Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 134, section 1. The text section number identifies this passage in the reader.

                 Important Information
                 Disclaimer

                 All Unitywater’s records, data and information supplied via DBYD are indicative only. You
                 agree that any plans supplied to you has been or will be provided only for your convenience
                 and has not been and will not be relied upon by you for any purpose.

                 You also agree that Unitywater does not assume any responsibility or duty of care in respect
                 of, or warrant, guarantee or make any representation as to the Data (including its accuracy,
                 reliability, currency or suitability).

                 Unitywater’s plans only indicates the general vicinity of infrastructure in a geographic area and
                 does not state the depths at which infrastructure could be buried. You must first physically
                 locate the infrastructure by utilising relevant site detection methodologies prior to performing
                 any works or undertaking any activities near or adjacent to our infrastructure. You are solely
                 responsible for the selection of appropriate site detection methodologies at all times.

                 To the fullest extent permitted by law, Unitywater will not be liable to you in contract, tort,
                 equity, under statute or otherwise arising from or in connection with the provision of any plans
                 to you via DBYD.

                 Compliance with laws

                 There may be both indicated and unmarked hazards, dangers or encumbrances, including
                 underground asbestos pipes and abandoned mains within your nominated search area. You
                 are solely responsible for ensuring that appropriate care is taken at all times and that you
                 comply with all mandatory requirements relating to such matters, including in relation to
                 workplace health and safety.

                 Damaged Infrastructure

                 Please note that it is an offence under Section 192 of the Water Supply (Safety and Reliability)
                 Act 2008 to interfere with our infrastructure without Unitywater’s written consent.

                 You may be liable to Unitywater for any loss of or damage to our infrastructure, together with
                 any consequential or indirect loss or damage (including without limitation, loss of use, loss of
                 profits or loss of revenue) arising from or in connection with any interference with Unitywater’s
                 infrastructure by you or any other person for which you are legally responsible.

                 Any damage to Unitywater’s Infrastructure must be reported immediately to the (24 Hours)
                 Faults and Emergencies contact number on 1300 0 UNITY (1300 086 489).

                 Copyright

                 All Data is copyright.



                                                                                                                         Page 2 of 2
Unitywater is a statutory authority that provides water and sewerage                   Unitywater has certification to

services for the Moreton Bay, Sunshine Coast and Noosa Council areas.                  OH&S ISO 4801:2001 Reg No 4260
                                                                                       Environmental ISO 14001:2004 Reg No 4259
                                                                                       Quality Systems ISO 9001:2008 Reg No 4258
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.