Original source · versioned page text
Appendix F. Civil Engineering Report Part 2
Attached to the e-mail Retail Bus Type 5 & Type 2 & Op Works -Civil Eng Report Pt 2 MCU17/0572 & OPW17/0611.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 72, section 1. The text section number identifies this passage in the reader.
MAINTENANCE SERVICE LEDGER
MODEL No
INSTALLATION ADDRESS
INITIAL OPERATING DATE
WORKING CAPACITY
PRIMARY CHAMBER SPILL CAPACITY
OIL ALERT PROBE trigger threshold
MINUMUM MAINTENANCE ANNUALLY from the initial operational date or if
FREQUENCIES indicated by the oil alert probe alarm
Note: Oil Alert Probe alarm is triggered when fuel/oil hydrocarbons reaches 10% of primary chamber
capacity.
MAINTENANCE RECORD
PRIMARY SECONDARY
OIL ALERT
CHAMBER CHAMBER
PROBE
SERVICE COALESCER SEDIMENT SEDIMENT SERVICE MANAGER
CLEANED &
DATE FLUSHED REMOVED & REMOVED & NAME & SIGNATURE
ALARM
HYDROCARBONS HYDROCARBONS
CHECKED
SKIMMED SKIMMED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.