Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix C - Stormwater Management Report

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

The requirements for acid sulphate testing shall be confirmed by a geotechnical engineer prior to the detailed
design stage of this proposed development. Should acid sulphate soils be identified during construction or
preliminary site investigations, a geotechnical engineer should be consulted for further guidance.




Project number 20210216                                                                                        Page 8 of 13
File RECOR Preliminary Stormwater Management Report - 20210216.docx, 2022-02-01
Revision 0
P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com
Log in to download the original file

Appendix C - Stormwater Management Report.pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.