Original source · versioned page text
Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
S10.5
Low impact construction techniques are used around areas
of vegetation to be retained to minimise interference with
the vegetation.
O11 No solution provided
Roads and stormwater drainage infrastructure is proven
to be suitable for its use prior to Council accepting the
dedicated asset.
O12 S12.1 ✓
Alignment of stormwater drainage infrastructure is to The location, design and construction of stormwater
allow for easy access for the ongoing maintenance by drainage structures is in accordance with Sections 4 and
Council. 5 of PSP5, Engineering Design Standards - Roads, To be complied with at detailed
Drainage and Earthworks; design / construction stages.
S12.2 ✓
Where infrastructure is located on private land an
easement is dedicated over the infrastructure in
accordance with Section 4 of PSP 5, Engineering Design To be complied with at detailed
Standards – Roads, Drainage and Earthworks. design / construction stages.
14.147 Frontage works
O13 S13.1 ✓
Development is provided with external roadworks along the The following infrastructure components already exist at
full extent of the frontage of the site to an appropriate the frontage of the site or are provided at the
standard having regard to the specified function of the road. developer’s expense—
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 13 of 16
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.