Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 54, section 1. The text section number identifies this passage in the reader.
State Planning Policy (April 2016)
Appendix 3, SPP Code: Water Quality
AO10.1
Not applicable.
Any non-tidal artificial waterway is designed, Development does not
constructed and managed under the responsibility of include non-tidal artificial
a suitably qualified registered professional engineer, waterway.
Queensland (RPEQ) with specific experience in
establishing and managing artificial waterways, and
A010.2 – N/A
AO10.2
Monitoring and maintenance programs adaptively
manage water quality in any non-tidal artificial
waterway to achieve relevant water-quality objectives
downstream of the waterway, and
AO10.3 A010.3 – N/A
Aquatic weeds are managed in any non-tidal artificial
waterway to achieve a low percentage of coverage of
the water surface area (less than 10%). Pests and
vectors (such as mosquitoes) are managed through
avoiding stagnant water areas, providing for native
fish predators, and any other best practices for
monitoring and treating pests, and
AO10.4 A010.4 – N/A
Any non-tidal artificial waterway is managed and
operated by a responsible entity under agreement for
the life of the waterway. The responsible entity is to
implement a deed of agreement for the management
and operation of the waterway that:
a. identifies the waterway, and
b. states a period of responsibility for the entity,
and
c. states a process for any transfer of responsibility
for the waterway, and
d. states required actions under the agreement for
monitoring the water quality of the waterway
and receiving waters, and
e. states required actions under the agreement for
maintaining the waterway to achieve the
outcomes of this code and any relevant
conditions of a development approval, and
f. identifies funding sources for the above,
including bonds, headworks charges or levies.
Project Address – Project Description
ADG Engineers Aust. Pty Ltd
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.