Appendix C - Stormwater Management Report
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
INTRODUCTION
RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application
for an industrial units Development consisting of 9 tenancies within the Gateway Drive industrial area.
This report investigates the stormwater management considerations for the existing and proposed development
site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council
requirements for stormwater drainage.
This document has been prepared with consideration for the following specifications, guidelines and reports:
• Noosa Plan 2020
• Water Sensitive Urban Design Technical Guidelines for Southeast Queensland
• State Planning Policy 2017
• Queensland Urban Drainage Manual (QUDM)
• International Erosion Control Association (IECA) Best Practice Erosion and Sediment Control document
• Proposed Industrial Development Venture Drive, Noosa – Stormwater Management Strategy, prepared by
Cardno Lawson Treloar (15/02/08) for RAL2007/165 & OPW2008/0658
Project number 20210216 Page 4 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.