Appendix F. Civil Engineering Report Part 2

Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.

of 138

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 54, section 1. The text section number identifies this passage in the reader.

State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality

                           AO10.1
                                                                                       Not applicable.
                           Any non-tidal artificial waterway is designed,              Development does not
                           constructed and managed under the responsibility of         include non-tidal artificial
                           a suitably qualified registered professional engineer,      waterway.
                           Queensland (RPEQ) with specific experience in
                           establishing and managing artificial waterways, and
                                                                                       A010.2 – N/A
                           AO10.2
                           Monitoring and maintenance programs adaptively
                           manage water quality in any non-tidal artificial
                           waterway to achieve relevant water-quality objectives
                           downstream of the waterway, and
                           AO10.3                                                      A010.3 – N/A
                           Aquatic weeds are managed in any non-tidal artificial
                           waterway to achieve a low percentage of coverage of
                           the water surface area (less than 10%). Pests and
                           vectors (such as mosquitoes) are managed through
                           avoiding stagnant water areas, providing for native
                           fish predators, and any other best practices for
                           monitoring and treating pests, and
                           AO10.4                                                      A010.4 – N/A
                           Any non-tidal artificial waterway is managed and
                           operated by a responsible entity under agreement for
                           the life of the waterway. The responsible entity is to
                           implement a deed of agreement for the management
                           and operation of the waterway that:
                           a.    identifies the waterway, and
                           b.    states a period of responsibility for the entity,
                                 and
                           c.    states a process for any transfer of responsibility
                                 for the waterway, and
                           d.    states required actions under the agreement for
                                 monitoring the water quality of the waterway
                                 and receiving waters, and
                           e.    states required actions under the agreement for
                                 maintaining the waterway to achieve the
                                 outcomes of this code and any relevant
                                 conditions of a development approval, and
                           f.    identifies funding sources for the above,
                                 including bonds, headworks charges or levies.




Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 5
Log in to download the original file

Appendix F. Civil Engineering Report Part 2.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.