Skip to the record
The only place to find full transcripts.

Council archive · source document

35484 Approved Plans Ba · MCU21/0222.01

of 105

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (18.3 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 91, section 1. The text section number identifies this passage in the reader.

     0008783052-01 NatHERS Certificate                      6.1 Star Rating as of 24 Jul 2023



                                Construction                                     Bulk insulation R-value          Reflective
      Location
                                material/type                                    (may include edge batt values)   wrap*

      Guest                      Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Guest                      Concrete Above Plasterboard                     No Insulation                    No

      Pdr                        Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Pdr                        Concrete Above Plasterboard                     No Insulation                    No

      Store                      Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Store                      Concrete Above Plasterboard                     No Insulation                    No

      Lift                       Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Lift                       Concrete Above Plasterboard                     No Insulation                    No

      Garage                     Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Garage                     Concrete Above Plasterboard                     No Insulation                    No

      Entry                      Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Entry                      Concrete Above Plasterboard                     No Insulation                    No

      Lift                       Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Lift                       Concrete Above Plasterboard                     No Insulation                    No

      Bedroom 2                  Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Bedroom 2                  Concrete Above Plasterboard                     No Insulation                    No

      Robe2                      Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Robe2                      Concrete Above Plasterboard                     No Insulation                    No

      Ens2                       Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Ens2                       Concrete Above Plasterboard                     No Insulation                    No

      Bedroom 3                  Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Bedroom 3                  Concrete Above Plasterboard                     No Insulation                    No

      Ens3                       Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Ens3                       Concrete Above Plasterboard                     No Insulation                    No

      Robe3                      Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Robe3                      Concrete Above Plasterboard                     No Insulation                    No

      Ens Guest                  Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Robe Guest                 Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Guest                      Concrete, Plasterboard                          Bulk Insulation R2.5             No

      Kitchen/Living/            Concrete, Plasterboard                          Bulk Insulation R2.5             No



* Refer to glossary.                                                                                                       Page 11 of 15
Generated on 24 Jul 2023 using BERS Pro v4.4.1.5 (3.21) for David Low Way , Sunrise Beach , QLD , 4567

Used in these records

About this file

File size
18.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

35484 APPROVED PLANS BA.pdf · 18.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.