Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 43, section 1. The text section number identifies this passage in the reader.

Noosa Shire Council – The Noosa Plan
Transport, Roads and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                         ACCEPTABLE OUTCOMES                                        COMMENTS
                                                               S14.2                                                     N/A
                                                               Development in the vicinity of road corridors meets
                                                               the following external design criteria for roads in the
                                                               major road network—
                                                               a)    54dB(A)L10 (18hours) based on predicted traffic
                                                                     volumes ten years hence;
                                                               S14.3                                                     N/A
                                                               Development in the vicinity of rail corridors meets the
                                                               following external design level noise criteria—
                                                               a)      65dB(a), assessed as the 24hour average
                                                                       equivalent continuous A- weighted sound
                                                                       pressure level; and
                                                               b)      87dB(A), assessed as a single event
                                                                       maximum sound pressure level.
  14.149 Staged development
  O15 Staged development is planned, designed and             No solution provided.                                      N/A
  constructed to ensure that—
  a)    each stage of the development can be
        constructed without interruption to services and
        utilities provided to the previous stages;
  b)    the infrastructure provided is capable of servicing
        the entire development; and
  c)    the materials used are consistent throughout the
        development.
  14.150 Alterations to services and utilities




 Solution:   ✓     =   Acceptable Solution
             A/S   =   Alternative Solution
             N/A   =   Not applicable to this proposal


Page 15 of 16
July 2017
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.