Attachment B - Code Compliance Assessment
Earthworks and Drainage Table 6.4.2.3 Criteria for assessment
Performance outcomes Acceptable Outcomes Comments
Earthworks and Drainage
PO54 AO54 Not applicable.
Filling, excavation and retaining structures Filling and excavation works are designed Not earthworks or drainage works are
do not directly, indirectly or cumulatively and constructed to ensure overland flow proposed.
cause adverse impacts external to the and/or flooding is not worsened, impeded,
development site by: or otherwise diverted to adversely affect
other properties or downstream
1. causing ponding of water on environments.
the site or nearby land;
2. causing erosion or the transport
of sediment off the site;
3. increasing flooding, which
adversely affects the safety or
use of any land upstream and
downstream; or adversely
affecting the flow of water in
any overland flow path.
Pedestrian and Cycling Connectivity Table 6.4.2.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes Comments
Pedestrian and Cycling Connectivity
PO55 Complies with Performance Outcome.
Convenient and legible connections are No acceptable outcome provided
Urban Planners Queensland
[email protected] | upqld.com.au | (07) 3106 3221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.