Appendix C - Stormwater Management Report
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
62 Gateway Drive, Noosaville 20210216 Richard Klinge Stormwater Management Plan February 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 16 (of 20)
Section 2
Document control record
Document prepared by:
RECOR Pty Ltd
ABN 89 647 469 707
37 Mary Street
Noosaville, QLD 4566
Australia
T +61 7 5211 1003
E [email protected]
W recorconsulting.com
A person using RECOR documents or data accepts the risk of:
a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard
copy version.
b) Using the documents or data for any purpose not agreed to in writing by RECOR.
Document control
Report title Stormwater Management Plan
Document code 20210216-SWMP01 Project number 20210216
File path C:\12dS\data\RecorSYN\20210216 Gateway Dr_337\03 Engineering\00
Report\Stormwater\RECOR Preliminary Stormwater Management Report - 20210216.docx
Client Richard Klinge
Client contact - Client reference -
Rev Date Revision details/status Author Reviewer Verifier Approver
(if required)
0 01/02/2022 Initial Version B. Parry N. Wagstaff
Current revision 0
Approval
Author signature Approver signature
Name B. Parry Name
Title Civil Engineer Title
recorconsulting.com
A 37 Mary St, Noosaville Qld 4566 E [email protected]
P +61 7 5211 1003
Section 3
Contents
Introduction..........................................................................................................................................4
Site Details ...........................................................................................................................................5
2.1. Existing Site Description ...................................................................................................................... 5
2.2. Existing Drainage Patterns .................................................................................................................. 5
2.3. Proposed Development Drainage Pattern ......................................................................................... 6
2.4. Flood Considerations ........................................................................................................................... 7
2.5. Acid Sulphate Soils .............................................................................................................................. 7
Stormwater Management .....................................................................................................................9
3.1. Operational Stormwater Management ................................................................................................ 9
3.2. Construction Stormwater Management .............................................................................................. 9
Conclusion ........................................................................................................................................ 11
Appendices
Appendix A
Proposed Concept Plans
Project number 20210216
File RECOR Preliminary Stormwater Management Report - 20210216.docx, Revision 0 2022-02-01
recorconsulting.com
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected]
Section 4
INTRODUCTION
RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for an industrial units Development consisting of 9 tenancies within the Gateway Drive industrial area.
This report investigates the stormwater management considerations for the existing and proposed development
site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council
requirements for stormwater drainage.
This document has been prepared with consideration for the following specifications, guidelines and reports:
• Noosa Plan 2020
• Water Sensitive Urban Design Technical Guidelines for Southeast Queensland
• State Planning Policy 2017
• Queensland Urban Drainage Manual (QUDM)
• International Erosion Control Association (IECA) Best Practice Erosion and Sediment Control document
• Proposed Industrial Development Venture Drive, Noosa – Stormwater Management Strategy, prepared by
Cardno Lawson Treloar (15/02/08) for RAL2007/165 & OPW2008/0658
Project number 20210216 Page 4 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 5
SITE DETAILS
2.1. Existing Site Description
The existing site is known in real property terms as Lot 12 SP 216079, located at 62 Gateway Drive, Noosaville, within
the Venture Drive Enterprise Precinct. The existing site is undeveloped land covering an area of 2447m², with
surrounding land use consisting of industrial developments. A locality plan of the proposed site is presented in
Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2021).
Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2021)
2.2. Existing Drainage Patterns
The existing site is undeveloped with drainage as overland flows following the natural surface contours towards the
north-eastern corner of the site and the adjacent properties. The subject land falls typically towards the north-eastern
property boundary, with typical slopes of between 1% to 2% across the site, however at the time of survey an east-
west contour bund traversed the site possibly due to construction works occurring on the adjacent lot to the north.
There are no upstream catchments which are expected to drain into the site. The verge falls towards the kerb, and
run-off from the adjacent Lot 13 SP 216079 is managed as part of the development approved under OPW20/0210.
The site has an existing field inlet pit located at the north-eastern corner of the site providing connection to the
bioretention and detention treatment area located in the adjacent lot 100 SP 216079 to the east. This connection
Project number 20210216 Page 5 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 6
point was established as part of the stormwater management strategy established for the site as part of previous
applications RAL2007/165 and OPW2008/0658.
Figure 2.2 - Site Surrounds (Noosa Council Intramaps, 2021)
2.3. Proposed Development Drainage Pattern
2.3.1 Stormwater Concept
The development of the site has been accounted for in the master stormwater management strategy prepared for
the subdivision creating the subject lot by Cardno Lawson Treloar (15/02/08). Run-off from the site is to be conveyed
through piped drainage towards Lot 100 SP 216079, where a large bioretention basin and detention area will
provide the required treatment and attenuation of site run-off. The existing interallotment drainage point at the
north-eastern corner of the site will be the legal point of discharge for the development.
Driveways will be graded to fall towards the north of the site, entering the landscaped area along the northern
boundary as sheet flows. Inlet pits within the landscaping area will capture excess run-off from the surface, which is
conveyed by stormwater pipes to the existing inlet pit.
Roof water from the new buildings is to be drained via downpipes with outlet connections directly draining into the
proposed inlet pits.
The roof and allotment drainage system for the proposed site shall be designed to comply with:
1. Noosa Shire Council Planning Scheme Policy (PSP) 6 - Engineering Design Standards;
2. The Queensland Urban Drainage Manual (QUDM); and
3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.
Project number 20210216 Page 6 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 7
Refer to Appendix A Proposed Concept Plan for the proposed stormwater drainage layout plan illustrating the
concept described above.
2.3.2 Stormwater Catchments
A schematic layout plan of the proposed development and its drainage catchments as described in the previous
sections is shown below in Figure 2.3 – Proposed Catchments Plan.
Figure 2.3 – Proposed Catchments Plan
2.4. Flood Considerations
Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has identified that
the site is located outside of any flood or inundation areas within the locality indicating it is not expected that that
the proposed development will be subject to flooding.
2.5. Acid Sulphate Soils
The site is within the Land Subject to Acid Sulphate Soils (ASS) overlay on the Noosa Shire Council Intramaps service,
being within Area 1 (above 5.0m to 20.0m Australian Height Datum (AHD)). Survey indicates that the site’s low point
is at 5.38m AHD at the north-eastern corner of the site.
ASS management would typically be required at elevations below 5.0m, or where excavation volumes below 5.0m
AHD exceed 100m³. A preliminary estimate of the excavation requirements below 5.0m would include stormwater
drainage connecting to an existing IL of 4.89, and building footings near existing sewer services that would need to
be founded below the critical depth line, therefore disturbed volumes below 5.0m are likely to pose a low risk of
disturbing ASS containing soils or groundwater. It is not anticipated that an acid sulphate soil management plan will
be required for the proposed development.
Project number 20210216 Page 7 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 8
The requirements for acid sulphate testing shall be confirmed by a geotechnical engineer prior to the detailed design stage of this proposed development. Should acid sulphate soils be identified during construction or preliminary site investigations, a geotechnical engineer should be consulted for further guidance. Project number 20210216 Page 8 of 13 File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01 Revision 0 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 9
STORMWATER MANAGEMENT
3.1. Operational Stormwater Management
In the report Proposed Industrial Development Venture Drive, Noosa – Stormwater Management Strategy prepared
by Cardno Lawson Treloar (15/02/08) for RAL2007/165 & OPW2008/0658, the fully developed site has been
accounted for in the sizing of the end of line detention basin and bioretention basin located in Lot 100 SP 216079.
In accordance with this approval, no additional treatment or attenuation is required within the site to achieve the
stormwater objectives required of the proposed development.
3.2. Construction Stormwater Management
3.2.1 Erosion and Sediment Control Measures
During construction, it is necessary to manage stormwater run-off to avoid potential contamination of the
downstream bioretention area, with management of suspended solids the key consideration to minimise clogging
of the filtration media.
Best practice erosion and sediment controls shall be installed to minimise the discharge of potential contaminants
from the site, in accordance with the objectives of Appendix 2 of the SPP (DERM, July 2017), which are shown below
in Figure 3.1.
Figure 3.1 SPP 2017 Construction Phase Stormwater Management Design Objectives
A site-specific erosion and sediment control plan shall be prepared as part of a future submission for Operational
Works approval. Suitable erosion and sediment controls for the site include:
Project number 20210216 Page 9 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 10
1. Sediment fencing downstream of the work areas within the site to prevent sediment from leaving the
disturbed construction area.
2. A shakedown entry installed at the access to the proposed development area to minimise sediment being
transported to and from the site.
3. Providing sediment traps and fabric filters to existing inlet pits to prevent sediment entering the downstream
network.
4. Ensuring any stockpiles and construction materials are contained with an upstream berm to divert surface
flows and sediment fencing downstream of these areas.
5. Ensuring any loose material tracked onto roads by construction vehicles is swept and removed from the road
before the end of the day.
Project number 20210216 Page 10 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 11
CONCLUSION
This Concept Stormwater Management Report has outlined how the stormwater run-off from the site is to be
managed to comply with the relevant requirements to minimise any adverse impacts to the downstream catchments.
• The legal point of discharge for the proposed development is the existing inlet at the north-eastern corner
of the site.
• Both stormwater quality and quantity for the operational phase of the proposed development have
previously been managed as part of the subdivision creating the individual lots (RAL2007/165). The existing
end of line treatment including detention basin and bioretention basin achieve the stormwater objectives
for the proposed development, therefore no additional management is required for the proposed
development.
• During construction, erosion and sediment control measures in accordance with best practice standards are
to be implemented to minimise potential contaminants impacting the downstream receiving environment.
An erosion and sediment control plan shall be developed as part of a submission for Operational Works
approvals.
• The proposed stormwater solution is considered to minimise any adverse impacts to the downstream
environment arising from the stormwater run-off while also meeting the stormwater quality targets required
for the development.
Project number 20210216 Page 11 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 12
Appendix A Proposed Concept Plans Project number 20210216 Page 12 of 13 File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01 Revision 0 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
Section 13
MCU
NOT FOR CONSTRUCTION
INDUSTRIAL UNIT DEVELOPMENT
NOOSAVILLE
62 GATEWAY DRIVE, NOOSAVILLE, QLD 4566
Lot 12 SP 216079
CIVIL WORKS
NOTE: VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS,
THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A WORKS CAN COMMENCE.
MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS
CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS OTHERWISE
ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO THE
13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS. SUBJECT SITE
SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH
14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR. OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION.
a. PRESTART 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS
b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION COMMENCING ON SITE.
CONTROL MEASURES UNSUITABLE GROUND 16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND
c. SIDE AND CUT OFF DRAINS SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL 17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE
f. STORMWATER STRUCTURE BASE SLABS APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS
g. SEWER RETICULATION AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE
h. WATER RETICULATION OR REMOVE FROM SITE AS DIRECTED.
i. PAVEMENT SUBGRADE 19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
j. PAVEMENT REINFORCING CONSULTANTS/CONTRACTORS DRAWINGS:
k. PAVEMENT PRIOR TO SEALING (PRESEAL) SURVEYOR: LAND SURVEYING DYNAMICS
l. RETAINING WALL FOOTING REINFORCING ARCHITECT: SPROUT ARCHITECTS
m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL HYDRAULICS: TBA
n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES STRUCTURAL: RECOR
o. PRACTICAL COMPLETION LANDSCAPE: TBA
p. ON MAINTENANCE 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD
OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL
q. OFF MAINTENANCE ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH
r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT IMPLEMENTATION OF THE TMP.
APPROVAL) 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY APPROVALS
s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE RELEVANT TO THEIR RECEIVED FOR THE PROJECT
CERTIFICATION SCHEME 22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW APPROVALS BY
COUNCIL. 1/02/2022
GENERAL NOTES 23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY WITHOUT
EA ID: 2557785
FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT RPEQ: 26443
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR 24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND
DO NOT SCALE, IF IN DOUBT ASK!
TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS. APPROVALS ON SITE AT ALL TIMES. LOCALITY PLAN
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND 25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE NOT TO SCALE
WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013).
SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES,
ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE
TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY
ADDITIONAL COSTS INCURRED BY RECOR.
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR
ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE
PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE DRAWING SCHEDULE Rev Date Description By Chk
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND
LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY DRAWING NUMBER DRAWING TITLE REVISION
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO C01 COVER SHEET AND LOCALITY PLAN A
LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL
C10 EXISTING SITE SERVICES PLAN A
CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS C20 STORMWATER CATCHMENTS PLAN A [email protected]
INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF
CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR C30 ROADS AND DRAINAGE PLAN A 37 MARY ST NOOSAVILLE, QLD
AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS. 07 5211 1003
C31 DRIVEWAY SECTIONS A
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE Client
RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS, RICHARD KLINGE
GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. Project Name
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO INDUSTRIAL UNITS DEVELOPMENT
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE 62 GATEWAY DRIVE
CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE NOOSAVILLE
OWNER/MANAGER / AUTHORITY/COUNCIL.
Title
9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE COVER SHEET AND LOCALITY PLAN
HEALTH AND SAFETY REQUIREMENTS.
10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY TO
NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY
OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW
Project No. Discipline Status
20210216 CIVIL PRELIMINARY
Designed By Drawn By Scale
BRP BRP NTS (at A3)
Drawing No. Revision
C01 1
Section 14
MCU
NOT FOR CONSTRUCTION
SW EXISTING STORMWATER PIPE
EXISTING STORMWATER PIT
13 S
EXISTING SEWER MAIN
SP170295
210218339
5.490
KB06 210218338
5.377 210218337
KI06 5.339
CO06
T EXISTING TELECOMMUNICATIONS
210218333
5.628
210218332KB06.F
5.512
KI06.F
210218331
5.495
CO06.F
210218341 210218340
EXISTING WATER MAIN
5.609 5.586
SI01 SI01
210218334
W
NO
5.608
CONTRACTOR TO EXCAVATE AND LOCATE EXISTING
KB06
210218335
5.504
KI06
RT
EXISTING ELECTRICAL
210218336
5.463
CO06
WATER AND ELECTRICAL CONNECTIONS AND E
H
TEMPORARY FENCING
W
PROTECT DURING CONSTRUCTION WORK
210218109
5.205
ASSOCIATED WITH DEVELOPMENT EARTHEN CONTOUR BUND ASSUMED TO
BE ASSOCIATED WITH DEVELOPMENT OF
KL01.F
OF ADJACENT PROPERTY
210218108
5.171 210218107 210218124
KI01.F5.316 5.751
KB01.F WUG01
ADJACENT PROPERTY
SV
W
210218119
5.512
SV
SV
210218120
5.434
SV
GATEWAY DRIVE
210218106
5.433
CO02.F CO01
210218123
5.675
WUG01
210218121
5.742
210218122 OP
5.493
CO01.F
SL 5.45
210218304
5.528
210218307
TRW01
5.534 210218305
FE01 5.026
210218286 BRW01
210218330 5.472
5.538 FE02-TEMP
CR01
// SW SW SW SW SW
210218114
5.517
IL 4.89
WUG-PIPE
210218115
210218118 5.557
5.636 WUG-PIPE
COND-ORANGE 210218116
5.563
COND
//
210218105
5.737
// //
ONIK
// // // // // // // //
210218306
// // //
T
5.382
// // //
FE02
//
E // //
//
// // // // // // //
SW
W
210218287
6.012
FE02-TEMP
E
210218104
5.816
ONIC
//
T
6.0
210218110
W
5.355 210218111
KL01 5.333 210218112 210218128
KI01 5.485 5.562
SW
CO01
KB01
210218113
5.517
CO02
E
210218272
5.514
TRW01
//
T
W
DEMOLISH AND REMOVE EXISTING
SW
210218329
5.609
CR01
E
//
FOOTPATH AND BARRIER
6.0 KERB AT
LOCATION OF NEW DRIVEWAY CROSSOVER
T
W
210218102
5.584
OSIK
E
//
210218130 210218129
5.609 5.649
CO02.L CO01.L
SW
SL 5.62
12 100
210218140 210218131
210218139
5.485 5.459 5.609
KL01.L KI01.L KB01.L
210218132
210218142 210218133
5.608
T
5.426 KB01 5.621
KI01 KB01
9
210218271
5.523
SW
SP21607
TRW01
210218270
5.027
BRW01
//
IL 3.52
SP216079
W
E
210218143
5.430 210218135 210218134
KI01 5.620 5.636
KB01 KB01
210218141 210218144
210218136
5.510 5.482 5.628
KL01 KI01 KB01
//
T
W
E
210218149
210218148 5.754
5.725 CO01
//
CO02
T
210218328
5.721
CR01
CONTRACTOR TO EXCAVATE
E
W
AND LOCATE EXISTING SEWER
//
210218269
210218268
5.532 5.078
TRW01 BRW01
CONNECTION AND PROTECT
210218147
210218146
210218145 5.576 5.717
KI01 KB01
T
5.594
KL01
DURING CONSTRUCTION WORK
E
W
//
210218159
5.681
3 ESTATE
TR 0.1 1
T
210218150
5.834
CO01
210218151
5.778
CO02
//
E
W
51 5.53
210218158
IL 4.SL
5.649
3 ESTATE
TR 0.1 1
IL 4.75
IL 3.9
210218160
6.222
COND
SL 5.82 SL 5.61 IL 4.32 210218231
E
5.054
Section 15
210218232
BRW01
5.490
FE01
210218230
5.544
TRW01
210218161 210218255
6.258 5.829
210218157 OP OP
SW SW SW SW SW SW SW
5.646
SW SW SW SW
3 ESTATE
TR 0.1 1
IL 4.32
4
SL 5.89 S IL 4.54 IL 4.27
IL
IL 4.36
E
3.6
T
IL 3.63 S IL 3.56
IL 4.36
3 S S S
IL 4.36
S S S S S
Emt N
W
S S S S S
3.9 IL 3.86
Emt P
3
IL 6.0
IL 4.62
SL3 5.62
Emt L IL 3.88
3.6
210218327 210218249
5.834 5.811
CR01 IO-CAP
210218228
IL
6.382
210218250 BU.U-COR
210218229
5.812 5.568
BU BU-COR
SW
FFL 6.30
E
T
W
S
6.0
210218153
210218154 210218156
210218152 5.699 5.850 210218155 5.930
5.720 KI01 KB01 5.886 CO01
KL01 CO02
13
SW
SP216079
S
16
SP216079
1/02/2022
15
SP216079
EA ID: 2557785
RPEQ: 26443
DO NOT SCALE, IF IN DOUBT ASK!
NOTE: 6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED AND REMOVED
FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY OTHERS) OR Rev Date Description By Chk
1. FOR GENERAL NOTES REFER DWG No. C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER.
TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE NOTE:
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO DEMOLITION WORKS BEGINNING. EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL
SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT
CONTRACT. 8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS, ELECTRICAL
CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED FROM
3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD AND COUNCIL CAN COMMENCE. SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL
RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL LOCATION AND NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES.
9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND SERVICES TO BE CAPPED IN ACCORDANCE WITH RELEVANT SERVICE [email protected]
DEPTH PRIOR TO CARRYING OUT ANY EXCAVATION OR TRENCHING WORKS.
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE. PROVIDER SPECIFICATIONS AND STANDARD DETAILS 37 MARY ST NOOSAVILLE, QLD
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE PRIOR TO
COMMENCEMENT OF WORKS. 10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND SERVICES 07 5211 1003
WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. Client
5. CONTRACTOR TO ORGANISE ANY REQUIRED DEMOLITION PERMITS PRIOR TO ANY RICHARD KLINGE
DEMOLITION WORKS COMMENCING ON SITE. 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS TO CARRY
OUT SERVICES RELOCATION OR ALTERATIONS. Project Name
INDUSTRIAL UNITS DEVELOPMENT
62 GATEWAY DRIVE
NOOSAVILLE
Title
EXISTING SERVICES PLAN
Project No. Discipline Status
20210216 CIVIL PRELIMINARY
Designed By Drawn By Scale
BRP BRP 1:400 (at A3)
Drawing No. Revision
C10 1
Section 16
MCU
NOT FOR CONSTRUCTION
IMPERVIOUS GROUND
PERVIOUS GROUND
DRIVEWAY SURFACE
IMPERVIOUS ROOF
CATCHMENT D
CATCHMENT B CATCHMENT C IMPERVIOUS GROUND: 0M²
DRIVEWAY SURFACE: 145M² CATCHMENT BOUNDARY
IMPERVIOUS GROUND: 16M²
IMPERVIOUS GROUND: 0M² IMPERVIOUS ROOF: 0M²
DRIVEWAY SURFACE: 373M²
DRIVEWAY SURFACE: 324M² PERVIOUS GROUND: 39M²
IMPERVIOUS ROOF: 0M²
NO
IMPERVIOUS ROOF: 0M² TOTAL: 184M²
RT
PERVIOUS GROUND: 80M²
H
PERVIOUS GROUND: 67M²
TOTAL: 469M²
W
CATCHMENT A TOTAL: 391M² CATCHMENT FLOW DIRECTION
IMPERVIOUS GROUND: 4M² SV
W
DRIVEWAY SURFACE: 36M² SV
IMPERVIOUS ROOF: 0M²
PERVIOUS GROUND: 123M²
TOTAL: 163M² SW SW SW SW SW
SW
T
E
SW
W
SW
SW SW SW SW SW
E
5.4m
T
W
13410
SW
E
SW
2.5m
1:80
1:20
T
1:40
1:60
W
SW
E
6.2m
T
SW
W
E
SW
T
SW
W
E
SW
T
W
E
SW
T
E
W
5000
T
E
SW
W
1/02/2022
T
EA ID: 2557785
E
RPEQ: 26443
W
SW SW SW SW SW SW SW
E
SW SW SW SW SW SW SW SW SW SW SW
DO NOT SCALE, IF IN DOUBT ASK!
S
E
T
S S S S S S S S S
W
S S S S S
SW
E
T
W
S
CATCHMENT E
SW
COURTYARD
S
IMPERVIOUS GROUND: 0M²
IMPERVIOUS GROUND: 7M²
DRIVEWAY SURFACE: 0M²
IMPERVIOUS ROOF: 561M²
DRIVEWAY SURFACE: 0M²
IMPERVIOUS ROOF: 0M²
CATCHMENT F
PERVIOUS GROUND: 0M² IMPERVIOUS GROUND: 0M² Rev Date Description By Chk
PERVIOUS GROUND: 3M²
TOTAL: 561M² DRIVEWAY SURFACE: 0M²
TOTAL: 10M²
IMPERVIOUS ROOF: 609M²
PERVIOUS GROUND: 0M²
TOTAL: 609M²
[email protected]
37 MARY ST NOOSAVILLE, QLD
07 5211 1003
Client
RICHARD KLINGE
Project Name
INDUSTRIAL UNITS DEVELOPMENT
62 GATEWAY DRIVE
NOOSAVILLE
Title
CATCHMENT PLAN
Project No. Discipline Status
20210216 CIVIL PRELIMINARY
Designed By Drawn By Scale
BRP BRP 1:400 (at A3)
Drawing No. Revision
C20 1
The text continues on section 17.