Council archive · source document
SUPERSEDED - Decision Notice - Concurrence Agency - EPA [As Published] · 142008.383
2008/383
Plan / Rev. Plan / Document Name Date
Document No.
33020-0-01 D Pump Station G.A. Sh 1 of 2 4 August 2008
33020-0-02 C Pump Station Elevations. Sh 2 of 2 4 August 2008
33020-0-03 D Pump Station Site Plan 2 August 2008
33020-0-04 C Sea Water Supply Pump Station G.A. 3 August 2008
33020-0-05 B Sea Water System Site Plan 3 March 2008
33020-8-01 E Transfer Pipeline Alignment 2 August 2008
and as may be amended by these conditions.
2. Suitable signage shall be placed at the perimeter of the work areas advising that the area is
not accessible for members of the public. The signs shall be placed prior to construction works
commencing and permanently affixed to the inlet jetty and pump station upon completion of
the works. The design of the signs shall be approved by Council’s Manager – Works Planning
prior to the erection of the signs.
3. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
4. The clearing or disturbance of existing vegetation shall be limited to the proposed works area
and any necessary access ways extending from the existing road formation to the works area.
5. Any areas of removed or disturbed vegetation remaining after the works shall be replaced with
suitable local native vegetation approved by Council. The revegetation shall be carried out in
accordance with Council’s Planning Scheme Policy No 3 Landscaping Plants & Guidelines.
6. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
7. Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council stating that the works have been constructed in accordance with best practice
methods, is in accordance with Coastal Protection and Management Act 1995 (specifically the
engineering previsions of the Coastal Protection and Other Legislation Amendment Regulation
(No.1) 2005, Schedule 4A – IDAS Code for development applications for prescribed tidal
work) and is structurally sound.
8. This approval or its conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work. Furthermore, the
approval does not warrant that associated plans and specifications have been checked in
detail, nor does it absolve the owner of the land from complying with all the conditions of this
approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
statutory regulations in the execution and/or performance of the works. The Council does not
accept any responsibility for the accuracy of any plans and specifications as approved.
9. The Development Permit for a Operational Works lapses if the use has not happened by 9
January 2011, unless an application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Page 2 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - Concurrence Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 494 KB (small file)
- File type
No other editions are linked here.