Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 27, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Existing Services Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                           COMMENTS
                                                              S1.5                                                                           ✓
                                                              Alterations are constructed in accordance with Section 4
                                                              of PSP5 –Engineering Design Standards – Roads,
                                                              Drainage and Earthworks and applicable water and              To be complied with at detailed
                                                              sewerage design standards;                                    design / construction stages.



                                                              S1.6                                                                           ✓
                                                              Existing services are relocated and the design and
                                                              construction of the relocated services is in accordance
                                                              with Section 4 of PSP5 –Engineering Design Standards –        To be complied with at detailed
                                                              Roads, Drainage and Earthworks and applicable water           design / construction stages.
                                                              and sewerage design standards.


 O2                                                           S2.1                                                                           ✓
 Maintenance access is provided to all sewers, water mains,
 stormwater drains, overland flow paths and associated        For trunk infrastructure a registered easement in favour of
 structures.                                                  Council is created over all underground infrastructure        To be complied with at detailed
                                                              located in private property;                                  design / construction stages.
                                                              S2.2                                                                           ✓
                                                              The width of the easement is the greater of 3m or the width
                                                              of the zone of influence;                                     To be complied with at detailed
                                                                                                                            design / construction stages.
                                                              S2.3                                                                           ✓




 Solution:    ✓     =   Acceptable Solution
              A/S   =   Alternative Solution
              N/A   =   Not applicable to this proposal


Page 2 of 3
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.