Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 115, section 1. The text section number identifies this passage in the reader.

All Optus pits and manholes should be a minimum of 1.0m in from the back of kerb or within 15m of street
intersection after the completion of your work.

All Optus conduit should have the following minimum depth of cover after the completion of your work:-

   •   Footway                 600mm

   •   Roadway         1000mm at drain invert and at road centre crown

In cases where it is considered that these clearances cannot be maintained at the completion of works advice is to be
sought form the Optus Damages and Relocations Team



FURTHER ASSISTANCE

Assistance can be obtained by contacting Optus Network Operations Asset Analysis on 1800 505 777

Where an on-site location is provided, the owner is responsible for all costs associated with hand digging or use of
non-destructive water jet method (pot holing) to visually locate and expose Optus plant.

If plant location drawings or visual location of Optus plant by digging reveals that the location of Optus plant is
situated wholly or partly where the owner plans to work, then Optus Damages and Relocates Team must be contacted
through Optus Network Operations Asset Locations to discuss possible engineering solutions.


OPTUS ENGINEERING DRAWING SYMBOLS




Optus Communications                                                                                       Page 4 of 6
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.