is provided
                                                                                                                Refer to architectural plans
                                                                                                                prepared by Nettleton Tribe for
                                                                                                                details.
                                                                                                                To be complied with at detailed
                                                                                                                design / construction stages and in
                                                                                                                accordance with Council DA and
                                                                                                                OPW approval conditions.
                                                           S1.3                                                                  ✓
                                                           Driveways, have a maximum grade in accordance with
                                                           Council’s standard requirements.
                                                                                                                Driveway’s to be constructed in
                                                                                                                accordance with NSC guidelines




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 8
July 2017

Section 11

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                       COMMENTS
                                                                                                                    and standard IPWEAQ drawing RS-
                                                                                                                    051.
  O2                                                      S2.1                                                                       ✓
  Driveways and crossovers—                               Design of the driveway across the footpath is in
  a) are suitable and safe for their intended use; and    accordance with Council’s Standard Drawing
                                                                                                                    Driveway’s to be constructed in
  b) match Council infrastructure.                        requirements as appropriate for the particular type of    accordance with NSC guidelines
                                                          development as annotated on the drawings;                 and standard IPWEAQ drawing RS-
                                                                                                                    051.
                                                          S2.2                                                                       ✓
                                                          Driveways are designed and constructed in accordance
                                                          with Council Standard Drawing requirements , as
                                                                                                                    To be complied with at detailed
                                                          appropriate for the particular type of development as     design / construction stages and in
                                                          annotated on the drawings;                                accordance with Council DA and
                                                                                                                    OPW approval conditions.
                                                          S2.3                                                                       ✓
                                                          The change in grades in the driveways and ramps is in     To be complied with at detailed
                                                          accordance with Council’s Standard Drawing requirements   design / construction stages and in
                                                                                                                    accordance with Council DA and
                                                                                                                    OPW approval conditions.
  O3                                                       S3.1                                                                      ✓
  In commercial zoned areas, the number of driveways       Design of multi-tenanted developments in commercial
  across pedestrian footpaths is minimised.                zoned areas include shared driveways and parking
                                                                                                                    Refer to architectural plans
                                                           areas;                                                   prepared by Nettleton Tribe for
                                                                                                                    details.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 8
July 2017

Section 12

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                          COMMENTS


                                                                S3.2                                                                         ✓
                                                                Driveways are located so they abut existing driveways of
                                                                adjoining development where practicable and reciprocal
                                                                                                                            Refer to architectural plans
                                                                easements are created to reduce the sealed driveway         prepared by Nettleton Tribe for
                                                                width.                                                      details.
                                                                                                                            To be complied with at detailed
                                                                                                                            design / construction stages and in
                                                                                                                            accordance with Council DA and
                                                                                                                            OPW approval conditions.
  O4                                                            S4.1                                                                         ✓
  Vehicular access does not adversely impact on the             Footpath and kerb crossings are located clear of existing
  capacity, operations and maintenance of the existing          stormwater inlet structures, water and sewerage
                                                                                                                            To be complied with at detailed
  infrastructure;                                               infrastructure fittings, any other exiting utility          design / construction stages.
                                                                infrastructure, existing landscaping and vegetation.

 O5                                                            S5.1
 Vehicular access does not adversely impact on the health      Vehicular access avoids disturbance to the tree protection
 and integrity of existing landscaping or native vegetation,   zone of trees on public land.
 where possible.
 O6                                                            S6.1 For—                                                                     ✓
                                                                a)   Ancillary dwelling unit, Multiple housing Type
 Driveway run-off is filtered prior to leaving the premises.         2 if less than 5 carparking spaces, Visitor            To be complied with at detailed
                                                                     accommodation Type 1 and Home- based                   design / construction stages.
                                                                     business Type 3—the driveway is formed to drain
                                                                     to landscaped areas; and



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 8
July 2017

Section 13

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                         COMMENTS

                                                              for other uses—grease and oil arrestors or stormwater
                                                              quality improvement devices are incorporated into the
                                                              design to treat run-off prior to run-off exiting from the
                                                              premises.

  14.113 Carpark design and layout
  O7                                                          S7.1                                                        Refer to architectural plans
  Sufficient carparking is provided to accommodate the        The number of parking and loading bays is not less than
  number and type of vehicles likely to be generated by the   the minimum number specified in Table 14-51 Vehicle         prepared by Nettleton Tribe for
  development having regard to the specifics of the use       Parking Requirements;                                       details.
  including—
  a)    the type and intensity of land use;
  b)    any existing parking available on the site;
  c)    hours of operation;
  d)    likely numbers of users;
  e)    the peak parking demand periods of uses on the
        site; and
 the availability of alternative carparking.
  O8                                                          S8.1                                                        Refer to architectural plans
  The layout of the development provides adequate,
  clearly defined and easily accessible—                       Buildings and structures are setback a minimum of 20m      prepared by Nettleton Tribe for
  a)    on-site vehicle parking and manoeuvring               from a water supply pipeline as shown on Overlay Map        details.
        areas; and                                            OM3.5.
  loading and manoeuvring areas for delivery and service
  vehicles.                                                   S8.2 The number of loading bays is not less than the        Refer to architectural plans
                                                              minimum number specified in Table 14-51.                    prepared by Nettleton Tribe for
                                                                                                                          details.



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 4 of 8
July 2017

Section 14

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                        ACCEPTABLE OUTCOMES                                         COMMENTS
  O9                                                         S9.1                                                        Refer to architectural plans
  Parking areas are located where they will not unduly       Carparking areas are accessed from rear laneways
  conflict with pedestrians and will not dominate the        where practicable.                                          prepared by Nettleton Tribe for
  streetscape.                                                                                                           details.

 O10                                                          S10.1                                                      Refer to architectural plans
 Provision is made for a reasonable number of onsite car      Carparking spaces are provided for people with             prepared by Nettleton Tribe for
 parking spaces identified and reserved for people with       disabilities at the rate specified in the Australian       details.
 disabilities.                                                Standards for Off-street Carparking.
  O11                                                        S11.1                                                                        ✓
  Access and egress points do not impact on the safety and   Vehicle manoeuvring areas are provided in
  operations of the road system.                             accordance with Australian Standards for Off-street
                                                                                                                         Refer to architectural plans
                                                             Carparking so vehicles enter and leave the site in a        prepared by Nettleton Tribe for
                                                             forward gear.                                               details.
                                                                                                                         To be complied with at detailed
                                                                                                                         design / construction stages.
  O12                                                        S12.1                                                                        ✓
  Parking areas are designed to -                            At locations where pedestrian and vehicle conflicts are
  a)     provide a progressive reduction in speed between    likely to occur –
                                                                                                                         To be complied with at detailed
         the external road and internal parking spaces;      a) sight distances of at least 2.5 seconds of travel time   design / construction stages.
  b)     ensure lower speeds near areas of high                    at the designated speed are provided;
         pedestrian activity through the use of              b) splayed corners on structures are incorporated;
         appropriate road geometry or devices                c) landscaping is designed to allow clear views; and
         designed to limit speed; and                        d) sign placement ensures that sight distance
  maintain sight distances which are appropriate for the           requirements are not impeded.
  likely operating speeds in all areas of potential




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 5 of 8
July 2017

Section 15

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                           COMMENTS
  pedestrian/vehicle and vehicle/vehicle conflict.


  O13                                                              S13.1                                                         N/A
  A clearly defined pedestrian network is provided                  In large open car parks with greater than 200 car
  that –                                                           parking spaces, a pedestrian path between parking
  a)     is located in areas where people will choose to walk;     spaces is provided on every second aisle.
  b)     ensures that pedestrian movement through car
         parking areas or structures are along aisles rather
         than across them.
  O14                                                              S14.1
  Provision is made for pedestrian and vehicular queues at         No probable solution identified;
  conflict points.
 O15                                                               S15.1                                                         Refer to architectural plans
 Parking areas are lit to provide security for night-time users.   Lighting is provided in accordance with the Australian        prepared by Nettleton Tribe for
                                                                   Standard for Road Lighting - Vehicular Traffic (Category V)   details.
                                                                   Lighting - Performance Installation and Design
                                                                   Requirements.
 O16                                                                S16.1                                                        N/A
                                                                    Resident carparking is limited to one space per dwelling
 In mixed use areas of Business centres residents do not            unit or accommodation unit;
 compete with customers for carparking spaces.
                                                                   S16.2                                                         N/A
                                                                   Resident carparking is not located in the road reserve or
                                                                   between the residential or business building and the
                                                                   principal street frontage.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 6 of 8
July 2017

Section 16

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                          COMMENTS
  O17                                                             No solution provided                                         Refer to landscape architects plans
  Car parking areas are landscaped to—
  a)   provide shade;                                                                                                          for details.
  b)   maximise infiltration of stormwater run-off;
  c)   define parking areas;
  d)   reduce direct visibility of car parking areas from
       external viewpoints; and
  e)   soften views of hardstand areas.
 O18                                                              No solution provided
 Development with the potential to generate significant traffic
 and parking impacts gives appropriate consideration to
 transport and land use issues27.
 Motor Cycles & Motor Scooters                                    S19.1                                                        Refer to architectural plans
 O19                                                              For Commercial businesses, Entertainment & dining
                                                                  business, Industrial business Types 1 and 2, Retail          prepared by Nettleton Tribe for
 Designated Motor cycle or motor scooter parking spaces           business Types 2, 4, 5, 6 and 7, Education Types 1           details.
 reduce the reliance on cars.                                     and 2, Open Space, Wellbeing Uses and Transport
                                                                  Types 1, 2, 3 and 4 motor cycle parking spaces accord
                                                                  with Planning Scheme Policy PSP26 Motor Cycle &
                                                                  Motor Scooter Parking.
 O20                                                               S20.1                                                                         ✓
                                                                   Grease and oil arrestors or stormwater quality
 Carparks are designed to ensure run-off is treated to remove      improvement devices are incorporated into the
                                                                                                                               Refer to civil engineering report in
 pollutants prior to leaving the premise.                          design to treat run-off prior to it leaving the premises.   specific stormwater quality section
                                                                                                                               prepared by this office.
  O21                                                              No solution provided                                        Development will comply.
  Carparking areas are designed to ensure drainage without




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 7 of 8
July 2017

Section 17

Noosa Shire Council – The Noosa Plan
Driveways and Carparking Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                              COMMENTS
  the use of pumps or other electrical apparatus.self-
  contained accommodation units or dwelling units on a
  property.
  O22                                                     S22.1                                                            Refer to landscape architects plans
 Site layout and building design provides for
                                                          Below ground components of buildings, including car parks,       for details.
 soft landscaping to be established.
                                                          do not extend beyond the above ground footprint to allow
                                                          for the provision of landscaping, particularly within building
                                                          setbacks.




  Education Types 1, 2 or 3                               S23.1                                                            Refer to architectural plans
  O23                                                     Paved setdown areas are provided within the site;
  Carparking and setdown areas are designed and located                                                                    prepared by Nettleton Tribe for
  to facilitate their safe and efficient use.                                                                              details.
                                                          S23.2                                                            Refer to architectural plans
                                                           For a minimum of 50% of carparking spaces, pedestrian
                                                          access to buildings is not across or through driveways,          prepared by Nettleton Tribe for
                                                          carparks, setdown or manoeuvring areas;                          details.

                                                          S23.3                                                            Refer to architectural plans
                                                          Carparking and setdown areas are visible from off-site,
                                                          or signed.                                                       prepared by Nettleton Tribe for
                                                                                                                           details.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 8 of 8
July 2017

Section 18

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                              COMMENTS

  14.119 Effects of works
  Drainage                                                       S1.1
 O1                                                              The finished surface gradient of any filled or excavated
                                                                                                                                                    ✓
                                                                 area is within the range 0.5% to 1.5% and drains to
 Finished surface levels ensure land is free draining.           Council’s stormwater infrastructure where available or
                                                                 where stormwater infrastructure is not available, toward the     To be complied with at detailed
                                                                 street.                                                          design / construction stages.
   Hydraulics                                                    No solution provided.                                            N/A
 O2
 Any change to the level of the land does not have an adverse                                                                     Site not affected by flooding
 flooding impact on the flooding and drainage characteristics
 off-site.
   Geotechnical considerations                                    For assessable development—                                                       ✓
   O3                                                             S3.1
   Earthworks do not result in geotechnical instability on the
                                                                  Filling works are undertaken in accordance with                 To be complied with at detailed
   premises or nearby premises.
                                                                  Section 2.8- Filling of Site of Council’s PSP5 -
                                                                  Engineering Design Standards- Roads and Drainage &
                                                                                                                                  design / construction stages.
                                                                  Earthworks
                                                                  S3.2                                                                              ✓
                                                                  Where the filling is for residential commercial or industrial
                                                                  purposes the works comply with Australian Standard -
                                                                  Guidelines for earthworks on commercial & residential           To be complied with at detailed
                                                                  development.                                                    design / construction stages.
  Local amenity                                                   S4.1                                                                              ✓
  O4                                                              The following control measures are
  Earthworks do not cause disturbance to the amenity of the       implemented—
  neighbouring land.                                                  a) regular water spraying of exposed areas to



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 5
July 2017

Section 19

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                                         suppress dust;                                       To be complied with at detailed
                                                                     b) provision of dust stabilised or sealed internal       design / construction stages.
                                                                         roads;
                                                                     c) protective covering of exposed areas that are
                                                                         left for more than 2 weeks; and
                                                                     d) if there is no valid development permit for the
                                                                         site, disturbed areas are revegetated using
                                                                         species identified in PSP3 - Landscaping
                                                                         Plants and Guidelines;
                                                                 S4.2                                                                          ✓
                                                                  Earthworks are undertaken only during the hours of 7am
                                                                 to 6pm, Monday to Friday and 7am to 6pm on Saturday.
                                                                 No work is undertaken on Sunday or public holidays.          To be complied with at detailed
                                                                                                                              design / construction stages.
  Vegetative Waste                                               S5.1                                                                          ✓
 O5                                                              Cleared vegetation is transported off-site for disposal in
                                                                 an approved green waste disposal facility;
 Vegetation cleared from a development site is disposed of in                                                                 To be complied with at detailed
 an environmentally responsible manner.                                                                                       design / construction stages.
                                                                 S5.2                                                                          ✓
                                                                 Cleared vegetation is mulched on-site and reused for
                                                                 landscaping of the finished development;
                                                                                                                              To be complied with at detailed
                                                                                                                              design / construction stages.
                                                                S5.3                                                                           ✓




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 5
July 2017

Section 20

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                               COMMENTS
                                                                   Cleared vegetation is disposed of for the purpose of              To be complied with at detailed
                                                                   firewood. (Note: Disposal of vegetative waste by burning off      design / construction stages.
                                                                   is not an acceptable method of disposal).
  Managing contamination risk                                       S6.1                                                                              ✓
 O6                                                                 The fill material is solid clean earth, free of putrescible or
                                                                    refuse material, vegetation, acid sulfate soils, building or
 Materials used as fill are suitable for development of the land    construction material or other material or contaminants;         To be complied with at detailed
 and filling or excavation works do not result in the                                                                                design / construction stages.
 contamination of land.
                                                                   S6.2                                                              N/A
                                                                   The site is not on the contaminated land register.
  Haulage activity and amenity                                                                                                                        ✓
  O7                                                                No solution provided
  Haulage of material to and from a site ensures—
  a) minimal disturbance to neighbouring properties                                                                                  To be complied with at detailed
      and properties along the haulage route; and                                                                                    design / construction stages.
  b) Council’s road infrastructure including
      pavements is not adversely affected.

  Extent of earthworks                                              S8.1                                                                              ✓
  O8                                                                All earthworks, including cut and fill batters, retaining
  Earthworks are contained within the subject                       walls etc are contained within the subject site.
  property.                                                                                                                          To be complied with at detailed
                                                                                                                                     design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 5
July 2017

Section 21

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                       ACCEPTABLE OUTCOMES                                             COMMENTS
  Sloping sites                                              S9.1                                                                            ✓
  O9                                                         Cut or fill is less than 2m in depth relative to the natural
  On sloping sites, excavation or filling are designed to    ground surface.
  maximise the use of natural slope and minimise the need                                                                   To be complied with at detailed
  for cut and fill.                                                                                                         design / construction stages.
 O10                                                        S10.1                                                                            ✓
 Provision is made for a reasonable number of onsite car    Carparking spaces are provided for people with disabilities
 parking spaces identified and reserved for people with     at the rate specified in the Australian Standards for Off-      To be complied with at detailed
 disabilities.                                              street Carparking.                                              design / construction stages.
  Environmental protection                                                                                                                   ✓
  O10                                                        No solution provided.
  Earthworks minimise any adverse impact upon
  groundwater, watercourses, drainage lines, wetlands,                                                                      To be complied with at detailed
  and native vegetation.                                                                                                    design / construction stages.
  Dams                                                       S11.1                                                          N/A
  O11 Dam location and construction does not impact          Where the site is in the Rural Zone—
  upon neighbouring properties in terms of—                  a) the land has a slope of less than 25% (1:4);
  a)   hydrology;                                                and
  b)   alteration of existing overland flowpaths and         b) the earthworks including cut and fill batters and
       patterns;                                                 retaining walls are setback a minimum of 50m from
  c)   landslide or failure of dam wall; and                     the property boundary; and
  d)   effluent disposal areas.                              c) the size of the lot is greater than 5
                                                                 hectares;
                                                             S11.2                                                          N/A
                                                             Where the site is in the Rural Settlement Zone or the
                                                             Rural Zone where the lot is less than 5 hectares—
                                                             a) the land has a slope of less than 1:6; and



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 4 of 5
July 2017

Section 22

Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                      COMMENTS
                                                          b)   the earthworks including cut and fill batters and
                                                               retaining walls are setback a minimum of 20m from
                                                               the property boundary; and
                                                          c) involving less than 500m 3 of material;
                                                          S11.3                                                                     ✓
                                                          For all other zones— No solution provided.

                                                                                                                   To be complied with at detailed
                                                                                                                   design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 5 of 5
July 2017

Section 23

Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                          COMMENTS

  14.124 Effects of works
 Erosion and drainage control, sediment capture                 S1.1
 and stormwater runoff                                          Construction works are designed, planned and
                                                                                                                                               ✓
 O1                                                             executed with respect to the principles of erosion
                                                                reduction, drainage management and sediment capture
 Development design, density, layout, and staging provide for   in accordance with Appendix 2, Table A of the                To be complied with at detailed
 erosion control, drainage control and sediment capture and     Queensland State Planning Policy and International           design / construction stages.
 treatment during the construction phase.                       Erosion Control Association Best Practice Erosion and
                                                                Sediment Control (BPESC) 2008;
                                                                S1.2                                                                           ✓
                                                                Construction works are designed and managed to restrict
                                                                the extent of clearing and soil exposure to that necessary
                                                                for access, and safe construction;                           To be complied with at detailed
                                                                                                                             design / construction stages.
                                                                                                                             Refer to civil engineering report, in
                                                                                                                             specific stormwater quality section
                                                                                                                             prepared by this office.
                                                                 S1.3                                                                          ✓
                                                                 Clean stormwater is diverted or managed around or
                                                                 through the site without increasing the concentration of
                                                                 total suspended solids or other contaminants in the flow    To be complied with at detailed
                                                                 and without causing erosion (onsite or offsite);            design / construction stages.
                                                                                                                             Refer to civil engineering report, in
                                                                                                                             specific stormwater quality section
                                                                                                                             prepared by this office.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 3
July 2017

Section 24

Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                              COMMENTS
                                                               S1.4                                                                              ✓
                                                               Cleared areas are effectively stabilised prior to rainfall if
                                                               works are delayed or works are not intended to occur
                                                               immediately;                                                    To be complied with at detailed
                                                                                                                               design / construction stages.
                                                                                                                               Refer to civil engineering report, in
                                                                                                                               specific stormwater quality section
                                                                                                                               prepared by this office.
                                                               S1.6                                                                              ✓
                                                               For buildings,
                                                               a)   upstream runoff must be diverted around the
                                                                    construction site; and                                     To be complied with at detailed
                                                               b)   sediment barriers are provided downslope of                design / construction stages.
                                                                    disturbed areas to prevent sediment washing into
                                                                    gutters, drains and watercourses either on or off the      Refer to civil engineering report, in
                                                                    site; and                                                  specific stormwater quality section
                                                               c)   exposed soil and construction access must be               prepared by this office.
                                                                    managed in accordance with International Erosion
                                                                    Control Association Best Practice Erosion and
                                                                    Sediment Control (BPESC) 2008; and
                                                               d)   temporary or permanent downpipes are connected
                                                                    to the stormwater system before laying the roof; or
                                                               e)   localised erosion is avoided by directing flow from
                                                                    downpipes over non-erosive areas.
 O2                                                           S2.1                                                             N/A
 Works in a watercourse
                                                              Work within waterways must be undertaken in accordance
 Construction activities within watercourses are planned to
                                                              with Best Practice Erosion and Sediment Control, Appendix



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 3
July 2017

Section 25

Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                       COMMENTS
 prevent erosion, construction failure and associated     I – Instream works, Sections 14 and 16 International
 sedimentation.                                           Erosion Control Association 2008
                                                          S2.2                                                                       ✓
                                                          Temporary vehicular crossings of waterways must be
                                                          designed and constructed to convey flows for the 50%AEP   To be complied with at detailed
                                                          event and remain stable for all rainfall events up to     design / construction stages.
                                                          10%AEP event.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 3
July 2017

Section 26

Noosa Shire Council – The Noosa Plan
Existing Services Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                             COMMENTS
  Setbacks and easements                                    S1.1                                                                            ✓
  O1                                                        The footing of any structure or building is located clear of
  Development near a sewer, water main, stormwater          the zone of influence but no closer than 1.5m (measured
  drain, overland flow path or associated structure does    horizontally) from infrastructure including sewers, water      To be complied with at detailed
  not—                                                      mains and stormwater structures;                               design / construction stages.
  a)    adversely affect the function of the service;
  b)    place an additional load on the service; and       S1.2                                                                             ✓
  c)    unduly increase future maintenance costs.          No building or structure overhangs the
                                                           zone of influence;
                                                                                                                           To be complied with at detailed
                                                                                                                           design / construction stages.
                                                           S1.3                                                                             ✓
                                                           Finished surface levels maintain a minimum of
                                                           600mm of cover, but no greater than 3m of cover to
                                                           the underground infrastructure;                                 To be complied with at detailed
                                                                                                                           design / construction stages.
                                                           S1.4                                                                             ✓
                                                           If the existing surface level is altered, surface level
                                                           services including manholes and inspection points are
                                                           altered to match the new surface level;                         To be complied with at detailed
                                                                                                                           design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 3
July 2017

Section 27

Noosa Shire Council – The Noosa Plan
Existing Services Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                           COMMENTS
                                                              S1.5                                                                           ✓
                                                              Alterations are constructed in accordance with Section 4
                                                              of PSP5 –Engineering Design Standards – Roads,
                                                              Drainage and Earthworks and applicable water and              To be complied with at detailed
                                                              sewerage design standards;                                    design / construction stages.



                                                              S1.6                                                                           ✓
                                                              Existing services are relocated and the design and
                                                              construction of the relocated services is in accordance
                                                              with Section 4 of PSP5 –Engineering Design Standards –        To be complied with at detailed
                                                              Roads, Drainage and Earthworks and applicable water           design / construction stages.
                                                              and sewerage design standards.


 O2                                                           S2.1                                                                           ✓
 Maintenance access is provided to all sewers, water mains,
 stormwater drains, overland flow paths and associated        For trunk infrastructure a registered easement in favour of
 structures.                                                  Council is created over all underground infrastructure        To be complied with at detailed
                                                              located in private property;                                  design / construction stages.
                                                              S2.2                                                                           ✓
                                                              The width of the easement is the greater of 3m or the width
                                                              of the zone of influence;                                     To be complied with at detailed
                                                                                                                            design / construction stages.
                                                              S2.3                                                                           ✓




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 3
July 2017

Section 28

Noosa Shire Council – The Noosa Plan
Existing Services Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                  COMMENTS
                                                          The easement is centred over the centreline of the
                                                          infrastructure.                                      To be complied with at detailed
                                                                                                               design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 3
July 2017

Section 29

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                             COMMENTS

  14.144 Strategic Transport Network
  O1                                                            S1.1                                                            N/A
  Traffic generation from the development is considered in a    Where the development leads to the need to increase
  localised and a Shire wide context to ensure that—            transport infrastructure in the Shire, the development
                                                                contributes to the transport network in accordance with the
  a)     the transport network has the capacity to safely       requirements of the applicable infrastructure charging
         and efficiently accommodate projected                  instrument and the Priority Infrastructure Plan in
         movements; and/or                                      accordance with legislation.
  b)     the development includes measures to upgrade
         the transport network to meet the imposed               Editor’s note
         demands.                                               Council may for some development require the preparation
                                                                of a Transport Impact Assessment Report. Planning
                                                                Scheme Policy PSP1 details matters to be addressed in the
                                                                Report.
 O2                                                             S2.1                                                            N/A
 The street network has high street connectivity, both within   Road planning and development design facilitates as many
 the development and to the surrounding local area.                                                                             Refer to traffic engineers report
                                                                pedestrian and cycle movements as possible and provides
                                                                                                                                supporting the development.
                                                                for future connectivity and integration with adjoining sites;
                                                                 S2.2                                                           N/A
                                                                 Arterial and sub-arterial roads are designed so they
                                                                 can operate with acceptable volumes of traffic during          Refer to traffic engineers report
                                                                 peak times;                                                    supporting the development.

                                                                S2.3                                                            N/A
                                                                Collector and local streets are provided to support short
                                                                trips for local traffic moving in and between



 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 1 of 16
July 2017

Section 30

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                           COMMENTS
                                                           neighbourhoods. Local traffic is channelled towards           Refer to traffic engineers report
                                                           collector streets to ensure that traffic volumes on local     supporting the development.
                                                           street are kept low;
                                                            S2.4                                                         N/A
                                                            Collector and local streets are designed to discourage
                                                            through traffic;                                             Refer to traffic engineers report
                                                                                                                         supporting the development.
                                                            S2.5                                                         N/A
                                                            A collector street is provided parallel to arterials
                                                            particularly where they pass through town centres;           Refer to traffic engineers report
                                                                                                                         supporting the development.
                                                           S2.6                                                          N/A
                                                           Appropriate width of road and verge is provided to allow
                                                                                                                         Refer to traffic engineers report
                                                           streets to perform their designated functions in the street
                                                                                                                         supporting the development.
                                                           network;
                                                            S2.7                                                         N/A
                                                            A network of local streets focused towards an activity
                                                            centre or school is provided for safe and efficient          Refer to traffic engineers report
                                                            pedestrian and bike access to the school, safe               supporting the development.
                                                            conditions for school buses, setdown facilities, with on-
                                                            site parking where practical;
                                                            S2.8                                                         N/A
                                                            Passive surveillance is maximised by designing streets
                                                            to enable development to front all streets and roads,        Refer to traffic engineers report
                                                            including arterials;                                         supporting the development.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 2 of 16
July 2017

Section 31

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                           COMMENTS

                                                           S2.9                                                          N/A
                                                           Streets near Public Passenger Transport facilities are
                                                                                                                         Refer to traffic engineers report
                                                           orientated to optimise the walkable catchments within 800
                                                                                                                         supporting the development.
                                                           metres walking distance;
                                                           S2.10                                                         N/A
                                                           The street network has no more than 15 percent of lots
                                                                                                                         Refer to traffic engineers report
                                                           fronting cul-de-sacs. The maximum cul-de-sac length is 120
                                                                                                                         supporting the development.
                                                           metres;
                                                            S2.11                                                        N/A
                                                            Street stubs to adjacent future development areas are
                                                            provided at spacings of 200 m or closer to enable future     Refer to traffic engineers report
                                                            street connections to be made;                               supporting the development.

                                                           S2.12                                                         N/A
                                                           Street block lengths are not more than 240 m long, and
                                                                                                                         Refer to traffic engineers report
                                                           predominantly around 150-180 m long. Street block lengths
                                                                                                                         supporting the development.
                                                           are generally shorter closer to town and neighbourhood
                                                           centres;
                                                           S2.13                                                                           ✓
                                                           Direct, safe and attractive pedestrian and cycle routes are
                                                           provided within and through the development and connect       To be complied with at detailed
                                                           to bus stops.                                                 design / construction stages.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 3 of 16
July 2017

Section 32

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                        ACCEPTABLE OUTCOMES                                           COMMENTS
  O3                                                         S3.1                                                          N/A
  Development is designed –                                  Higher density development is concentrated along public
  a)   To encourage travel by community transport,           transport Routes;                                             Refer to traffic engineers report
       walking and cycling rather than by private car; and                                                                 supporting the development.
  b)   To maximise accessibility via existing and planned
       community transport facilities                        S3.2                                                          N/A
                                                             There is provision for bus routes through development
                                                             sites;                                                        Refer to traffic engineers report
                                                                                                                           supporting the development.
                                                             S3.3                                                          N/A
                                                             Bus routes are located to maximise patronage
                                                             catchment and to consider personal safety, lighting and       Refer to traffic engineers report
                                                             traffic management;                                           supporting the development.
                                                             S3.4                                                          N/A
                                                             At least 90 percent of all residents are located within 400
                                                             metres of an existing or planned bus route;                   Refer to traffic engineers report
                                                                                                                           supporting the development.
                                                             S3.5                                                          N/A
                                                             Pedestrian and cycle movement is provided within
                                                             local streets to and through development;                     Refer to traffic engineers report
                                                                                                                           supporting the development.
                                                             S3.6                                                          N/A
                                                             Attractive and safe pedestrian and cycle connections are
                                                             provided with shade trees, graded walking and cycle paths     Refer to traffic engineers report
                                                             and lighting;                                                 supporting the development.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 4 of 16
July 2017

Section 33

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                       COMMENTS
                                                           S3.7                                                      N/A
                                                           Buildings and pedestrian entrances are oriented to
                                                           the street;                                               Refer to traffic engineers report
                                                                                                                     supporting the development.
                                                           S3.8                                                      N/A
                                                           Pathways have ramps at all kerb corners for wheelchair
                                                           and pram access;                                          Refer to architectural plans
                                                                                                                     prepared by Nettleton Tribe for
                                                                                                                     further details.
                                                           S3.9                                                      N/A
                                                           Every development has convenient and prominent
                                                           pedestrian entrances that cater for all pedestrians       Refer to architectural plans
                                                           including older people, children and the mobility and     prepared by Nettleton Tribe for
                                                           vision impaired;                                          further details.
                                                           S3.10                                                     N/A
                                                           Expanses of ground level blank walls along street
                                                           frontages, and large driveways and entrances to           Refer to architectural plans
                                                           carparks are avoided;                                     prepared by Nettleton Tribe for
                                                                                                                     further details.
                                                           S3.11                                                     N/A
                                                           Bus routes are not be located away from activity
                                                           centres; and                                              Refer to traffic engineers report
                                                                                                                     supporting the development.
                                                           S3.12                                                     N/A
                                                           Facilities for boarding and exiting community transport




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 5 of 16
July 2017

Section 34

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                      ACCEPTABLE OUTCOMES                                          COMMENTS
                                                           facilities are incorporated into developments;               Refer to traffic engineers report
                                                                                                                        supporting the development.
                                                            S3.13                                                       N/A
                                                            Pedestrian and cycle routes within or adjacent to the
                                                            development are overlooked by adjoining buildings, make     Refer to traffic engineers report
                                                            use of views and attractive sights, have lighting and are   supporting the development.
                                                            signposted;
                                                           S3.14                                                                          ✓
                                                           Suitable car restraint measures are adopted within the
                                                           development such as lower speed limits or traffic
                                                           calming measures to support greater pedestrian and           To be complied with at detailed
                                                           cycle movement;                                              design / construction stages.


                                                            S3.15                                                       N/A
                                                            Traffic management devices on potential bus routes are
                                                            provided in accordance with the accepted development        Refer to traffic engineers report
                                                            subject to requirements code for undertaking road works     supporting the development.
                                                            on local government roads, under the Transport Planning
                                                            and Coordination Regulation 2005;
                                                            S3.16                                                       N/A
                                                            Streets identified as potential bus routes are—             Refer to traffic engineers report
                                                            a)    collector streets and sub-arterial/arterial roads
                                                                                                                        supporting the development.
                                                                  which provide highly accessible and relatively
                                                                  direct routes wherever practical;
                                                            b)    those that provide for the shortest and most
                                                                  direct route for an efficient public transport
                                                                  service; and



 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 6 of 16
July 2017

Section 35

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                           COMMENTS
                                                                 c)   those that can efficiently service adjoining
                                                                      development areas.
  O4                                                             No solution provided.
  Development access does not compromise the functions
  of particular roads as indicated in the road hierarchy, and
  does not adversely impact on the safety, capacity and
  operations of the road system.

  14.145 Pedestrian and Cycle Path Infrastructure
 O5                                                             S5.1
 Pedestrian and cycle path infrastructure is provided –         Consideration is given to existing and future pathway
  a)     to form an integrated component of the movement        linkages and pathways link to the Local and Regional Cycle
         network and the open space system;                     Network and to the Priority Infrastructure Plan in Part 15.
  b)     to encourage walking and cycling;                       S5.2
  c)     to add variety and visual interest;                     Direct and accessible linkages are provided into
  d)     to conserve street trees, vegetation and other          the site.
         significant features;
  e)     to allow equitable access to public areas and
         community facilities;
  f)     with adequate lighting where subject to high night      S5.3
         time usage;                                             Pathway and landscape works are provided to a high
  g)     in locations where there is casual                      standard to Council specifications and assessed for
         surveillance;                                           compliance with local government cycling facility design
                                                                 standards.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 7 of 16
July 2017

Section 36

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                           COMMENTS
  h)     or widened at potential conflict points;                S5.4                                                          N/A
  i)     to incorporate—
          i)     street tree planting to enhance the             Pathways are provided to cater for shared use and cater for   Refer to architectural plans
                 streetscape;                                    both commuting and recreational usage and exceed              prepared by Nettleton Tribe for
          ii)    directional signage that is visible under all   minimum standards.                                            further details.
                 conditions.
  O6                                                              S6.1
  Pedestrian and cycle path infrastructure is designed and        Pedestrian and cycle path infrastructure is designed and
  constructed to –                                                constructed –
  a)    provide a stable, smooth surface, including across        a)    in accordance with AUSTROADS;
        driveways, sections and joins;                            b)    to comply with local government design
  b)    be easily maintained;                                           standards;
  c)    a width and longitudinal gradient to cater for            c)    to have navigational signs in accordance with
        projected usage, including nearby—                              Council ‘Wayfinding’ signage specifications; and
         i)    high activity nodes;                               d)    to incorporate –
         ii)   public transport;                                       i) kerb ramps at all intersections and
         iii)  centres;                                                     designated crossings;
  d)    provide clear sight-lines for safe use; and                    ii) refuge islands on all roads with median strips;
  e)    be free of any obstructions such as fences, signage                 and
        and bollards.                                                  iii) holding rails for cyclists at the intersection
                                                                            of trunk collector, sub- arterial and arterial
                                                                            roads that are positioned in accordance
                                                                            with –
                                                                            A. Australian Standard 1742.9: 2000 - Manual
                                                                                of Uniform Traffic Control Devices - Bicycle
                                                                                Facilities; and
                                                                            B. AUSTROADS Part 14 - Bicycles - Section
                                                                                9; and
                                                                            C. AUSTROADS Part 13 – Pedestrians.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 8 of 16
July 2017

Section 37

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                       COMMENTS
                                                                    Editor’s note:
                                                                   All pathways are considered shared use pathways,
                                                                   which Cyclists can legally use, unless bicycles are
                                                                   specifically prohibited through signs or markings (such
                                                                   as in town centres).
  14.146 Road and Drainage and Construction
 O7                                                                S7.1
                                                                   Road planning and design supports the hierarchy and
  Roads and pedestrian and cycle paths are planned and             functional aspects identified in Sections 2 and 3 of
  designed to support the hierarchy and functional aspects         PSP5 Engineering Design Standards – Roads,
  identified in Sections 2 and 3 of PSP5 Engineering               Drainage and Earthworks;
  Design Standards – Roads, Drainage and Earthworks and             S7.2
  to ensure that—                                                   Road and pathway planning and design is in accordance
  a)     design and alignment of the roads, intersections           with, in order of precedence—
         and all associated works—                                  a)     Noosa Integrated Local Transport Plan;
         i. provides a safe environment for all users;              b)     Queensland Transport’s Shaping Up;
         ii. is adequate for the design speed                       c)     Queensland Design Code for Residential Streets;
              environment;                                          d)     AUSTROADS Guide to Traffic
         iii. is adequate for predicted traffic volumes;                   Engineering Practice;
              and                                                   e)     Sections 2 and 3 of PSP5 Engineering Design
         iv. maintains the safe and efficient functioning of the           Standards – Roads, Drainage and Earthworks; or
              road network without the use of traffic signals;      f)     the Noosa Cycling and Walking Network
         v. is compatible with existing roads;                             Development Plan;
         vi. is easily maintained by Council                        OR
              equipment; and                                        g)     A combination of the principles in these
         vii. where appropriate, has the ability to                        documents.




 Solution:     ✓     =   Acceptable Solution
               A/S   =   Alternative Solution
               N/A   =   Not applicable to this proposal


Page 9 of 16
July 2017

Section 38

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                       COMMENTS
              accommodate public transport services;                S7.3
  b)     road pavement surfaces—                                    On-road cycling treatment is utilised to provide safe
         i. are durable enough to carry estimated wheel             and continuous movement of cyclists along a
              loads of travelling and parked vehicles;              roadway, such as--
         ii. provide for the safe passage of vehicles,              a)   sealed shoulders;
              pedestrians, cyclists, and discharge of               b)   wide kerbside lane;
              stormwater run-off from contributing                  c)   exclusive or peak period bicycle lane;
              catchments and the preservation of all weather        d)   advisory treatments such as Bicycle
              access;                                                    Awareness Zone;
  c)     kerb and channel—                                          e)   shared parking / bicycle lane;
         i. controls vehicle movement by delineating                f)   contra flow bicycle lane; and
              the carriageway for all users;                        g)   bus/bicycle lane.
         ii. conveys road pavement run-off to stormwater
              drainage in a manner that allows the road to be      S7.4
              trafficable in Q100 ARI local rainfall events; and   The provision of bicycle lanes at intersections is
  d)     verges and footpaths provide—                             generally in accordance with AUSTROADS Part 14,
         i. safe access for pedestrians and cyclists               section 5 and the Manual of Urban Traffic Control
              clear of obstructions;                               Devices (MUTCD) Part 9.
         ii. an access area for vehicles onto
              properties;
         iii. a corridor allocated for services and utilities;
              and
         iv. additional amenity for minor roads.
  O8                                                                S8.1                                                     Development will comply.
  Stormwater drainage infrastructure is planned,                     Stormwater drainage planning, design and construction
  designed and constructed to—                                      is in accordance with Section 4 of PSP5 Engineering      Refer to civil engineering report
  a)   be accessible, cost effective and easily                     Design Standards – Roads, Drainage and Earthworks;       prepared by this office.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 10 of 16
July 2017

Section 39

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                    ACCEPTABLE OUTCOMES                                        COMMENTS
         maintainable;                                   S8.2                                                       Development will comply.
  b)     protect downstream capacity;                    As Constructed data is submitted in accordance with
  c)     protect downstream water quality;               Section 6 of PSP5 Engineering Design Standards –
  d)     maximise on-site stormwater retention and       Roads, Drainage and Earthworks;
         retardation; and                                S8.3                                                                         ✓
  e)     convey run-off to stormwater drainage in a
                                                         Stormwater drainage planning, design and construction is
         manner that allows roads to be trafficable in
         Q100 ARI local rainfall events.                 in accordance with the Queensland Urban Drainage Design    To be complied with at detailed
                                                         Manual.                                                    design / construction stages.
                                                                                                                    Refer to civil engineering report
                                                                                                                    prepared by this office.
  O9                                                      S9.1                                                                        ✓
  Roads and stormwater drainage infrastructure is         Roads and stormwater drainage infrastructure is
  constructed—                                            constructed in accordance with—
  a)    in accordance with appropriate                    a)    Sections 2, 3 and 4 of PSP5 Engineering Design      To be complied with at detailed
        engineering standards; and                              Standards – Roads, Drainage and Earthworks;         design / construction stages.
  b)    to minimise adverse environmental                 b)    Queensland Design Code for Residential Streets;
        impacts, including from run-off and               c)    AUSTROADS; or                                       Refer to civil engineering report
        erosion.                                          d)    A combination of the principles in these            prepared by this office.
                                                                documents;
                                                         S9.2                                                                         ✓
                                                         Erosion and sediment control measures are designed
                                                         and implemented in accordance with the Institution of
                                                         Engineers Australia (Queensland Division) Soil Erosion     To be complied with at detailed
                                                         and Sediment Control - Guidelines for Queensland           design / construction stages.
                                                         Construction Sites.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 11 of 16
July 2017

Section 40

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                        COMMENTS
                                                                                                                            Refer to civil engineering report
                                                                                                                            prepared by this office.

  Environmental Protection                                        S10.1
  O10                                                             Roads and stormwater drainage follow the edge of
 Roads and stormwater drainage infrastructure are located         existing disturbed areas, or alternatively, these works
 and aligned so as to—                                            are co-located within a combined utility corridor;
  a) minimise disturbance to native vegetation                    S10.2
       and/or other habitat areas;                                Roads avoid native vegetation and provide for fauna
  b) protect and maintain wildlife corridor movements and         underpasses and associated fencing where
       the safety of native fauna;                                appropriate;
  c) minimise changes to the hydrological regime,                S10.3
       including drainage patterns, run-off and water quality;
                                                                 Road infrastructure within or adjacent to native habitat
  d) avoid crossing watercourses, drainage lines and
       wetlands, but where such crossings are unavoidable,       incorporates fences which allow for protected wildlife
       disturbed areas are reinstated and revegetated on         movement and controls unrestricted access of domestic
       completion of works; and                                  cats and dogs;
 minimise bulk earthworks.                                        S10.4
                                                                  Native vegetation is protected from clearing or
                                                                  construction activities by—
                                                                  a) clearly marking vegetation to be retained with
                                                                       flagging tap;
                                                                  b) installing protective fencing around the
                                                                       dripline of vegetation; and
                                                                  c) ensuring stock piling, storage and vehicle parking
                                                                       occur outside the areas of vegetation to be
                                                                       retained;




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 12 of 16
July 2017

Section 41

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                          COMMENTS

                                                                 S10.5
                                                                 Low impact construction techniques are used around areas
                                                                 of vegetation to be retained to minimise interference with
                                                                 the vegetation.
  O11                                                             No solution provided
  Roads and stormwater drainage infrastructure is proven
  to be suitable for its use prior to Council accepting the
  dedicated asset.
  O12                                                             S12.1                                                                        ✓
  Alignment of stormwater drainage infrastructure is to           The location, design and construction of stormwater
  allow for easy access for the ongoing maintenance by            drainage structures is in accordance with Sections 4 and
  Council.                                                        5 of PSP5, Engineering Design Standards - Roads,            To be complied with at detailed
                                                                  Drainage and Earthworks;                                    design / construction stages.


                                                                  S12.2                                                                        ✓
                                                                  Where infrastructure is located on private land an
                                                                  easement is dedicated over the infrastructure in
                                                                  accordance with Section 4 of PSP 5, Engineering Design      To be complied with at detailed
                                                                  Standards – Roads, Drainage and Earthworks.                 design / construction stages.


  14.147 Frontage works
 O13                                                              S13.1                                                                        ✓
 Development is provided with external roadworks along the        The following infrastructure components already exist at
 full extent of the frontage of the site to an appropriate        the frontage of the site or are provided at the
 standard having regard to the specified function of the road.    developer’s expense—




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 13 of 16
July 2017

Section 42

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                           COMMENTS
                                                               a)   full width sealed road;                                  To be complied with at detailed
                                                               b)   concrete kerb and channel where                          design / construction stages.
                                                                    appropriate;
                                                               c)   forming and grading to footpaths;
                                                               d)   vehicular kerb and footpath crossings;
                                                               e)   a constructed bikeway;
                                                               f)   a constructed footpath;
                                                               g)   a constructed carriageway;
                                                               h)   required alterations to public utility mains, services
                                                                    or installations;
                                                               i)   construction of any required alterations to public
                                                                    utility mains, services or installations;
                                                               j)   stormwater drainage works; and
                                                               k)   installation of electrical conduits;
                                                               S13.2                                                                          ✓
                                                               Road and drainage design and construction is in
                                                               accordance with Sections 3 and 4 of PSP5 Engineering
                                                               Design Standards – Roads, Drainage and Earthworks.            To be complied with at detailed
                                                                                                                             design / construction stages.


  14.148 Road and rail corridors
  O14                                                          S14.1                                                         N/A
   Noise sensitive uses including residential uses are not     Noise sensitive uses including residential uses are
  subjected to high traffic noise levels from the major road   separated by a minimum of—
  network or rail corridors.                                   a) 40m from the property boundary of roads within
                                                                    the major road network; and
                                                               b) 80m from the property boundary of rail
                                                                    corridors;



 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 14 of 16
July 2017

Section 43

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                        COMMENTS
                                                               S14.2                                                     N/A
                                                               Development in the vicinity of road corridors meets
                                                               the following external design criteria for roads in the
                                                               major road network—
                                                               a)    54dB(A)L10 (18hours) based on predicted traffic
                                                                     volumes ten years hence;
                                                               S14.3                                                     N/A
                                                               Development in the vicinity of rail corridors meets the
                                                               following external design level noise criteria—
                                                               a)      65dB(a), assessed as the 24hour average
                                                                       equivalent continuous A- weighted sound
                                                                       pressure level; and
                                                               b)      87dB(A), assessed as a single event
                                                                       maximum sound pressure level.
  14.149 Staged development
  O15 Staged development is planned, designed and             No solution provided.                                      N/A
  constructed to ensure that—
  a)    each stage of the development can be
        constructed without interruption to services and
        utilities provided to the previous stages;
  b)    the infrastructure provided is capable of servicing
        the entire development; and
  c)    the materials used are consistent throughout the
        development.
  14.150 Alterations to services and utilities




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 15 of 16
July 2017

Section 44

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                              COMMENTS
  O16                                                           S16.1                                                            Development will comply.
  Any alterations or repairs to infrastructure as a result of   Any alterations or repair to infrastructure as a result of the
  the development are made at no cost to Council.               development are completed at the developer’s expense.




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 16 of 16
July 2017

Section 45

 PERFORMANCE OUTCOMES                                     ACCEPTABLE OUTCOMES                                         COMMENTS
  Maintenance of environmental values and water            S1.1
  quality objectives                                       Development meets the applicable performance
                                                                                                                                       ✓
 O1                                                        outcomes of the State Planning Policy Appendix 2 SPP
 Downstream ecosystems, properties and infrastructure      Code: Water Quality;
 are not adversely impacted by either changes to flow,                                                                To be complied with at detailed
 water quality or ecosystem health caused by                                                                          design / construction stages.
 development.
                                                                                                                      Refer to civil engineering report,
                                                                                                                      in specific stormwater quality
                                                                                                                      section prepared by this office.
                                                          S1.2                                                             Development will Comply.
                                                          Design and construction methods for stormwater quality
                                                          treatment assets are in accordance with Healthy
                                                          Waterways Water By Design Guidelines;                       To be complied with at detailed
                                                                                                                      design / construction stages.
                                                                                                                      Refer to civil engineering report,
                                                                                                                      in specific stormwater quality
                                                                                                                      section prepared by this office.
                                                          S1.3                                                             Development will Comply.
                                                          Commitments are made to implement a cost effective
                                                          maintenance strategy for the life cycle of any engineered
                                                          water quality treatment device;                             To be complied with at detailed
                                                                                                                      design / construction stages.

                                                                                                                      Refer to civil engineering report,
                                                                                                                      in specific stormwater quality
                                                                                                                      section prepared by this office.
                                                          S1.4                                                        N/A – site less than 2,500m2
                                                          Water quality nutrient load modelling is undertaken in      hence no treatment train
                                                          accordance with Water by Design Music Modelling             modelling required in accordance
                                                          Guidelines to demonstrate compliance with the SPP



 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 1 of 5
July 2017

Section 46

 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                              COMMENTS
                                                              nutrient reduction requirements;                                 with SPP 2017.

                                                              S1.5                                                                              ✓
                                                              Stormwater outlets that directly discharge to naturally acidic
                                                              environments are managed to prevent eutrophication;
                                                                                                                               To be complied with at detailed
                                                                                                                               design / construction stages.

                                                                                                                               Refer to civil engineering report,
                                                                                                                               in specific stormwater quality
                                                                                                                               section prepared by this office.
                                                                                                                               Stormwater outlets directly into
                                                                                                                               existing Council infrastructure.
                                                              S1.6                                                                              ✓
                                                              Suitable methods are incorporated to prevent the spread of
                                                              invasive environmental weed species at stormwater outlets.
                                                                                                                               To be complied with at detailed
                                                                                                                               design / construction stages.

                                                                                                                               Refer to civil engineering report,
                                                                                                                               in specific stormwater quality
                                                                                                                               section prepared by this office.
  Water demand                                                 S2.1                                                                             ✓
  O2                                                           Captured water is plumbed to be available for all
  Urban development reduces the need for mains water by        external uses including gardening, irrigation, ponds
  capturing and utilising run-off from appropriate areas on    and outdoor cleaning.                                           To be complied with at detailed
  site.                                                                                                                        design / construction stages.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 5
July 2017

Section 47

 PERFORMANCE OUTCOMES                                          ACCEPTABLE OUTCOMES                                        COMMENTS
  O3                                                            S3.1                                                      Refer to landscape architects plans
  Urban development reduces the need for mains water by         Planting is in accordance with PSP 3 Landscaping
  eliminating requirement for irrigation via the use the        Plans and Guidelines.                                     for further details.
  endemic plant landscaping design.

  O4                                                            S4.1                                                                       ✓
  Backflow devices or similar systems are installed, where      A suitable backflow prevention device is installed to
  necessary, to ensure water reuse facilities have no           protect the drinking water within the reticulated water
  impact on the quality of the town mains water.                supply in accordance with AS/NZS 3500:2003 Plumbing        To be complied with at detailed
                                                                and Drainage.                                              design / construction stages.

                                                                                                                           Refer to hydraulic engineers plans
                                                                                                                           during detailed design phase.

  Shire Business Centre                                        No probable solution
  O5
  Within the Shire Business Centre site, as shown on Map
  SBC run-off treatment is contained within the
  developable areas of the site and drainage lines are only
  used for final polishing of run-off;
  O6                                                           No probable solution
  Within the Shire Business Centre site, as shown on Map
  SBC, on-site detention measures are contained within the
  developable areas of the site, clear of drainage lines and
  Open Space Precincts.
 Use of natural treatments and systems                         S7.1
 O7                                                            No probable solution
 Natural treatment strategies, including grass swales and
 bio-retention systems, vegetated filtration strips and
 gross pollutant traps, are used wherever possible.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 3 of 5
July 2017

Section 48

 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                      COMMENTS
 O8                                                           S8.1                                                                      ✓
 Development design including density and scale provides      Integration of stormwater quality treatment is in
 adequate footprint to integrate all elements of stormwater   accordance Healthy Waterways Water Sensitive Urban
 quality and quantity treatment infrastructure including,     Design Guidelines for South East Queensland and the      To be complied with at detailed
 where relevant, bio retention basin batters and              Water by Design Bio retention Technical Design           design / construction stages.
 maintenance access, without the need for retaining walls.    Guideline.
                                                                                                                       Refer to civil engineering report,
                                                                                                                       in specific stormwater quality
                                                                                                                       section prepared by this office.

 O9                                                           S9.1                                                                      ✓
 Stormwater conveyance channels use natural channel           Landscape and ecological features (e.g. plant species
 design principles to convey external catchment stormwater    and habitat types) used in stormwater conveyance
 through the development site and support landscape,          channels are complementary to the local context,         To be complied with at detailed
 passive recreation and ecological values.                    including natural waterways;                             design / construction stages.

                                                                                                                       Refer to landscape architects
                                                                                                                       plans for further details.

                                                              S9.2                                                                      ✓
                                                              Planting densities result in a stable channel over the
                                                              long term and minimize potential for invasive weed
                                                              growth.                                                  To be complied with at detailed
                                                                                                                       design / construction stages.

                                                                                                                       Refer to landscape architects
                                                                                                                       plans for further details.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 4 of 5
July 2017

Section 49

 PERFORMANCE OUTCOMES                                           ACCEPTABLE OUTCOMES                                       COMMENTS
 O10                                                            S10.1                                                                      ✓
 Development design and operation facilitates nil increase in   Methods to prevent gross pollutants entering stormwater
 gross pollutants entering stormwater systems.                  systems and waterways are adopted that—
                                                                 a)   are low maintenance;                                To be complied with at detailed
                                                                 b)   prevent nutrient leaching in the event scheduled    design / construction stages.
                                                                      maintenance is delayed; and
                                                                 c)   facilitate human behaviour change (e.g.             Refer to civil engineering report,
                                                                      signage, bins).                                     in specific stormwater quality
                                                                                                                          section prepared by this office.




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 5 of 5
July 2017

Section 50

State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality

Performance
                              Acceptable Outcomes (AO)                                       Response
Outcomes (PO)

Plan to avoid/minimise new impacts

PO1                           AO1.1

The development is            A site stormwater quality management plan (SQMP) is            Complies. Refer to ADG
planned and designed          prepared, and:                                                 Engineers Civil Engineering
considering the land          a.   is consistent with any local area stormwater              Report for further details.
use constraints of the              management planning, and
site for achieving            b.   provides for achievable stormwater quality treatment
stormwater design                   measures meeting design objectives listed below in
                                    Table A (construction phase) and Table B (post
objectives.
                                    construction phase), or current best practice
                                    environmental management, reflecting land use
                                    constraints, such as:
                                    •    erosive, dispersive and/or saline soil types
                                    •    landscape features (including landform)
                                    •    acid sulfate soil and management of nutrients of
                                         concern
                                    •    rainfall erosivity.

PO2                           AO2.1

Development does not          A wastewater management plan (WWMP) is prepared by a           Not applicable.
discharge wastewater          suitably qualified person and addresses:                       Development does not
to a waterway or off site                                                                    include on-site waste
                              a.   wastewater type, and
unless demonstrated                                                                          water treatment. Existing
to be best practice           b.   climatic conditions, and                                  Council sewer
environmental                 c.   water quality objectives (WQOs), and                      infrastructure to service
management                    d.   best-practice environmental management, and               the proposed
for that site.                                                                               development.

                              AO2.2                                                          A02.2 – N/A

                              The WWMP provides that wastewater is managed in
                              accordance with a waste management hierarchy that:
                              a.   avoids wastewater discharges to waterways, or
                              b.   if wastewater discharge to waterways cannot
                                    practicably be avoided, minimises wastewater
                                    discharge to waterways by re-use, recycling, recovery
                                    and treatment for disposal to sewer, surface water and
                                    groundwater.

PO3                           AO3.1
                                                                                             Not applicable. No
Any non-tidal artificial      If the proposed development involves a non-tidal artificial
                                                                                             artificial waterways
waterway is located in a      waterway:
                              a.      environmental values in downstream waterways           proposed for future
way that is compatible
                                     are protected, and                                      development.
with the land use
constraints of the site for   b.      any groundwater recharge areas are not affected,
protecting water                     and
environmental values in       c.     the location of the waterway incorporates low lying
                                     areas of a catchment connected to an existing
existing natural
                                     waterway, and
waterways.
                              d.     existing areas of ponded water are included, and



Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 1

Section 51

State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality

                           AO3.2
                                                                                      A03.2 – N/A
                           Non-tidal artificial waterways are located:
                           a.    outside natural wetlands and any associated
                                 buffer areas, and
                           b.    to minimise disturbing soils or sediments, and
                           c.    to avoid altering the natural hydrologic regime in
                                 acid sulfate soil and nutrient hazardous areas.


PO4                        AO4.1

Any non-tidal artificial   Where a non-tidal artificial waterway is located
                                                                                      Not applicable. No non-
waterway is located in     adjacent to, or is connected to, a tidal waterway by
                                                                                      tidal artificial waterways
a way that is              means of a weir, lock, pumping system or similar:
                                                                                      proposed for future
compatible with
                                                                                      development.
existing tidal              a.   there is sufficient flushing or a tidal range of
waterways.                       >0.3 m, or
                            b.   any tidal flow alteration does not adversely
                                 impact on the tidal waterway, or
                            c.    there is no introduction of salt water into
                                 freshwater environments.




Design to avoid/minimise new impacts

PO5                        AO5.1
Any non-tidal artificial   Any non-tidal artificial waterway is designed and          Not applicable. No non-
waterway is not            managed for any of the following end-use purposes:         tidal artificial waterways
designed only for                                                                     proposed for future
                           a.    amenity including aesthetics, landscaping and
stormwater flow                                                                       development.
                                 recreation, or
management or
stormwater quality         b.    flood management, or
management.
                           c.    stormwater harvesting as part of an integrated
                                 water cycle management plan, or
                           d.    aquatic habitat, and
                           AO5.2                                                      A05.2 – N/A
                           The end-use purpose of any non-tidal artificial
                           waterway is designed and operated in a way that
                           protects water environmental values.




Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 2

Section 52

State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality

Construct to avoid/minimise new impacts

PO6                        AO6.1
Construction activities    An erosion and sediment control plan (ESCP)                An erosion and sediment
for the development        demonstrates that release of sediment-laden                control plan (ESCP) will
avoid or minimise          stormwater is avoided for the nominated design             be prepared as part of a
adverse impacts on         storm, and minimised when the nominated design             future operational works
stormwater quality.        storm is exceeded, by addressing design objectives         application.
                           listed below in Table A (construction phase) or local
                           equivalent, for:
                           a.    drainage control, and
                           b.    erosion control, and
                           c.    sediment control, and
                           d.    water quality outcomes, and
                           AO6.2                                                      A06.2 – N/A
                           Erosion and sediment control practices (including any
                           proprietary erosion and sediment control products)
                           are designed, installed, constructed, operated,
                           monitored and maintained, and any other erosion
                           and sediment control practices are carried out in
                           accordance with local conditions and appropriate
                           recommendations from a suitably qualified person, or
                           AO6.3                                                      A06.3 – N/A
                           The ESCP demonstrates how stormwater quality will
                           be managed in accordance with an acceptable
                           regional or local guideline so that target contaminants
                           are treated to a design objective at least equivalent to
                           Acceptable Outcome AO6.1.

PO7                        AO7.1
Operational activities     Development incorporates stormwater flow control           Further details of
for the development        measures to achieve the design objectives set out          construction controls will
avoid or minimises         below in Table A (construction phase) and Table B          be provided as part of
changes to waterway        (post construction phase). Both the construction and       future operational works
hydrology from             operational phases for the development comply with         applications. Please
adverse impacts of         design objectives in Table A (construction phase),         refer to the ADG
altered stormwater         and Table B (post construction phase), or current          Engineers Civil
quality and flow.          best practice environmental management, including          Engineering Report for
                           management of frequent flows, peak flows, and              operational compliance.
                           construction phase hydrological impacts.


PO8                        AO8.1
Any treatment and          See AO2.1                                                  Not applicable.
disposal of waste                                                                     Development does not
water to a waterway                                                                   include on-site waste
accounts for:                                                                         water treatment. Existing
                                                                                      Council sewer
• the applicable water
                                                                                      infrastructure to service
  quality objectives for                                                              the proposed
  the receiving waters,                                                               development.
  and
• adverse impact on
  ecosystem health or
  receiving waters,

Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 3

Section 53

State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality

 and
• in waters mapped as
  being of high
  ecological value, the
  adverse impacts of
  such releases and
  their offset.
PO9                         AO9.1
Wastewater discharge        Wastewater discharge to non-tidal artificial                        Not applicable.
to a non-tidal artificial   waterways is managed to avoid or minimise the                       Development does not
waterway is managed         release of nutrients of concern so as to minimise the               include on-site waste
in a way that               occurrence, frequency and intensity of coastal algal                water treatment or non-
maintains ecological        blooms, and                                                         tidal artificial waterway.
processes, riparian
                            AO9.2
vegetation, waterway                                                                            A09.2 – N/A
integrity, and              Development in coastal catchments avoids or
downstream                  minimises and appropriately manages soil
ecosystem health.           disturbance or altering natural hydrology, and

                            Editor’s note: Compliance with this outcome may be
                            demonstrated by following the management advice in the
                            guideline: Implementing Policies and Plans for Managing
                            Nutrients of Concern for Coastal Algal Blooms in Queensland
                            by the Department of Environment and Heritage Protection.
                            AO9.3
                                                                                                A09.3 – N/A
                            Development in coastal catchments:
                            a. avoids lowering groundwater levels where potential or
                                actual acid sulfate soils are present, and
                            b.   manages wastewaters so that:
                                 (i) the pH of any wastewater discharged is maintained
                                      between 6.5 and 8.5 to avoid mobilisation of acid,
                                      iron, aluminium, and metals, and
                                 (ii) holding times of neutralised wastewaters ensures
                                       the flocculation and removal of any dissolved iron
                                       prior to release, and
                                 (iii) visible iron floc is not present in any discharge, and
                                 (iv) precipitated iron floc is contained and disposed of,
                                      and
                                 (v) wastewater and precipitates that cannot be
                                     contained and treated for discharge on site are
                                     removed and disposed of through trade waste or
                                     another lawful method.




Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 4

Section 54

State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality

                           AO10.1
                                                                                       Not applicable.
                           Any non-tidal artificial waterway is designed,              Development does not
                           constructed and managed under the responsibility of         include non-tidal artificial
                           a suitably qualified registered professional engineer,      waterway.
                           Queensland (RPEQ) with specific experience in
                           establishing and managing artificial waterways, and
                                                                                       A010.2 – N/A
                           AO10.2
                           Monitoring and maintenance programs adaptively
                           manage water quality in any non-tidal artificial
                           waterway to achieve relevant water-quality objectives
                           downstream of the waterway, and
                           AO10.3                                                      A010.3 – N/A
                           Aquatic weeds are managed in any non-tidal artificial
                           waterway to achieve a low percentage of coverage of
                           the water surface area (less than 10%). Pests and
                           vectors (such as mosquitoes) are managed through
                           avoiding stagnant water areas, providing for native
                           fish predators, and any other best practices for
                           monitoring and treating pests, and
                           AO10.4                                                      A010.4 – N/A
                           Any non-tidal artificial waterway is managed and
                           operated by a responsible entity under agreement for
                           the life of the waterway. The responsible entity is to
                           implement a deed of agreement for the management
                           and operation of the waterway that:
                           a.    identifies the waterway, and
                           b.    states a period of responsibility for the entity,
                                 and
                           c.    states a process for any transfer of responsibility
                                 for the waterway, and
                           d.    states required actions under the agreement for
                                 monitoring the water quality of the waterway
                                 and receiving waters, and
                           e.    states required actions under the agreement for
                                 maintaining the waterway to achieve the
                                 outcomes of this code and any relevant
                                 conditions of a development approval, and
                           f.    identifies funding sources for the above,
                                 including bonds, headworks charges or levies.




Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 5

Section 55

                                                  Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                               Ref: 20769 C R001 Rev 05 15.12.17
                                                                                                 December 2017




                                                                  Appendix E
                                              NSC Erosion Hazard Assessment




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Section 56

        SCHEDULE 2—EROSION AND SEDIMENT CONTROL




                                                                                                                   Proposed Amendments August 2015
                     ASSESSMENT




                                                                                                  The Noosa Plan
1.            Preamble

Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses.

Effective on-site erosion and sediment control provides the following benefits—


      A better looking, more marketable site;
      Improved wet weather working conditions;
      Reduced stockpile losses;
      Less mud and dust problems;
      Reduced clean-up costs;
      Fewer public complaints;
      Better public image;
      Cleaner watercourses; and
      Better fishing and swimming in our nearby watercourses.

2.            Erosion Hazard Assessment Form
Controlling Factors                                                   Points   Score   Checking
Predominant slope1 of the whole site, prior to
building works:
 0 - 3% slope                                                           0
 >3% - 5% slope                                                         1
 >5% - 10% slope                                                        2        1
 >10% - 15% slope                                                       4
 > 15% slope                                                            5
Soil type: (see 1 below)
 Sandy soil/gravel                                                      0
 Sandy loam                                                             1        2
1
    The term ‘predominant slope’ is defined in Part 2 Section 2.12.



                                                              S2.1

Section 57

                                                   Controlling Factors                                                 Points         Score         Checking
                                                    Clay loam                                                             2
                 Proposed Amendments August 2015
The Noosa Plan



                                                    Clay soil                                                             2
                                                   Anticipated duration of site disturbance: (see 2 below)
                                                    Duration < 2 weeks                                                      0
                                                    2 weeks  Duration < 3 months                                           2             2
                                                    3 months  Duration < 6 months                                          4
                                                    Duration > 6 months                                                     5
                                                   Month that works are undertaken: (see 3 below)
                                                    August, September                                                       0
                                                    April, May, June, July, November, October                               1             3
                                                    March December                                                          2
                                                    January February                                                        3
                                                   Offsite sediment control (i.e. down slope of the soil
                                                   disturbance):
                                                    Score 1 point if there is no purpose built, operational                 1
                                                       and well maintained sediment traps (eg. sediment                                     0
                                                       basin, gross pollutant trap or purpose built wetland)
                                                       to catch sediment before it enters a water body with
                                                       environmental values (eg. creek, natural wetland,
                                                       river or bay) (see 4 below)
                                                   Run-off entering the site:
                                                    Score 1 point if stormwater run off entering the site is                1              0
                                                       not diverted away from the soil disturbance
                                                   Extent of site disturbance:
                                                    Score 2 points if building work requires reshaping of
                                                       the ground surface (eg. ‘cut and fill’ works) (see 5                  2
                                                       below)                                                                               5
                                                     Score 5 points if the area to be disturbed is greater                  5
                                                      than 600m²
                                                   Works within environmentally sensitive areas:
                                                    Score 11 points if the disturbance is within the banks
                                                      of a watercourse (see 6 below)                                        11
                                                    Score 5 points if the disturbance is within 50m of the                                 0
                                                      top of bank of a watercourse                                           5
                                                    Score 2 points if the disturbance is between 50m
                                                      and 100m of the top of bank of a watercourse                           2

                                                   TOTAL SCORE (See 7 & 8 below)                                                           13           LOW
                                                   Notes:
                                                       1. Where there is more than one type of soil on the site, select the category with the highest point value.
                                                       2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
                                                          be fully stabilised (eg. grassing).
                                                       3. If this time span covers more than one category, select the category with the highest point value.
                                                          Note that if there is no grass/vegetation cover on the site before building work has started, the time
                                                          span starts from the time this form is completed.
                                                       4. If you are not sure, score 1 point.
                                                       5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
                                                          wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
                                                          already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.
                                                       6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
                                                          intermittently.
                                                       7. For a high risk site, the total score is  14 points.
                                                       8. For a low risk site, the total score is < 14 points.




                                                                                                            S2.2

Section 58

                                                                                                                  Proposed Amendments August 2015
3.        Erosion and Sediment Control Methods




                                                                                                 The Noosa Plan
                    Element                                    Solution

Minimise disturbance when excavating      Retain as much grassed area as possible on the
                                          site.
                                          These areas not only improve the appearance
                                          of the site they also filter much of the sediment
                                          from stormwater run-off before it reaches the
                                          drainage system.
Catch drains and perimeter banks          Allow for diversion of up slope stormwater
                                          around the work site and other disturbed
                                          surfaces.
Install a sediment barrier                Install sediment barriers down slope of the
                                          building site to filter coarse sediment before it
                                          can wash into gutters, drains and watercourses.
                                           Purpose designed geotextile sediment
                                               fabric (i.e. not shadecloth) attached to posts
                                               with the geotextile buried in an upstream
                                               trench; or
                                           Place turf of a minimum 600mm width along
                                               kerb line; or
                                           Straw bales, staked in a 100mm (min) deep
                                               trench.
Single gravelled entry-exit               Restrict vehicle access to one entry-exit point.
                                           Gravelling the access point will allow all
                                               weather access, will reduce the amount of
                                               soil carried off the site by vehicles, and will
                                               provide a permanent base for the driveway.
Early stormwater drainage connection      Connect a temporary or permanent downpipe/s
                                          to the stormwater system before laying the roof
                                          or slow and spread the flow from downpipe/s to
                                          avoid localised erosion. Downpipe/s may be
                                          temporarily removed during wall construction.
                                          All stormwater must discharge in a manner that
                                          does not cause soil erosion.
Concrete waste and washing                Waste concrete and household paint must not
                                          be allowed to wash into the gutters or the street.
Sand and soil stockpiles                  Stockpiles must be placed wholly on the
                                          construction site and behind a sediment barrier.




                                       S2.3

Section 59

                                                  Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                               Ref: 20769 C R001 Rev 05 15.12.17
                                                                                                 December 2017




                                                                       Appendix F
                                                      Rational Method Calculations




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Section 60

                                                             CIVIL DESIGN SPREADSHEETS
 Project                                                                                                                                                                        Job #                          Rev
Noosaville Servo                                                                                                                                                                   20769                              0
                                                                                                                                                                                Made by / date
                                                                                                                                                                                BP                   Nov-17
 Subject                                                                                                                                                                        Checked / date
Pre-Development Catchment Runoff                                                                                                                                                MVI                  Nov-17


                                                                 RATIONAL METHOD CALCULATIONS (PRE-DEVELOPMENT)

                                                                                                  Sheet                             Sheet     Channel Time of          Q1         Q100        Q1      Q10      Q100
                                    Impervious    Pervious                                                             Mannings
 PRE-DEV          AREA        Fi                               C10     C1     C100       CA100     Flow      Slope                   Flow       Flow   Conc.         Rainfall    Rainfall    Peak     Peak     Peak
                                       Area        Area                                                                  "n"
 CATCH-                                                                                           Length                             Time       Time    "tc"        Intensity   Intensity    Flow     Flow     Flow
 MENT ID           (ha)                (ha)          (ha)                                           (m)       (%)                   (mins)     (mins)  (mins)       (mm/hr)      (mm/hr)    (m3/s)   (m3/s)   (m3/s)

EX1                  0.197   0.95     0.187         0.010       0.89 0.71        1       0.197          40      4.80       0.035          5            0    5.0      129.4        320.6     0.050    0.109    0.176
             0       0.000   0.00     0.000         0.000       0.00 0           0       0.000           0      0.00           0          0            0    0.0       0.0          0.0      0.000    0.000    0.000
             0       0.000   0.00     0.000         0.000       0.00 0           0       0.000           0      0.00           0          0            0    0.0       0.0          0.0      0.000    0.000    0.000
             0       0.000   0.00     0.000         0.000       0.00 0           0       0.000           0      0.00           0          0            0    0.0       0.0          0.0      0.000    0.000    0.000



                 Notes:      1) Rational method calculations are in accordance with QUDM (2013) Volume 1 Chapter 4.0 where Q = CIA/360
                             2) Fraction Impervious and Mannings 'n' value estimated from site aerial imagery and topographical information
                             3) Intesity Frequency Duration Rainfall Data extracted from online Bureau of Meteorology 'Rainfall IFD Data System'
                             4) Time of concentration is sum of overland sheet flow time (Friend's eq.) plus channel time (Argue method)
                             5) C10 value for Fi values less than 0.10 assumes "medium" soil permeability and "poor" grass coverage



 Project                                                                                                                                                                        Job #                          Rev
Noosaville Servo                                                                                                                                                                   20769                              0
                                                                                                                                                                                Made by / date
                                                                                                                                                                                BP                   Nov-17
 Subject                                                                                                                                                                        Checked / date
Post-Development Catchment Runoff                                                                                                                                               MVI                  Nov-17


                                                                RATIONAL METHOD CALCULATIONS (POST-DEVELOPMENT)

                                                                                                  Sheet                             Sheet     Channel Time of          Q1         Q100        Q1      Q10      Q100
                                    Impervious    Pervious                                                             Mannings
POST-DEV          AREA        Fi                               C10     C1     C100       CA100     Flow      Slope                   Flow       Flow   Conc.         Rainfall    Rainfall    Peak     Peak     Peak
                                       Area        Area                                                                  "n"
 CATCH-                                                                                           Length                             Time       Time    "tc"        Intensity   Intensity    Flow     Flow     Flow
 MENT ID           (ha)                (ha)          (ha)                                           (m)       (%)                   (mins)     (mins)  (mins)       (mm/hr)      (mm/hr)    (m3/s)   (m3/s)   (m3/s)

C1                   0.197   0.85     0.168         0.030       0.87   0.7       1       0.197           0      0.00            0         0            0    5.0      129.4        320.6     0.049    0.106    0.176
             0       0.000   0.00     0.000         0.000       0.00    0        0       0.000           0      0.00            0         0            0    0.0       0.0          0.0      0.000    0.000    0.000
             0       0.000   0.00     0.000         0.000       0.00    0        0       0.000           0      0.00            0         0            0    0.0       0.0          0.0      0.000    0.000    0.000
             0       0.000   0.00     0.000         0.000       0.00    0        0       0.000           0      0.00            0         0            0    0.0       0.0          0.0      0.000    0.000    0.000
             0       0.000   0.00     0.000         0.000       0.00    0        0       0.000           0      0.00            0         0            0    0.0       0.0          0.0      0.000    0.000    0.000

                 Notes:      1) Rational method calculations are in accordance with QUDM (2013) Volume 1 Chapter 4.0 where Q = CIA/360
                             2) Fraction Impervious and Mannings 'n' value estimated from site aerial imagery and topographical information
                             3) Intesity Frequency Duration Rainfall Data extracted from online Bureau of Meteorology 'Rainfall IFD Data System'
                             4) Time of concentration is sum of overland sheet flow time (Friend's eq.) plus channel time (Argue method)
                             5) C10 value for Fi values less than 0.10 assumes "medium" soil permeability and "poor" grass coverage



 Project                                                                                                                                                                        Job #                          Rev
Noosaville Servo                                                                                                                                                                   20769                              0
                                                                                                                                                                                Made by / date
                                                                                                                                                                                BP                   Nov-17
 Subject                                                                                                                                                                        Checked / date
Comparison of Pre vs Post Development Flows                                                                                                                                     MVI                  Nov-17


                                                            RATIONAL METHOD SUMMARY (PRE vs POST-DEVELOPMENT FLOWS)

                                                                                                  Sheet                             Sheet     Channel Time of          Q1         Q100        Q1      Q10      Q100
                                    Impervious    Pervious                                                             Mannings
POST-DEV          AREA        Fi                               C10     C1     C100       CA100     Flow      Slope                   Flow       Flow   Conc.         Rainfall    Rainfall    Peak     Peak     Peak
                                       Area        Area                                                                  "n"
 CATCH-                                                                                           Length                             Time       Time    "tc"        Intensity   Intensity    Flow     Flow     Flow
 MENT ID           (ha)                (ha)          (ha)                                           (m)       (%)                   (mins)     (mins)  (mins)       (mm/hr)      (mm/hr)    (m3/s)   (m3/s)   (m3/s)

TOTAL EX             0.197 0.95       0.187         0.010       0.89 0.71        1       0.197        300       0.47            0         0            1    5.0      129.4        320.6     0.050    0.109    0.176
TOTAL PR             0.197 0.85       0.168         0.030       0.87 0.7         1       0.197        300       0.47            0         0            1    5.0      129.4        320.6     0.049    0.106    0.176




 Project                                                                                                                                                                        Job #                          Rev
Noosaville Servo                                                                                                                                                                   20769                              0
                                                                                                                                                                                Made by / date
                                                                                                                                                                                BP                   Nov-17
  Subject                                                                                                                                                                       Checked / date
Initial Detention Volume Calculation - QUDM Method                                                                                                                              MVI                  Nov-17



                                                                        DETENTION SIZING (RATIONAL BASED METHODS)

                                                                                 Post-              Desired
            Volumetric Coefficients of                                                                                  Inflow Reducti             Detention Volume Calculation
Storm Event                                        Rainfall Intensities       Development         Outflow (Pre-                                                                             Maximum of Methods
                     Runoff                                                                                            Volume on                      Methods QUDM 5.05.1
                                                                              Peak Inflow         Development)                 Ratio
      ARI        Exist Cv      Post-Dev Cv         Exist I     Post-Dev I               Qi               Qo               Vi          r        CULP        BOYD     CARROL       BASHA                MAX
      (yr)                                        (mm/hr)       (mm/hr)              (m3/s)            (m3/s)            (m3)                  (m3)         (m3)      (m3)        (m3)                (m3)
        1          0.712            0.696          129.4         129.4                0.049             0.050             20        -0.023      -0.1         -0.5      -0.2       -0.3                -0.1
        2          0.757            0.740          164.1         164.1                0.066             0.068             27        -0.023      -0.2         -0.6      -0.2       -0.4                -0.2
        5          0.846            0.827          201.6         201.6                0.091             0.093             37        -0.023      -0.3         -0.8      -0.3       -0.6                -0.3
       10          0.890            0.870          223.0         223.0                0.106             0.109             43        -0.023      -0.3         -1.0      -0.4       -0.6                -0.3
       20          0.935            0.914          252.6         252.6                0.126             0.129             51        -0.023      -0.4         -1.2      -0.4       -0.8                -0.4
       50          1.000            1.000          291.3         291.3                0.160             0.160             64           0         0.0         0.0       0.0         0.0                 0.0
      100          1.000            1.000          320.6         320.6                0.176             0.176             70           0         0.0         0.0       0.0         0.0                 0.0

Section 61

                                                  Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                               Ref: 20769 C R001 Rev 05 15.12.17
                                                                                                 December 2017




                                                                               Appendix G
                                                                         SQID Maintenance




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Section 62

SPEL Separator Commisioning Operation and Maintenance




             Puraceptor Class 1
             Operation and Maintenance Manual




              13 SPEL or 13 77 35
                   AUSTRALIA WIDE

Section 63

                                        Introduction
         Congratulations on your purchase of a SPEL Environmental Stormwater Quality Improvements Device.
           With proper care and by following a few simple guide lines your system will give you many years
                                                of dependable service.


                                            Important
Only qualified personnel should maintain, operate and repair you Stormwater system. Any wiring of equipment should be
                                          performed by a qualified electrician.


                                              Warning
Operation may cause injury. Take all necessary precautions, wear protective equipment, refer to Engineers Department.
                  For your own safety, read all instruction manuals prior to working on equipment.


                             Safety Precautions
                                • Follow all “occupation, health and safety” regulations.
         • Ensure maintenance personnel are aware of “Confined Spaces” guidelines, which must be followed.
              • Make sure that there is sufficient oxygen and that there are no poisonous gases present.
                       • Check the explosion risk before wielding or using electric hand tools.
                             • Do not ignore health hazards. Observe strict cleanliness.
                        • Ensure that the lifting equipment (where required) is in good condition.
       • All personnel who are to work with these systems should be vaccinated against diseases that can occur.
                                              • Keep a first aid kit handy.


                                   Health & Safety
       Maintenace should be carried out by a competent contractor in accordance with the above procedures.
                          Health and Safety at Work legislation and good building practice.
A warning notice should be visible at the top of each access shaft - ‘danger, harmful fumes’ and ‘ respirators should be
    worn in this tank.’ Before entering persons must be qualified in accordance with ‘confined space’ requirements




Information contained in this data sheet is approximate and for general guidance only. In accordance with the companies
  policy of constant improvement and development SPEL Products reserves the right to change the specification without
                                                      prior notice.

Section 64

                 Puraceptor Class 1
                 Operation and
                 Maintenance Manual
                               Service Stations

                               Fuel Depots

                               Windfarms

                               Switchyards

                               Sub Stations

                               Power Stations

                               Industrial Locations




Contents
    SPEL Puraceptor - How it works                page 2
    SPEL Puraceptor Maintenance                   page 3
    SPEL Coalescer Units                          page 4
    SPEL Auto Closure Device                      page 5
    SPEL Oil Alert System                         page 6
    Spare Parts List                              page 8




                13 SPEL or 13 77 35
                   AUSTRALIA WIDE

Section 65

                                                Oil containment

                                         “How it works”
                      2,6



                                4
                                                                              1
                                         5A                                                           5B

                                                                                           3




SPEL PURACEPTORTM is a FULL RETENTION                               2 FULL RETENTION
separator that treats all flows and is sized to                       All liquid is treated. There is no by-pass operation.
contain more than the anticipated maximum                           3 COALESCER EQUIPPED
oil spillage enabling it to be fully operational                      Provides a coalescing process for the separation of
at all times.                                                         smaller globular of light liquid pollutants to reduce the light
                                                                      liquid content in the outlet to
It has two chambers, a coalescer and is fitted with an                5mg/litre or less.
automatic closure device specifically designed to treat and
contain major oil spills thereby making it suitable for high risk   4 INLET DIP PIPE - FLAME TRAP
applications.                                                         For minimum turbulence and to prevent fire and
                                                                      inflammable vapours passing through to the drainage
It achieves a water discharge quality of 5mg light liquids per
                                                                      system.
litre complying to European Standard BS EN 858.1. 2006.
Treatable flow rates range from 2LPS to 200LPS. Pipe sizes          5 TWO CHAMBER
range from 100mm to 450mm (larger sizes on request).                  A non-turbulant flow through two horizontal treatment
                                                                      chambers, utilising the underflow principle to retain light
Careful and proper planning by corporate Australia and
                                                                      liquids in all flow conditions.
government bodies is essential when designing and
implementing systems that are effective in protecting our              A. CONTAINMENT CHAMBER: Where Total Suspended
environment.The proven and independently accredited SPEL               Solids (TSS ) silt, sediments, sludge and gross pollutants
PURACEPTORTM (complies to European Standard BS EN                      are trapped and settle on the chamber floor and where
858.1 2006) is an Australian made stormwater treatment                 light liquids are contained.
and oil containment device that can contain and prevent light
liquid pollutants from discharging into our waterways.                 B. COALESCER CHAMBER: Where light liquids
                                                                       separation is enhanced reducing it to 5mg/litre or less
1 AUTOMATIC CLOSURE DEVICE                                             prior to discharge.
  The AUTOMATIC CLOSURE DEVICE (A.C.D.) is a
  precisely engineered device comprising a water-bouyant            6 GRAVITY OPERATED
  ball that is sensitive to any change in the water density           Will function in the event of power failure and fits into
  as a consequence of light liquids build up, thereby                 existing pipe drainage systems or new sites.
  automatically activating a process of depressing the
  A.C.D. to SHUT OFF the separator, preventing pollutants           7 MAINTENANCE
  from discharging to drains                                          Easy and safe with no entering of the tank required.
  and waterways.




                                                                                                                                        2

Section 66

                                                   SPEL PURACEPTORTM

            PuraceptorsTM should be inspected at three - six - or twelve monthly intervals depending on site conditions, to determine the depth of
            retained pollutants and silt in both chambers and the correct operating of the ACD (automatic closure device). When the depth of the
            oil/fuel retained has reached the predetermined design level, (approx. 50mm) or after a spill it should be cleaned out.

     1      CONTAINMENT CHAMBER: Where silt, sediments, sludge, gross pollutants settle out and light liquids are retained. The auto closure
            device operates in its retaining tube next to the oil alert sensor probe.

     2      COALESCER CHAMBER: Where light liquids separation is enhanced prior to discharge and where the coalescer unit is incorporated,
            the coalescer should be removed and cleaned in accordance with the requirements set out in the coalescer data sheet.




      F                 B                                  C                                                              D                      A                           E




                                                                                                                                           2

                                                                                        1




MAINTENANCE PROCEDURE
 A Coalescer unit C Sucking out oil/fuel and silt                                                                  E Re-insert coalescer unit and ACD
  Use the lifting handle or the        Suck off the retained oil from both chambers of the PuraceptorTM and then   Re-insert the foam insert into the stainless steel coalescer
  chain and lift the coalescer         the silt deposited on the bottom, leaving sufficient water to ensure the    unit and re-insert the coalescer unit into the PuraceptorTM
  unit out of the tank and place       (auto closure device) ACD remains floating.                                 as provided with the SPEL lifting/location/locking system.
  it near the PuraceptorTM. In a
  retained area so pollutants do
                                       D Sucking out complete contents (if necessary)                              Partially fill the PuraceptorTM with clean water (if necessary)
                                       If the quantity of pollutants exceeds recommended level, the                to ensure the ACD when re-inserted remains floating.
  not escape.
                                       complete contents of the PuraceptorTM may need to be removed.               Re-insert the ACD.
  B Cleaning foam insert               After sucking out completely, remove the ACD. Using a pole with
                                                                                                                   Finally check the ACD is floating after it
  Remove foam insert and wash          a hook, lift out the ACD using the lifting eye on the float, if fitted.
                                                                                                                   has been replaced to safeguard against its removal by
  with normal water pressure                                                                                       unauthorised persons, unless depth of tank precludes doing
  ensuring the dirty water runs                                                                                    so from ground level.
  into the PuraceptorTM.
                                                                                                                   F SPEL automatic alarm/monitoring system
                                                                                                                   The SPEL automatic alarm/monitoring system probe should
Important note:                                                                                                    be lifted out of the probe protection tube, wiped clean and
When cleaning out, ensure both chambers are sucked out equally starting with the first chamber and                 re-inserted. the system should now be reset according to
then the second chamber and back again. Ensuring even water pressure against baffle wall.                          instructions.




                                                                                                                                                                                     3

Section 67

                                            SPEL COALESCER UNITS
The SPEL PuraceptorTM Class 1 separator and the SPEL StormceptorTM Class 1 by-pass separators incorporate
coalescer units. The coalescer units provide a coalescence process for the separation of small globules of light
liquid pollutants before final discharge to the surface water drain.
Coalescers are found in the second chamber of the SPEL PuraceptorTM and the second chamber of the SPEL
StormceptorTM Class 1
Prior to installation
1. Remove any strapping / ropes which have been used to hold the coalescer units from shifting in transit.
2 The access shaft(s) above the coalescer units should be covered to prevent ingress of
  concrete, dust, debris etc., which could clog the foam inserts.
3. On completion of installation, check that the coalescer unit is inserted securely into the base socket.        Retaining
On heavily polluted sites silt and contaminants may build up in the coalescer unit foam inserts                   clip
and add significantly to it’s weight. Use lifting chain sets that are on hooks at ground level
for safe lifting with a tripod or hoist.                                                                       Extension shaft

Installation
During installation, it is important that the foam inserts are not clogged with dust, debris or
drops of wet concrete. To safeguard against this, we recommend covering the access shaft
with a sheet of polythene, if not already covered.
                                                                                                      Static water level
Commissioning
On completion of installation, check the foam insert is fitted inside the stainless steel coalescer
unit and the coalescer unit is inserted securely into the base socket.                                               Lifting handle

Maintenance
1. Lift handle and coalescer unit out of the tank and place in a retained area so pollutants do not escape.          Coalescer unit

2. Remove foam insert and wash with normal water pressure ensuring the dirty water runs into the
   PuraceptorTM / StormceptorTM.
3. Make sure the hole in the centre of the coalescer foam is facing towards the manhole
   when installed in the tank.
4. Re-insert the foam insert into the stainless steel coalescer unit and re-insert the coalescer into the                  Figure 1. Coalescer unit with lifting chains
   PuraceptorTM / StormceptorTM. After the tank has been cleaned.

SPEL COALESCER UNITS GUIDE RAIL SYSTEM/LIFTING,                                                                 Handle with locating/
LOCATING AND LOCKING SYSTEM                                                                                     locking bracket to guide
                                                                                                                rail system
SPEL coalescer unit guide rail system
This facilitates easy insertion and removal of coalescer units. The system is robust, manufactured       Handle extension
                                                                                                         (optional extra with
throughout in stainless steel and is action positive, leaving no doubt the coalescer
                                                                                                         extension shafts)
unit is located properly.
Brackets fixed to the top and bottom of the coalescer unit simply engage the stainless steel
guide rail fixed to the top of the stub access shaft. The coalescer is then lowered in the normal way,
being guided at the correct angle into the conical base unit which finally locates the coalescer unit          Coalescer guide
into it’s final position.                                                                                      rail system
Extension guide rails can be incorporated into the SPEL extension shafts to suit
(preferably when ordered with the separator).
However, when the separator is full of water, debris or sludge accumulated over a period
could prevent the coalescer unit from re-seating correctly after servicing.
The coalescer unit lifting / locating / locking system ensures the coalescer unit is seated
correctly and can be locked into position to prevent tampering.                                                                                          Lifting hook
The stainless steel lifting handle can be extended to suit deep tank inverts and provide easy
access for lifting manually or with a tripod and hoist utilising the lifting hook.




                                                                                                                      Figure 2. SPEL coalescer unit guide rail
                                                                                                                      system/lifting, locating and locking system
                                                                                                                                                                        4

Section 68

                                           SPEL AUTO CLOSURE DEVICE (ACD)

• SPEL ACDThe Automatic Closure Device (ACD) is found in the first chamber of a PuraceptorTM. The purpose of
the ACD is to close the separator off automatically when the maximum storage capacity of light liquid is attained.
The ACD is to ensure that in the event of a major spillage, pollutants do not pass into the drainage system; it
should not be regarded as a substitute for an automatic alarm / monitoring system.

Prior to installation
Prior to installation the ACD retaining tube should be covered to prevent ingress of concrete etc., which could fall onto the ACD and
upset it’s calibration.
Operation and Maintenance
If the tank should fill with light liquid, the ACD which is calibrated for a specific gravity of 0.85, will automatically sink and
close off the SPEL PuraceptorTM.
Normally routine maintenance would include removing light liquid intercepted within the PuraceptorTM. If a SPEL automatic alarm / monitoring
system is incorporated, it will automatically indicate when the PuraceptorTM should be emptied. Only in an emergency will the PuraceptorTM fill to
it’s maximum and operate the ACD.
In such an event the PuraceptorTM should be completely sucked out and the ACD lifted out. Check that the ACD is in good working condition – ie.
Lifting hook secure and sealed; float not leaking; knuckle joint free and clean; sealing ring intact and complete. Clean with warm soapy water
before re-inserting.
To re-insert the ACD, partially fill the PuraceptorTM with clean water (if necessary) to ensure the ACD when re-inserted remains floating.
Re-insert the ACD.


Finally check the ACD is floating after it has been replaced.

                                                                                        Automatic closure device SPEL PuraceptorTM Class 1
                                                                                                    separators (two chamber)
SPEL PuraceptorTM Class 1 separators – Two Chamber Models
Commissioning
After the tank has been installed, leave the water in.
1. Remove the ACD from the packing box, taking care not                                                                      S/S lifting hook, if fitted
   to cause damage.
                                                                               Water level
2. Insert the ACD into the retaining tube using the lifting eye, if fitted,                                         Initial operating position
   ensuring it floats correctly with the float (top section approx. 50mm)                                           of the automatic closure
   just visible above the water level.                                                                              device (no oil present)




                                                                                                                              Automatic closure
                                                                                                                              device tube



                                                                                                                              Automatic closure device
                                                                                                                              (closed position)




                                                                                                                                                           5

Section 69

                                        SPEL Automatic Alarm/Monitoring System

The SPEL automatic alarm/monitoring system provides a audible warning alarm when the level of the oil in the SPEL separator reaches
approximately 10% of the storage volume under static liquid level conditions. This is a early warning system that is used for spills
or lack of maintenance.
The system comprises of a probe mounted in the main separation chamber which senses when the designed volume of light liquids has
accumulated and sends a signal to the electronic control unit activating a red ‘empty now’ warning light and an audible alarm,


                                                                Safe area      Operation
                            Hazardous area                       Control       The probe is freely suspended in the probe protection tube in
   SPEL seperator                                                 Unit         the separator at the correct level. When the oil-layer or depth
                                                                               of hydrocarbons reaches the predetermined level, the top of
                                                                               the probe will be immersed in the oil, breaking the circuit and
                                                                               activating the alarm. It is a ‘fail-safe’ system providing
                                                                               complete assurance that it is operative. If a fault occurs it will be
                                                                               signalled immediately.

                                                                               Installation
                                                                               Control unit (general positioning)
                                                                               The control unit has been designed to be located indoors and
                                                                               outdoors, within a nonhazardous area. It should be wall mounted
                                                                               and positioned such that the LED display and push switches
                                                                               on the front panel can be readily seen and accessed. The unit
                                                                               can be secured to the wall by using the four mounting holes
                                                                               provided. Included within the control is an intrinsically safe
                                                                               circuit (approved according to ATEX Directive 94/9/EC), to
                                                                               which the probe unit is connected.

                                                                                Cable to control unit   Probe junction box
                                                                                                                     Access shaft
                                                 Maintenance
          When the separator is maintained, lift the probe out of the probe
   protection tube, check it operates the alarm (see under Tests Ref. 10.2)                                         Cable coiled for
                                                                                  Location cap                      adjustment and
        and at the same time wipe oil and contaminants from the probe to                                            testing
                                    prevent a fake alarm after re-inserting.

                                                                                                                    Probe protection tube




                                                                                          Probe




                                                                               Insert probe onsite
                                                                               The probe protection tube is factory fitted and the probe
                                                                               matched to ensure the alarm is activated when the light liquids
                                                                               reach approximately 10% of the storage volume the SPEL
                                                                               separator is designed for.
                                                                               All that is required on site is to undertake the electrical
                                                                               installation in accordance with the instructions provided and
                                                                               lower the probe with the pre-fixed location cap into the probe
                                                                               protection tube. When the cap locates onto the top of the probe
                                                                               protection tube, the probe is suspended at the correct level.




                                                                                                                                                       6

Section 70

                                        SPEL Automatic Alarm/Monitoring System

Control unit (electrical connections)                    Probe
1. Mains voltage connection;                             The probe is installed freely suspended in the SPEL separator within the probe
The control unit should be connected to a suitable       protection tube. The 3-core cable is connected into the junction box mounted in
220/240V AC supply and fused at 3 amps.                  the access shaft above the probe protection tube. Extra cable is provided to enable
                                                         raising the junction box where extension shafts are incorporated.
Note: This appliance must be earthed.
                                                         Important note: In all cases good, standard electrical practice should be followed
2. Control unit/probe junction box connection            and the installation must conform to the Australian Wiring Rules – AS 3000 – 2007.
Wiring from the control unit to the probe junction box   In essence, the installation must be such that the intrinsic safety is
in the separator chamber requires a 3-core screened.     no compromised by:
0.75mm core section cable.
                                                           • Exposure to risk of mechanical damage
Maximum cable length: 300 metres.
                                                           • Unauthorised modification of interference
3. Probe connection
                                                           • Exposure to moisture, dust and foreign bodies
A 5 metre 3-core probe cable is normally fitted to the
junction box and the probe.                                • Excessive heat

After all connections have been made, the cables must      • Invasion of intrinsically safe circuit by other electrical equipment or circuitry
be secured by tightening each entry gland.
                                                         Certificate of conformity
                                                         The alarm device has been approved to be used in explosion-hazardous areas. The
                                                         control unit and probe are approved according to ATEX Directive 94/9/EC. These
                                                         approvals mean that the probes can be installed in Zone 0, which is continuously
                                                         explosion-hazardous.
                                                         The SPEL oilset control unit must be located in the safe area, but it can be
                                                         connected to the probe without any barrier.

                                                         Tests (10.2)
                                                         The function can be tested by lifting the probe within the probe protection tube. In
                                                         approximately 5 seconds, the alarm is given by a red light and audible signal. Both
                                                         relays release. Push the RESET button - the buzzer goes off and relay pulls in.
                                                         When the probe is placed in water again, relay pulls in and the red light goes off.

                                                         Cable break and short circuit test
                                                         Also the function can be tested in case of cable fault or short circuit. First cause
                                                         short circuit in probe cable terminals 1 and 2. Then the yellow light of short circuit
                                                         is lit. Both the relays pick up and the buzzer goes on. Remove the short circuit and
                                                         reset the buzzer.

                                                         Simulated Function Test
                                                         The function of probe, cable and electronics can be tested. Push the TEST button for
                                                         2 to 5 seconds. Both relays pick up, and the red light is lit. When the TEST button is
                                                         released, the red light goes off and relay returns to its normal position. The buzzer
                                                         and relay must be reset.

                                                         Installation
                                                         Important note: It is important that installation is carried out by a competent
                                                         technician familiar with this type of equipment or contact our Special Products
                                                         Division for installation, commissioning and maintenance service.




                                                                                                                                                  7

Section 71

                SPARE PARTS LIST

DATE:

INVOICE NO:

TYPE:

MODEL:

SERIAL NO:

JOB NO:




 LINE           DESCRIPTION             QTY          PART No.

  1

  2

  3

  4

  5

  6

  7

  8




  For all spare parts enquiries, please ring 13 SPEL or 13 77 35


                                                                   8

Section 72

                        MAINTENANCE SERVICE LEDGER

               MODEL No


          INSTALLATION ADDRESS


      INITIAL OPERATING DATE

           WORKING CAPACITY

 PRIMARY CHAMBER SPILL CAPACITY

  OIL ALERT PROBE trigger threshold

      MINUMUM MAINTENANCE                       ANNUALLY from the initial operational date or if
          FREQUENCIES                               indicated by the oil alert probe alarm
  Note: Oil Alert Probe alarm is triggered when fuel/oil hydrocarbons reaches 10% of primary chamber
                                                capacity.

                              MAINTENANCE RECORD
                             PRIMARY            SECONDARY
                                                                    OIL ALERT
                             CHAMBER             CHAMBER
                                                                     PROBE
SERVICE     COALESCER        SEDIMENT            SEDIMENT                          SERVICE MANAGER
                                                                   CLEANED &
 DATE        FLUSHED        REMOVED &           REMOVED &                          NAME & SIGNATURE
                                                                     ALARM
                          HYDROCARBONS        HYDROCARBONS
                                                                    CHECKED
                             SKIMMED             SKIMMED

Section 73

                         MAINTENANCE RECORD
                         PRIMARY       SECONDARY
                                                     OIL ALERT
                         CHAMBER        CHAMBER
                                                      PROBE       SERVICE STATION
SERVICE   COALESCER      SEDIMENT       SEDIMENT
                                                    CLEANED &    MANAGER NAME &
 DATE      FLUSHED      REMOVED &      REMOVED &
                                                      ALARM         SIGNATURE
                      HYDROCARBONS   HYDROCARBONS
                                                     CHECKED
                         SKIMMED        SKIMMED

Section 74

SPEL Ecoceptor
      In-Line Gross Pollutant Trap (GPT)




               www.spel.com.au


[OCR of page images]
 

 

 

 

 

 

SPEL Ecoceptor

In-Line Gross Pollutant Trap (GPT)

www.spel.com.au

INTEGRATED WATER SOLUTIONS

 

Section 75

    Introduction
    The SPEL Ecoceptor is a hydrodynamic in-line Gross            The cylindrical shape of the SPEL Ecoceptor with its
    Pollutant Trap (GPT) that has a unique treatment action       sloped cone-configured base ensures sediment accretes
    producing low velocity conditions producing discharge         at the centre of the Ecoceptor's base facilitating easy and
    water quality outcomes complying to statutory guidelines      simple cleaning.
    across Australia.
                                                                  The poly/fibreglass construction ensures that oil and
    It separates and captures sediments, silt, total suspended    grease are removed without sticking to the sides of the
    solids, and oil and grease. Oil & grease rise to the          internal walls.
    "oil-capture" zone of the treatment chamber and are
    contained in all flow events.                                 Flow rates on standard units of up to 1400 LPS and
                                                                  can fit pipe sizes from 225mm to 1200mm (other sizes
    Areas with a high fraction of impervious surfaces,including   available on request.)
    car parks, ports, streeetscapes, roads, subdivisions and
    industrial estates that require stormwater treatment are
    ideal for the SPEL Ecoceptor. MUSIC node is available
    on request.
    The one-piece, self-contained fibreglass construction ,
    is lightweight and yet robust in strength making it simple
    and cost-effective when performing installations.
    The SPEL Ecoceptor is delivered to site fully assembled
    saving on installation time and crane costs. The SPEL
    Ecoceptor fibreglass GPT can be installed in all types of
    trafficable zones, including vehicular truck (Class D).




2

Section 76

Maintenance
INSPECTION AND CLEANING                                         IMPORTANT
The regularity of inspections of the SPEL Ecoceptor             SPEL Environmental takes safety seriously and
is contingent on the features and properties of the             recommends that prior to the entry of any of its devices,
catchment area.                                                 that maintenance personnel undertake relevant safety
                                                                checks and use appropriate safety equipment. SPEL
SPEL recommends inspection of the Ecoceptor one                 devices are considered confined spaces and should
month after installation to determine the volume of             only be entered by appropriately trained and certified
trapped silt and pollutants.                                    personnel with the necessary safety equipment.
Information sourced can be useful in factoring the
frequency of on-going inspections or cleaning operations.
In the event of excessive rain or an oil spill, an inspection
is recommended immediately.
Ascertain silt depth and if build-up is evident, then a
vacuum-loader truck should be engaged for the cleaning
of the tank.
SPEL Ecoceptor cleaning procedure is simple, by simply
lifting the external lid (two persons may be required),
resting it securely in a safe manner and then inserting
suction hose into the chamber.
Ensure that the chamber is thoroughly cleaned of all
refuse and debris before accessing the chamber - if
required.
The chamber is cleaned by inserting the suction hose
through the manhole at ground level.
Always commence cleaning from the inlet side of the
chamber and ensure on completion of the cleaning
operation that the lid is secured to its normal position
(and locked if necessary) before departing the site.




                                                                                                                            3

Section 77

                          ECOCEPTOR
                                          1000 SERIES

    SELECTION CHART
    Weight approximately 300kg each


     Model                    E/102222               E/103030
                                                                                         1000
                                                                                         E/103737                            E/104545


     Inlet (mm)                  225                      300                                 375                                450


     Outlet (mm)                 225                      300                                 375                                450

     Invert* Level
                                 900                      900                                 900                                900
     (mm)

     Overall* Height
                                2200                     2200                                2200                               2200
     (mm)

     Diameter (mm)              1900                     1900                                1900                               1900

     Manhole Opening
                              900 x 600              900 x 600                           900 x 600                           900 x 600
     (mm)

     Manhole Quantity             1                         1                                  1                                   1

     Max Silt Capacity
                                1200                     1200                                1200                               1200
     (Litre)

     Max Hydrocarbon
                                1200                     1200                                1200                               1200
     Capacity (Litre)

     Max Capacity
                                3500                     3500                                3500                               3500
     (Litre)

                                            SPEL Environmental accepts no responsibility for any loss or damage resulting from any person acting
                                            on this information. The details and dimensions contained in this document may change, please check
                                                    with SPEL Environmental for confirmation of current specifications. *Height does not include lid.




4

Section 78

PLAN
                       1100                1100

                               740
          1000




 INLET                                                      OUTLET
          1290




ELEVATIONS



                              2200                                                               950                    950

                                                                                                           1040
                               600
                                                                1900
          900




                                                                                                                                       2290




ALL DIMENSIONS IN MM
DATE        REVISED      BY                                        TITLE:
                                                                            SPEL - ECOCEPTOR
                                                                            1000 SERIES
                                                                            POLY
                              STORMWATER QUALITY
                              IMPROVEMENT DEVICE                   SIZE       CODE               DWG No:                                 REV
                              100 SILVERWATER RD, SILVERWATER          A4            N/A                   SP11-10130                          0
                                           NSW. 2128.
                                      PH: + 61 2 8705 0255
                                      FAX: + 61 2 9630 0369        SCALE                   DRAWN BY: P.LEE        SHEET
                                    EMAIL: [email protected]                N.T.S                                             1 of 1
                                        www.spel.com.au                                    DATE: 27/8/2012


                                                                                                                                                   5

Section 79

                          ECOCEPTOR
                                          2000 SERIES

    SELECTION CHART
    Weight approximately 350kg each


     Model                    E/202222               E/203030
                                                                                     2000E/203737                            E/204545


     Inlet (mm)                  225                      300                                 375                                450


     Outlet (mm)                 225                      300                                 375                                450

     Invert* Level
                                 990                      990                                 990                                990
     (mm)

     Overall* Height
                                2200                     2200                                2200                               2200
     (mm)

     Diameter (mm)              1800                     1800                                1800                               1800

     Manhole Opening
                              600 x 600              600 x 600                           600 x 600                           600 x 600
     (mm)

     Manhole Quantity             1                         1                                  1                                   1

     Max Silt Capacity
                                1200                     1200                                1200                               1200
     (Litre)

     Max Hydrocarbon
                                1200                     1200                                1200                               1200
     Capacity (Litre)

     Max Capacity
                                4400                     4400                                4400                               4400
     (Litre)

                                            SPEL Environmental accepts no responsibility for any loss or damage resulting from any person acting
                                            on this information. The details and dimensions contained in this document may change, please check
                                                    with SPEL Environmental for confirmation of current specifications. *Height does not include lid.




6

Section 80

PLAN
                                    800




                                                              100
                                    600




                                                              200
        2200
               990




                                                                    990
                     200

INLET                                                                     OUTLET



                                                             200




ELEVATIONS


                                    800
                                    600
        800

               600




                                                                                                                Ø1200
                                                                                                                Ø1600
                                                                                                                Ø1700




ALL DIMENSIONS IN MM
DATE           REVISED     BY                                        TITLE:
                                                                               SPEL - ECOCEPTOR
                                                                               2000 SERIES
                                STORMWATER QUALITY
                                IMPROVEMENT DEVICE                   SIZE        CODE               DWG No:                          REV
                                100 SILVERWATER RD, SILVERWATER           A4            N/A                   SP11-7410                    0
                                             NSW. 2128.
                                        PH: + 61 2 8705 0255
                                        FAX: + 61 2 9630 0369        SCALE                    DRAWN BY: P.LEE       SHEET
                                      EMAIL: [email protected]                 N.T.S                                        1 of 1
                                          www.spel.com.au                                     DATE: 27/8/2012


                                                                                                                                               7

Section 81

                            ECOCEPTOR
                                          4000 SERIES

    SELECTION CHART
    Weight approximately 500kg each


     Model                    E/403737               E/404545
                                                                                     4000E/405252                            E/406060


     Inlet (mm)                  375                      450                                 520                                600


     Outlet (mm)                 375                      450                                 520                                600


     Invert* Level
                                 1390                    1390                                1390                                1390
     (mm)

     Overall* Height
                                 3000                    3000                                3000                                3000
     (mm)


     Diameter (mm)               2000                    2000                                2000                                2000


     Manhole Opening
                              600 x 900               600 x 900                          600 x 900                           600 x 900
     (mm)


     Manhole Quantity             1                        1                                   1                                   1


     Max Silt Capacity
                                 2500                    2500                                2500                                2500
     (Litre)

     Max Hydrocarbon
                                 1500                    1500                                1500                                1500
     Capacity (Litre)


     Max Capacity (Litre)        7600                    7600                                7600                                7600

                                            SPEL Environmental accepts no responsibility for any loss or damage resulting from any person acting
                                            on this information. The details and dimensions contained in this document may change, please check
                                                    with SPEL Environmental for confirmation of current specifications. *Height does not include lid.




8

Section 82

PLAN

                                          800
                                          600




                                                                  250 100
                         300
          3000

                  1390




                                                                            1390
 INLET                                                                             OUTLET


                                                               300




ELEVATIONS




                                          800
                                          600
           1100
                  900




                                                                                                                          Ø1300
                                                                                                                          Ø1800
                                                                                                                          Ø1900


ALL DIMENSIONS IN MM
DATE        REVISED            BY                                             TITLE:
                                                                                        SPEL - ECOCEPTOR
                                                                                        4000 SERIES
                                    STORMWATER QUALITY
                                    IMPROVEMENT DEVICE                       SIZE         CODE               DWG No:                          REV
                                    100 SILVERWATER RD, SILVERWATER                A4            N/A                   SP11-16010                   0
                                                 NSW. 2128.
                                            PH: + 61 2 8705 0255
                                            FAX: + 61 2 9630 0369            SCALE                     DRAWN BY: P.LEE       SHEET
                                          EMAIL: [email protected]                      N.T.S                                        1 of 1
                                              www.spel.com.au                                          DATE: 27/8/2012


                                                                                                                                                        9

Section 83

                            ECOCEPTOR
                                   6000 SERIES

 SELECTION CHART
 Weight approximately 700kg each


     Model                         E/606767                                E/607575
                                                                                      6000                            E/609090


     Inlet (mm)                      675                                        750                                        900


     Outlet (mm)                     675                                        750                                        900


     Invert* Level (mm)              1690                                      1690                                       1690


     Overall* Height (mm)            3300                                      3300                                       3300


     Diameter (mm)                   2400                                      2400                                       2400


     Manhole Opening (mm)          600 x 600                               600 x 600                                   600 x 600


     Manhole Quantity                 2                                           2                                          2


     Max Silt Capacity (Litre)       6000                                      6000                                       6000

     Max Hydrocarbon
                                     2200                                      2200                                       2200
     Capacity (Litre)

     Max Capacity (Litre)           12500                                     12500                                      12500

                                           SPEL Environmental accepts no responsibility for any loss or damage resulting from any person acting
                                           on this information. The details and dimensions contained in this document may change, please check
                                                   with SPEL Environmental for confirmation of current specifications. *Height does not include lid.




10

Section 84

PLAN

                                    800
                                    600




                                                           300 100
                      290
        3300
               1690




                                                                     1690
INLET                                                                       OUTLET




                                                           290




ELEVATIONS




                                    800
                                    600
                            800




                                             600
                            800




                                             600




                                    600




                                                                                                                   Ø1600
                                                                                                                   Ø2200
                                                                                                                   Ø2300




ALL DIMENSIONS IN MM
DATE           REVISED      BY                                              TITLE:
                                                                                    SPEL - ECOCEPTOR
                                                                                    6000 SERIES
                                  STORMWATER QUALITY
                                  IMPROVEMENT DEVICE                        SIZE      CODE               DWG No:                          REV
                                  100 SILVERWATER RD, SILVERWATER              A4            N/A                   SP11-15610                   0
                                               NSW. 2128.
                                          PH: + 61 2 8705 0255
                                          FAX: + 61 2 9630 0369             SCALE                  DRAWN BY: P.LEE       SHEET
                                        EMAIL: [email protected]                    N.T.S                                        1 of 1
                                            www.spel.com.au                                        DATE: 27/8/2012


                                                                                                                                                    11

Section 85

HEAD OFFICE
PO Box 6144
Silverwater NSW 1811

100 Silverwater Rd
Silverwater NSW 2128

Phone: +61 2 8705 0255
Fax: +61 2 8014 8699

DESIGN OFFICES
New South Wales 61 2 8705 0255
Canberra            61 2 6128 1000
Queensland          61 7 3271 6960
Victoria & Tasmania 61 3 5274 1336
South Australia     61 8 8275 8000
West Australia      61 8 9350 1000
Northern Territory  61 2 8705 0255
New Zealand         64 9 276 9045

www.spel.com.au
SPEL Environmental accepts no responsibility for any loss or damage resulting
from any person acting on this information. The details and dimensions contained
in this document may change, please check with SPEL Environmental for
confirmation of current specifications.



                                                                                   SPEL Ecoceptor Selector 2.0

Section 86

                                                  Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                               Ref: 20769 C R001 Rev 05 15.12.17
                                                                                                 December 2017




                                                   Appendix H
        Noosa Shire Council (Interactive) & Unitywater Mapping




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Section 87

Unitywater Map

 

 

 

 

 

 

 

 

November 14, 2017 1:1,000
»4 Water System Vale Water Fitting Water Reticulation Main Sewer Gravity Main Easement 0 0.0075 0.015 0.03 mi
Water Auxiliary Valve Tee —— Reticulation Main Reticulation Main Unitywater Operational Area 0 0.0175 0.035 0.07 km
a Air 4 End Cap Sewer Manhole i=l Approved Development Applications
Water Hydrant © TappingDevce © Maintenance Shaft (NNN) Unapproved Development Applications Sources: Esr, HERE, DeLorme, Intermap, increment P Corp.,
* Hydrant Water Trunk Main ® Manhole Cadastral Parcels Gouc mec he Midieaco”
es Trunk Mairi Base swisstopo, Mapmyindia, © OpenStreetMap contributors, and the GIS

Unitywater
NPSR, Es, © OpenStreetMap contributors, HERE, Garmin, USGS | © State of Queensland (Department of Natural Resources and Mines), 2016 |

Section 88

Noosa Shire Council does not warrant the accuracy of information in this publication and any person using or relying   9/11/2017
upon such information does so on the basis that Noosa Shire Council shall bear no responsibility or liability
whatsoever for any errors, faults, defects or omissions in the information.
                                                                                                                        1:500

Section 89

                                                  Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                               Ref: 20769 C R001 Rev 05 15.12.17
                                                                                                 December 2017




                                                                                 Appendix I
                                                                           DBYD Information




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH

Section 90

                                                                                                                          Phone: 1100
                                                      Job No 13224872                                                www.1100.com.au


         Caller Details
    Contact:              Mr ADG Engineers                               Caller Id: 1776390                  Phone: 1300 657 402
    Company:              ADG Engineers (Aust.) PTY LTD                  Mobile:     Not Supplied           Fax:       Not Supplied
    Address:              PO Box 208 1 Short Street                      Email:      [email protected]
                          Southport QLD 4215

         Dig Site and Enquiry Details
WARNING: The map below only displays the location of the proposed dig site and does not display any asset owners' pipe or cables.
The area highlighted has been used only to identify the participating asset owners, who will send information to you directly.
                                                                         User Reference:       20769
                                                                         Working on Behalf of:
                                                                         Other
                                                                         Enquiry Date:              Start Date:           End Date:
                                                                         07/11/2017                 09/11/2017            11/11/2017
                                                                         Address:
                                                                         20769 175 Eumundi Noosa Road
                                                                         Noosaville QLD 4566
                                                                         Job Purpose:           Excavation
                                                                         Onsite Activity:       Mechanical Excavation
                                                                         Location of Workplace: Both
                                                                         Location in Road:      CarriageWay,Footpath,Nature Strip
                                                                          ● Check that the location of the dig site is correct. If not you must
                                                                             submit a new enquiry.
                                                                          ● Should the scope of works change, or plan validity dates expire,
                                                                            you must submit a new enquiry.
                                                                          ● Do NOT dig without plans. Safe excavation is your responsibility.
                                                                            If you do not understand the plans or how to proceed safely,
                                                                            please contact the relevant asset owners.
Notes/Description of Works:
Not Supplied


         Your Responsibilities and Duty of Care
  ● If plans are not received within 2 working days, contact the asset owners directly & quote their Sequence No.
  ● ALWAYS perform an onsite inspection for the presence of assets. Should you require an onsite location, contact the asset owners directly.
    Please remember, plans do not detail the exact location of assets.
  ● Pothole to establish the exact location of all underground assets using a hand shovel, before using heavy machinery.
  ● Ensure you adhere to any State legislative requirements regarding Duty of Care and safe digging requirements.
  ● If you damage an underground asset you MUST advise the asset owner immediately.
  ● By using this service, you agree to Privacy Policy and the terms and disclaimers set out at www.1100.com.au
  ● For more information on safe excavation practices, visit www.1100.com.au

         Asset Owner Details
The assets owners listed below have been requested to contact you with information about their asset locations within 2 working days.
Additional time should be allowed for information issued by post. It is your responsibility to identify the presence of any underground
assets in and around your proposed dig site. Please be aware, that not all asset owners are registered with the Dial Before You Dig service,
so it is your responsibility to identify and contact any asset owners not listed here directly.
** Asset owners highlighted by asterisks ** require that you visit their offices to collect plans.
# Asset owners highlighted with a hash require that you call them to discuss your enquiry or to obtain plans.

Seq. No.           Authority Name                                                    Phone                         Status
66003645 Energex, Electricity (Qld)                                                  0736645400                    NOTIFIED
66003649 NBN Co, Qld                                                                 1800626762                    NOTIFIED
66003644 Noosa Council                                                               0753296272                    NOTIFIED
66003647 Optus and/or Uecomm, Qld                                                    1800505777                    NOTIFIED
66003643 PIPE Networks, Qld                                                          1800201100                    NOTIFIED
66003646 Telstra QLD, South East                                                     1800653935                    NOTIFIED
66003648 Unitywater North                                                            1300086489                    NOTIFIED
END OF UTILITIES LIST




                        Lodge Your Free Enquiry Online – 24 Hours a Day, Seven Days a Week

Section 91

                                    ENERGEX DBYD RESPONSE
                                        “ASSETS FOUND - EXISTING”

                  Our search has revealed there is existing ENERGEX Underground Assets within
                        the nominated search area. They are shown on the attached plan(s).

To:      Mr ADG Engineers                                  DBYD Sequence No: 66003645
Company: ADG Engineers (Aust.) PTY LTD                     Date of Response: 07-Nov-2017
Address: PO Box 208 1 Short Street                         Period of Plan Validity: 28 Days
              Southport QLD 4215
Email Address:                                    Phone:                   Mobile:                 Fax:
[email protected]                     1300 657 402                       Not Supplied            Not Supplied
Location of Search: 175 Eumundi Noosa Road
                    Noosaville QLD 4566
UBD Map Ref: 18E2,18E3,18F2,18F3
External Comments (if any):

It is important that you note:
    1.   Please read and understand all the information and disclaimers provided – including the Terms and Conditions on
         the attached pages.
    2.   We have only searched that area which has been nominated. If this nominated area is not what you require,
         please resubmit another enquiry with DBYD
    3.   Plans provided by ENERGEX are only an indication of the presence of Underground assets within the nominated
         locations provided are approximate and the plans are not suitable for scaling purposes as exact ground cover and
         alignments cannot be provided.
    4.   Plans provided by ENERGEX do not show the presence of any Overhead Network.
    5.   That in addition to underground cables marked on attached plan there maybe underground Earth Conductors or
         Consumers Mains in the vicinity of the nominated work area(s) that are not marked on the plans.
    6.   This advice does not identify the presence of private underground cables (inc. consumers’ mains) that may run
         from ENERGEX mains onto private property. Assets located on private property are the responsibility of the
         owner for identification and location.
    7.   Underground Cable Locators can be found in the Yellow Pages under Electronic Detectors, or Underground
         Service Locators on an Internet search.
    8.   The ENERGEX Dial Before You Dig information provides the vicinity of underground cable and will not be
         adequate for conveyancing purposes. A Solicitor's Search can be arranged through ENERGEX.
    9.   In the event that excavation does not commence within 28 days of receipt of a plan, a new plan should be
         obtained.
    10. For Cable Support advice around the 33Kv and 110Kv Underground Networks please note that you should allow
        for a minimum of twenty (20) working days advance notice in your construction program to permit ENERGEX time
        to allocate the necessary resources to carry out the investigations. Please contact the ENERGEX DBYD team on
        the details listed below.
    11. Immediately report life threatening emergencies to ENERGEX on 13 19 62




ENERGEX Limited - ABN 40 078 849 055                                                    24 Hour Loss of Supply 13 62 62
26 Reddacliff Street Newstead QLD 4006      24 Hour Emergencies 13 19 62
GPO Box 1461 Brisbane Queensland 4001                                                       General Enquires 13 12 53
        Contact ENERGEX DBYD Monday to Friday from 7 am to 3:30 pm on (07) 3664 5400 or [email protected]
                                              www.energex.com.au

            To resubmit or change the nominated search area contact DBYD via Phone 1100 or www.1100.com.au

Section 92

                                                                                                                                                0080 11.04.2016
                                                                                                                                                     Page 1 of 3




             Energex DBYD                                                                                              Electricity Emergencies
       Business Hours Contact                     Dial Before You Dig (DBYD)                                            All Areas – 24 Hours
      (7am – 3:30pm Weekdays)
            Ph. (07) 3664 5400                         Terms and Conditions                                                   13 19 62
     Email - [email protected]

                                                         “Duty of Care” for Everyone”
                                                          U




           1. Responsibilities – (When Working in the Vicinity of Energex Plant)
 Everyone has a legal “Duty of Care” that must be observed, particularly when working in the vicinity of electrical plant. Electrical plant includes
 underground cables, conduits and other associated underground equipment. When discharging this “Duty of Care” in relation to Energex plant, the
 following points must be considered:


 1. It is the responsibility of the architect, consulting engineer, developer, and head contractor in the project planning stages to design for minimal impact
    and protection of Energex plant.
 2. It is the constructor’s responsibility to:
      a)    Anticipate and request plans of Energex plant for a particular location at a reasonable time before construction begins.
      b)    Visually locate Energex plant by hand or vacuum excavation where construction activities may damage or interfere with Energex plant.
      c)    Contact Energex (see above for details) if Energex plant is wholly or partly affected by planned construction activities.
      d)    For proposed excavations within 500mm of any 33kV & 110/132kV underground networks, please allow a minimum of 20 working days’ notice
            in your construction program for Energex to review proposed designs, provide comment and allow some time for any required modifications to
            be made.
      e)    To notify Energex if the information provided is found to be not accurate or assets are found on site that are not recorded on the Energex
            DBYD plans.
      f)    Read and understand all the information and disclaimers provided
 IMPORTANT NOTES:
 Plans and or details provided by Energex are current for one month from the date of dispatch and should be disposed of by shredding or any
     other secure disposal method after use. A new DBYD enquiry must be made for proposed works/activities to be undertaken outside of the 30 day
     period.
    As the alignment and boundaries of road ways with other properties (and roads within road ways) frequently change, the alignm ents and boundaries
     contained within Energex plans and maps will frequently differ from present alignments and boundaries “on the ground”. Accordingly, in every case
     where it appears that alignments and boundaries have shifted, or new road ways have been added, the constructor should obtain confirmation of
     the actual position of Energex cables and pipelines under the road ways. In no case should the constructor rely on statements of third parties in
     relation to the position of Energex cables and pipelines. It is the applicant’s responsibility to accurately locate all services as part of the design
     and/or prior to excavation.
    Energex does not provide information on private underground installations, including consumers’ mains that may run from Energex mains onto
     private property. Assets located on private property are the responsibility of the owner for identification and location.
     Energex retains copyright of all plans and details provided in connection with your request.
    Energex plans or other details are provided for the use of the applicant, its servants, or agents, and shall not be used for any unauthorised purpose.
    Energex plans are circuit diagrams or pipe indication diagrams only and indicate the presence of plant in the general vicinit y of the geographical
     area shown. Exact ground cover and alignments cannot be given with any certainty; as such levels can change over time.
    Energex, its servants or agents shall not be liable for any loss or damage caused or occasioned by the use of plans and or details so supplied to the
     applicant, its servants and agents, and the applicant agrees to indemnify Energex against any claim or demand for any such loss or damage.
    The constructor is responsible for all plant damages when works commence prior to obtaining Energex plans, or failure to foll ow agreed instructions,
     or failure to demonstrate all reasonable measures were taken to prevent the damage once plans were received from Energex.
    Energex reserves all rights to recover compensation for loss or damage caused by interference or damage, inclu ding consequential loss and
     damages to its cable network, or other property.
    All underground conduits are presumed to contain asbestos. Refer to “Code of Practice for the Management and Control of Asbestos in Workplaces
     [NOHSC: 2018 (2005)]
    Plans provided by Energex do not show the presence of any Overhead Network
    In addition to underground cables marked on attached plan there maybe underground Earth Conductors in the vicinity of the nominated work area(s)
     that are not marked on the plans.
    There may also be other buried assets such as tanks for fluid filled cables that do not appear on GIS plots but are shown on detailed as constructed
     drawings.
    Being aware of your obligations in [s 304] Excavation work— underground essential services information under the Work Health and Safety
     Regulation 2011, Chapter 6 Construction work, Part 6.3 Duties of person conducting business or undertaking. This includes but is not limited to
     taking reasonable steps to obtain the current information & providing this information to persons engaged to carry out the excavation work. For
     further information please refer to: - http://www.legislation.qld.gov.au/LEGISLTN/SLS/2011/11SL240.pdf
    Energex plans are designed to be printed in colour and as an A4 Landscape orientation.




                                         Energex Limited  GPO Box 1461 Brisbane Queensland 4001  ABN 40 078 849 055

Section 93

                                                                                                                                                0080 30.09.2013
                                                                                                                                                     Page 2 of 3




          2. Conditions – (When Working in the Vicinity of Energex Plant)
2.1 Records:
The first step before any excavation commences is to obtain records of Energex plant in the vicinity of the work. For new work, records should be
obtained during the planning and design stage. The records provided by Energex must be made available to all construction groups on site. Where
plant information is transferred to plans for the proposed work, care must be exercised to ensure that important detail is not lost in the process.
2.2 Location of Cables:
Examining the records is not sufficient, as reference points may change from the time of installation. Records must also be physically proven when
working in close proximity to them. The exact location of plant likely to be affected shall be confirmed by use of an electronic cable and pipe locater
followed by careful hand or vacuum excavation to the level of cover slabs or conduits. When conducting locations Please be aware that no
unauthorised access is permitted to Energex Assets– including Pits, Low Voltage Disconnection Boxes, Low Voltage Pillars or High Voltage Link Boxes.
Hand or vacuum excavation must be used in advance of excavators. In any case, where any doubt exists with respect to interpretation of cable
records, Energex shall be contacted. For after hour’s emergencies Energex should be contacted on Ph. 13 62 62.
2.3 Electrical Cable Installation Methods:
Energex cables are installed with a variety of protection devices including:
1.   Clay paving bricks or tiles marked “Electricity” or similar (also unmarked)                             2.    Concrete or PVC cover slabs
3.   PVC, A/C or fibro conduit, fibre reinforced concrete, iron or steel pipe                                4.    Concrete encased PVC or steel pipe
5.   Thin plastic marker tape                                                                                6.    Large pipes housing multiple ducts
7.   Multiple duct systems, including earthenware or concrete 2-, 4-, and 6-way ducts and shamrocks
Note: Some cables are known to be buried without covers and cables may change depth or alignment along the route.
2.4 Excavating Near Cables:
For all work within 2.5 m of nominal location, the constructor is required to hand or vacuum excavate (pothole) and expose th e plant, hence proving its
exact location before work can commence.
 2.5 Excavating Parallel to Cables:
If construction work is parallel to Energex cables, then hand or vacuum excavation (potholing) at least every 4 m is required to establish the location of
all cables, hence confirming nominal locations before work can commence. Generally, there is no restriction to excavations parallel to Energex cables to
a depth not exceeding that of the cable. If an excavation exceeds the depth of the cables and it is likely that the covers or bedding material around the
cables/pipes will move, Energex must be contacted .Note: Cable depths & alignment may change suddenly.

2.6 Separation from Cables:
Any service(s) must be located at the minimum separation as per the tables below:

Table 1. Minimum Separation Requirements for Underground Services Running Parallel with Energex Assets

 (Minimum Separation required in mm)
 Voltage   Gas        Communication                                Water                      Sanitary drainage               Storm
  Level                    or TV                                                                                              Water
                                                         ≤DN 200           >DN200          ≤DN 200           >DN 200
     LV                               100
                  250                                  500            *1000           500           1000                        500
     HV                               300
                                    *Contact Energex/council to obtain specific separation distances

Table 2. Minimum Separation Requirements for Underground Services Crossing Energex Assets

 (Minimum Separation required in mm)
 Voltage     Gas          Communication                                        Water                    Sanitary drainage              Storm Water
  Level                         or TV
 LV & HV
             100                 100                                           300                                300                        100

Where the above table does not list a separation requirement for a particular underground service then 300mm shall be used.

2.7 Excavating Across Cables:
The standard clearance between services shall be maintained as set down in Table 2 above. If the width or depth of the excavation is such that the
cables will be exposed or unsupported, then Energex shall be contacted to determine whether the cables should be taken out of service, or whether
they need to be protected or supported. In no case shall a cable cover be removed without approval. A cable cover may only be removed under the
supervision of an Energex authorised representative. Protective cover strips when removed must be replaced under Energex supervision. Under no
circumstances shall they be omitted to allow separation between Energex cables and other services.
2.8 Heavy Machinery Operation Over Cables:
Where heavy “Crawler” or “Vibration” type machinery is operated over the top of cables, a minimum cover of 450 mm to the cabl e protective cover
mains must be maintained using load bearing protection whilst the machinery is in operation. For sensitive cables (i.e. 33 and 110kV fluid and gas filled
cables), there may be additional constraints placed on vibration and settlement by Energex.
2.9 Directional Boring Near Cables:
When boring parallel to cables, it is essential that trial holes are carefully hand or vacuum excavated at regular intervals to prove the actual location of
the conduits/cables before using boring machinery. Where it is required to bore across the line of cables, the actual locati on of the cables shall first be
proven by hand or vacuum excavation. A trench shall be excavated one metre from the side of the cables where the auger will approach to ensure a
minimum clearance of 500mm above and below all LV, 11kV, 33kV & 110/132kV cables shall be maintained.




                                      Energex Limited  GPO Box 1461 Brisbane Queensland 4001  ABN 40 078 849 055

Section 94

                                                                                                                                                0080 30.09.2013
                                                                                                                                                     Page 3 of 3




2.10 Explosives:
Explosives must not be used within 5 metres of cables, unless an engineering report is provided indicating that no damage will be sustained. Clearances
should be obtained from Energex’s Planning Engineer for use of explosives in the vicinity of Energex cables.
2.11 Damage Reporting:
All damage to cables, conduits and pipes must be reported no matter how insignificant the damage appears to be. Even very minor damage to cable
protective coverings can lead to eventual failure of cables through corrosion of metal sheaths and moisture ingress.
All work in the vicinity of damaged plant should cease and the area should be vacated until a clearance to continue work has been obtained from an
Energex officer.
2.12 Plant Solutions and Assistance:
If plant location plans or visual location of Energex plant by hand or vacuum excavation reveals that the location of Energex plant is situated wholly or
partly where the developer or constructor plans to work, then Energex shall be contacted to arrange for possible engineering solutions.
If Energex relocation or protection works are part of the agreed solution, then payment to Energex for the cost of this work shall be the responsibility of
the principal developer or constructor. Energex will provide an estimated quotation for wor k on receipt of the developer’s or constructor’s order number
before work proceeds.
It will be necessary for the developer or constructor to provide Energex with a written Work Method Statement for all works i n the vicinity of, or involving
Energex plant. This Work Method Statement should form part of the tendering documentation and work instruction.
2.13 Remote or On-Site Location Advice: This service shall be provided at Energex’s discretion:
In response to your request, Energex may provide a site visit when 33kV or above cables are present only, however any markings or pegs placed on the
site will be indications of approximate equipment locations only. All markings must be confirmed by careful hand or vacuum excavation.
Energex may provide either remote over the phone or on-site location advice to assist in the location of Energex plant, including how to visually locate
and protect the plant when excavating.
Where on-site location advice is provided, the constructor is responsible for all hand or vacuum excavation (potholing) to visually locate and expose
Energex plant.

2.14 Vacuum Excavations (Hydro Vac)
When operating hydro vac equipment to excavate in vicinity of underground electrical assets (cables/conduits):
Fitted with:
              Nonconductive (neoprene rubber or equivalent) vacuum (suction) hose.
              Oscillating nozzle on pressure wand with water pressure adjusted to not exceeding 2000 psi.
Maintain a minimum distance of 200mm between end of pressure wand and underground electrical assets. DO NOT insert the pressure wand jet
directly into subsoil.
Ensure pressure wand is not directly aimed at underground electrical assets (cables/conduits).


2.15 Safety Notices (Underground Work)
There is no exclusion zone applicable for underground electrical assets – conduits, cables (unless cable is damaged, or conductors or terminations have
been exposed) therefore there is no requirement for a written Safety Advice to be obtained provided the work location does not contain overhead
electric lines or other exposed live parts.




                     Thank you for your interest in maintaining a safe and secure Electricity Distribution network.

                     Energex welcomes your feedback on this document via email to [email protected]




                                       Energex Limited  GPO Box 1461 Brisbane Queensland 4001  ABN 40 078 849 055

Section 95

PAPER SIZE A3

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented For Emergency Situations

  
    
   

  

on the ENERGEX EnerGISe DBYD map, then ENERGEX shall be contacted immediately. Please call 13 19 62 <8, ates ay
/ oi PRL Wy
- 7 \ energex
‘
5 | GIs
DBYD

 

Date: 07 Nov 17 Time: 16.57.40
Requested By: DBYD

NOT TO SCALE

° 100m

 

Enquiry No: 66003645
KEY MAP

 

Enquiry Area

 

 

 

 

LOCALITY DIAGRAM

Noo

  

!
|
!
|
!
!
!

 

This output provides details of the ENERGEX olectrical network. As variations may exist no responsibility is incurred by ENERGEX for the UNCONTROLLED (OPY

of the infor ic d, Exact positions of cables and electrical connectivity should be confirmed on site.

 

PAPER SIZE A3

 

 

Section 96

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

4200

8800

P1297654

8700

 

©P1297659
5
oe!

_——

181

707 8600m N
A

 

4300 4400

    

168

   

For Emergency Situations
Please call 13 19 62

———} 8800

8700

8600

 

 

894200m

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

4300 4400

UNCONTROLLED COPY

alee
*

SgQyD
energex

GIS
DBYD

Date: 07 Nov 17 Time: 16.57.52
Requested By: DBYD

SCALE 1:1000

20 ° 20m

-

 

Enquiry No: 66003645

STRIP No: 1

—- Cable Voltage
(A Ground Transformer Less Than 33k

Cubicle Transformer ™@™ Cable Voltage

33kV or Higher
fa Ring Main Unit
@) Metering Unit © Direer-Lay
wv Link Pillar O Conduit
[Service Pillar Multi-Section
Duct

Junction Pillar
i ’ Trench

J Pit
ma Cable Joint Cable Tray
b> Cable Termination LE] Tunnel

4 Cable Marker

Street Light Pole
li Earth

Works Order
Polygon

 

 

INDEX TO SHEETS

 

 

 

 

 

 

LOCALITY DIAGRAM
i a 2
Ce a
C LA

NOOSAVILLE _ \
a)

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 97

                                                             Working near
                                                              nbn cables          TM




nbn has partnered with Dial Before You Dig to give you a single point of contact to
get information about nbn underground services owned by nbn and other utility/service
provider in your area including communications, electricity, gas and other services. Contact
with underground power cables and gas services can result in serious injury to the worker, and
damage and costly repairs. You must familiarise yourself with all of the Referral Conditions
(meaning the referral conditions referred to in the DBYD Notice provided by nbn).



Practice safe work habits
Once the DBYD plans are reviewed, the Four P’s of Excavation should be adopted in conjunction with your safe
work practices (which must be compliant with the relevant state Electrical Safety Act and Safe Work Australia
“Excavation Work Code of Practice”, as a minimum) to ensure the risk of any contact with underground nbn
assets are minimised.




Plan: Plan your job         Pothole: Non-destructive     Protect: Protecting and      Proceed: Proceed only
ensuring the plans          potholing (i.e. hand         supporting the exposed       when the appropriate
received are current and    digging or hydro             nbn underground asset        planning, potholing and
apply to the work to be     excavation) should           is the responsibility of     protective measures are in
performed. Also check for   be used to positively        the worker. Exclusion        place.
any visual cues that may    locate nbn underground       zones for nbn assets are
indicate the presence of    assets with minimal risk     clearly stated in the plan
services not covered in     of contact and service       and appropriate controls
the DBYD plans.             damage.                      must be implemented to
                                                         ensure that encroachment
                                                         into the exclusion zone
                                                         by machinery or activities
                                                         with the potential to
                                                         damage the asset is
                                                         prevented.

Section 98

Working near nbn cables                                                                  TM




    Identify all electrical hazards,                              When using excavators and other                                   Workers and equipment must
    assess the risks and establish                                machinery, also check the location                                maintain safety exclusion zones
    control measures.                                             of overhead power lines.                                          around power lines.




Once all work is completed, the excavation should be re-instated with the same type of
excavated material unless specified by nbn. Please note:

• Construction Partners of nbn may require additional controls to be in place when performing
  excavation activities.

• The information contained within this pamphlet must be used in conjunction with other
  material supplied as part of this request for information to adequately control the risk of
  potential asset damage.




Contact
In the event of the nbnTM network facility damage
please call 1800 626 329

Disclaimer
This brochure is a guide only. It does not address all the matters you need to consider when working near our cables. You must
familiarise yourself with other material provided (including the Referral Conditions) and make your own inquiries as appropriate.
nbn will not be liable or responsible for any loss, damage or costs incurred as a result of reliance on this brochure.
This document is provided for information purposes only. This document is subject to the information classification set out on this
page. If no information classification has been included, this document must be treated as UNCLASSIFIED, SENSITIVE and must not
be disclosed other than with the consent of nbn co. The recipient (including third parties) must make and rely on their own inquiries
as to the currency, accuracy and completeness of the information contained herein and must not use this document other than with
the consent of nbn co. Copyright © 2017 nbn co limited. All rights reserved.

Section 99

Indicative Plans

Issue Date:   07/11/2017
              175 Eumundi Noosa
Location:
              Road,Noosaville,QLD-4566

Section 100

 

 

 

 

LEGEND
Type: Telco

Technology :Copper/Fibre
-—}-. Assets 0 SHALE 60 Meters 12000
IN-SERVICE:
Cable/ Duct/ Trench 1 cm equals 20 m

s DESIGNED/CONSTRUCTED:
Cable/ Duct/ Trench || Pit/Manhole mm

 

 

 

 

 

 

 

 

 

 

Level 11, 100 Arthur Street, North Sydney NSW 2060
© 2015 nbn co limited | ABN 86 136 533 741 Email [email protected] Web nbn.com.au

Section 101

Emergency Contacts
You must immediately report any damage to nbn™ network that you are/become aware of.
Notification may be by telephone - 1800 626 329.

Section 102

To:                    Mr ADG Engineers
Phone:                 1300 657 402
Fax:                   Not Supplied
Email:                 [email protected]


Dial before you dig
                        13224872
Job #:
Sequence #              66003649
Issue Date:             07/11/2017

                        175 Eumundi Noosa
Location:
                        Road,Noosaville,QLD-4566




Information
The area of interest requested by you contains one or more assets.

       nbn Assets                    Search Results
     Communications                  Asset identified
       Electricity                     No assets

In this notice NBN Facilities means underground fibre optic, telecommunications and/or power
facilities, including but not limited to cables, owned and controlled by nbn




Location of Underground Power Facilities

We thank you for your enquiry. In relation to your enquiry at the above address:

     • nbn's records indicate that there ARE nbn Facilities in the vicinity of the location
       identified above ("Location").
     • nbn indicative plan/s are attached with this notice ("Indicative Plans").

Section 103

     • The Indicative Plan/s show general depth and alignment information only and are not
       an exact, scale or accurate depiction of the location, depth and alignment of nbn
       Facilities shown on the Plan/s.
     • In particular, the fact that the Indicative Plans show that a facility is installed in a
       straight line, or at uniform depth along its length cannot be relied upon as evidence
       that the facility is, in fact, installed in a straight line or at uniform depth.
     • You should read the Indicative Plans in conjunction with this notice and in particular,
       the notes below.
     • You should note that, at the present time, the Indicative Plans are likely to be more
       accurate in showing location of fibre optics and telecommunications cables than power
       cables. There may be a variation between the line depicted on the Indicative Plans and
       the location of any power cables. As such, consistent with the notes below, particular
       care must be taken by you to make your own enquiries and investigations to precisely
       locate any power cables and manage the risk arising from such cables accordingly.
     • The information contained in the Indicative Plan/s is valid for 28 days from the date of
       issue set out above.You are expected to make your own inquiries and perform your
       own investigations (including engaging appropriately qualified plant locators at your
       cost to locate nbn Facilities during any activities you carry out on site).

We thank you for your enquiry and appreciate your continued use of the Dial Before You Dig
Service.If you are planning to excavate and require further information, please contact nbn on
1800 626 329. For any enquiries related to moving assets or Planning and Design activities,
please email the nbn at [email protected]:

    1. You are now aware that there are nbn Facilities in the vicinity of the above property that could be
       damaged as a result activities carried out (or proposed to be carried out) by you in the vicinity of the
       Location.
    2. You should have regard to section 474.6 and 474.7 of the Criminal Code Act 1995 (CoA) which deals
       with the consequences of interfering or tampering with a telecommunications facility. Only persons
       authorised by nbn can interact with nbn's network facilities.
    3. Any information provided is valid only for 28 days from the date of issue set out above.



Referral Conditions

      The following are conditions on which nbn provides you with the Indicative Plans. By
      accepting the plans,you are agreeing to these conditions. These conditions are in
      addition, and not in replacement of, any duties and obligations you have under
      applicable law.
   1. nbn does not accept any responsibility for any inaccuracies of its plans including the
      Indicative Plans. You are expected to make your own inquiries and perform your own

Section 104

   investigations (including engaging appropriately qualified plant locators at your
   expense to locate nbn Facilities during any activities you carry out on site).
2. You acknowledge that nbn has specifically notified you above that the Indicative Plans
   are likely to be more accurate in showing location of fibre optics and
   telecommunications cables than power cables. There may be a variation between the
   line depicted on the Indicative Plans and the location of any power cables.
3. You should not assume that nbn Facilities follow straight lines or are installed at
   uniformed depths along their lengths, even if they are indicated on plans provided to
   you. Careful onsite investigations are essential to locate the exact position of cables.
4. In carrying out any works in the vicinity of nbn Facilities, you must maintain the
   following minimum clearances:
         • 300mm when laying assets inline, horizontally or vertically.
         • 500mm when operating vibrating equipment, for example: jackhammers or
            vibrating plates.
         • 1000mm when operating mechanical excavators.
         • Adherence to clearances as directed by other asset owner's instructions and
            take into account any uncertainty for power cables.
5. You are aware that there are inherent risks and dangers associated with carrying out
   work in the vicinity of underground facilities (such as nbn fibre optic,copper and coaxial
   cables,and power cable feed to nbn assets).Damage to underground electric cables
   may result in:
         • Injury from electric shock or severe burns, with the possibility of death.
         • Interruption of the electricity supply to wide areas of the city.
         • Damage to your excavating plant.
         • Responsibility for the cost of repairs.
6. You must take all reasonable precautions to avoid damaging nbn Facilities. These
   precautions may include but not limited to the following:
         • All excavation sites should be examined for underground cables by careful
            hand excavation. Cable cover slabs if present must not be disturbed. Hand
            excavation needs to be undertaken with extreme care to minimise the likelihood
            of damage to the cable, for example: the blades of hand equipment should be
            aligned parallel to the line of the cable rather than digging across the cable.
         • If any undisclosed underground cables are located, notify nbn immediately.
         • All personnel must be properly briefed, particularly those associated with the
            use of earth-moving equipment, trenching, boring and pneumatic equipment.
         • The safety of the public and other workers must be ensured.
         • All excavations must be undertaken in accordance with all relevant legislation
            and regulations.
7. You will be responsible for all damage to nbn Facilities that are connected whether
   directly, or indirectly with work you carry out (or work that is carried out for you or on
   your behalf) at the Location. This will include, without limitation, all losses expenses
   incurred by nbn as a result of any such damage.
8. You must immediately report any damage to nbn™ network that you are/become
   aware of. Notification may be by telephone - 1800 626 329.

The text continues on section 105.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.