08/0658 - Operational Works - Road and Drainage/S/Wter/Water and Sewerage [As Published] · 142008.658

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

2/04/2008 9:18:06 AM

 

       

 

 

 

 

 

 

 

 

GATEWAY ORIVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GATEWAY ORIVE

 

EUMUND! NOOSA ROAD

LOCALITY PLAN.

 

 

GENERAL NOTES:

1. ALL WORK ON THIS CONTRACT IS TO SE CARRIED OUT IN
ACCORDANCE WITH THE JOB SPECIFICATION AND TO
THE SATISFACTION OF THE LOCAL AUTHORITY AND THE
ENGINEER.

2. THE CONTRACTOR IS TO CONTACT ENERGEX, TELSTRA,
COUNCIL AND OTHER SERVICE AUTHORITIES AND
LOCATE EXISTING UNDERGROUND SERVICES PRIOR TO.
CONSTRUCTION,

3. CONDUIT LOCATIONS IF SHOWN ON THE PLANS ARE
PROVISIONAL ONLY AND THE CONTRACTOR IS TO LIAISE
WITH THE ENGINEER, TELSTRA AND THE ELECTRICAL
CONSULTANT FOR THEIR FINAL PLANS (MMEDIATELY
PRIOR TO LAYING ROAD AND FOOTPATH CONDUITS.

4. THE ENGINEERING DESIGN IS BASED PARTLY ON A DATA
TERRAIN MODEL COMPUTER GENERATED FROM THE
SITE SURVEY AND SOME ELEMENTS OF THE SURVEY
DATA ARE INTERPOLATED AND MAY VARY FROM THE
ACTUAL SITE CONDITIONS. THE CONTRACTOR SHALL
LIAISE WITH THE ENGINEER AND SURVEYOR ANDO SET
(OUT THE WORKS ONLY FROM APPROVED REFERENCE
PEGS AND LEVEL BENCH MARKS.

5. THE CONTRACTOR IS TO ORGANISE HIS WORKS SO THAT
EROSION, DEPOSITION OF SILT, AND STORMWATER
RUNOFF FROM THE JOB SITE DOES NOT EXCEED THE
PRE CONSTRUCTION RATES AT ANY POINT AS A RESULT
OF HIS ACTIONS.

6. CLEAR ALL VEGETATION FROM THOSE AREAS TO BE
EXCAVATED OR FILLED. IN OTHER AREAS WHERE
CLEARING IS SPECIFIED, SELECTED CLEARING ONLY IS
TO BE CARRIED OUT BY RETAINING THOSE TREES
MARKED BY THE ENGINEER AND LEAVING THE AREA IN
ACONDITION SUITABLE FOR SLASHING.

7, THE CONTRACTOR |S TO PRESENT UP THE JOB FOR ON-
MAINTENANCE AND OFF-MAINTENANCE INSPECTIONS:
WHEN DIRECTED SY THE ENGINEER WITH ALL PIPES,
ROADS AND ALLOTMENTS FREE OF RUBBISH OR SILT
AND WITH FOOTPATHS AND PARK AREA SLASHED OR
MOWN, AND UNDERGROUND SERVICES OPENED FOR
INSPECTION.

8. NO WORK IS TO COMMENCE ON THE SITE UNTIL THE
APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN
WRITING AND AN OFFICIAL PRE-START MEETING WITH A
REPRESENTATIVE OF COUNCIL AND THE ENGINEER
HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN A
COPY OF THE MINUTES OF THE PRE-START MEETING
AND SHALL COMPLY WITH ALL REQUIREMENTS
THEREOF.

, ALL CONSTRUCTION 1S TO BE SET OUT BY THE
CONTRACTOR FROM PEGGING OF ROAD CENTERLINE,
MANHOLE POSITIONS, LOT STAKING AND T6Ms PROVIDED
BY THE PRINCIPAL'S LICENSED SURVEYOR.

 

 

 

 

EARTHWORKS NOTES

4. CLEAR ALL VEGETATION FROM THOSE AREAS TO BE EXCAVATED OR FILLED. ALL
RUBBISH INCLUDING DEBRIS FROM CLEARING IS TO BE DISPOSED IN ACCORDANCE
WITH THE STANDARDS OF THE LOCAL AUTHORITY. BURNING WILL NOT BE ALLOWED.

2. ALL ORGANIC MATERIAL, TOPSOIL, AND UNSUITABLE SUBGRADES ARE TO BE
STRIPPED FROM THE AREA TO BE FILLED AND REMOVED FROM THE SITE EXCEPT
THAT SUFFICIENT TOPSOIL IS TO BE RETAINED FOR RESPREADING TO A MINIMUM
DEPTH OF 100mm ALL OVER THE SITE AFTER FILLING TO LEVEL WITH IMPORTED FiLL.
AFTER STRIPPING AS ABOVE THE WHOLE SITE IS TO BE COMPACTED AND PROOF
ROLLED TO THE SATISFACTION OF THE GEOTECHNICAL CONSULTANT PRIOR TO
PLACING OF IMPORTED FILL.

3. FILLING [S TO BE CARRIED OUT IN CONTROLLED LAYERS NOT TO EXCEED 200mm
DEPTH BY 2500 m?. EACH LAYER |S TO BE COMPLETELY COMPACTED TO A MINIMUM.
OF 95% RELATIVE ORY DENSITY FOR COHESIVE SOILS OR A MINIMUM DENSITY INDEX
OF 70% FOR NON-COHESIVE SOILS AND TESTED AND APPROVED BY THE
GEOTECHNICAL CONSULTANT PRIOR TO THE PLACEMENT OF THE NEXT LAYER. THE
TOP 300mm OF THE ROAD SUBGRADE 1S TO BE COMPACTED TO A MINIMUM OF 88%
RELATIVE DRY DENSITY.

4, THE WHOLE OF THE MATERIAL IN ANY PARTICULAR LAYER SHOULD BE HOMOGENOUS,
AND IF NECESSARY SMALL QUANTITIES OF FILL OIFFERING FROM THE REST SHOULD
BE SPREAD AS A THIN LAYER OVER THE WHOLE SITE AND INCORPORATED INTOA
FULL LAYER. IN A CUT/FILL SITUATION THE GEOTECHNICAL CONSULTANT MAY DIRECT
THAT ANY EXISTING SOIL WITHIN 600mm OF THE FINISHED SURFACE LEVEL BE
REMOVED AND REPLACED WITH FILL EQUIVALENT TO THE GENERAL FILL MATERIAL
THE MATERIAL SO REMOVED MAY, IF 1T OTHERWISE MEETS THE SPECIFICATION, BE
USED AS GENERAL FILL AS ABOVE.

8. IMPORTED FILL tN ALLOTMENTS IS TO CONSIST OF HOMOGENOUS MATERIAL
CONTINUOUSLY GRADED WITH A MAXIMUM PARTICLE SIZE OF 100mm, A MAXIMUM
LINEAR SHRINKAGE OF 8%, AND A MOISTURE CONTENT BETWEEN -2% TO +2% OF
OPTIMUM MOISTURE CONTENT AT THE TIME OF COMPACTION. IMPORTED FILL IN
ROADWAYS IS TO CONS{ST OF HOMOGENOUS MATERIAL CONTINUOUSLY GRADED
WITH A MAXIMUM PARTICLE SIZE OF 100mm, A MINIMUM CBR OF 8, AND A MOISTURE
CONTENT BETWEEN -2% TO +2% OF OPTIMUM MOISTURE CONTENT AT THE TIME OF
COMPACTION,

6. THE CONTRACTOR SHALL ENSURE THAT ALL WORK IS CARRIED OUT, TESTED AND
CERTIFIED AS CONTROLLED FILL IN COMPLIANCE WITH AS.3798 "GUIDELINE ON
EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS”. ALL TESTING
AND INSPECTIONS ARE TO BE CARRIED OUT BY A NATA CERTIFIED LABORATORY
APPOINTED BY THE GEOTECHNICAL CONSULTANT IN ACCORDANCE WITH LEVEL TWO
TESTING AS SET OUT IN APPENDIX B OF AS.3798. THE CONTRACTOR SHALL PROVIDE
CERTIFICATION TO THE ENGINEER ON COMPLETION OF THE EARTHWORKS.

7. ALL “UNCONTROLLED FILL" IDENTIFIED ON SITE TO BE REMOVED TO NATURAL
SURFACE LEVEL AND, IF SUITABLE, REUSED AND PLACED AS SPECIFIED ABOVE.

 

 

 

 

DRAWING SCHEDULE

 

 

DWG No
06583-1
06583-2
06583-3
08583-4
06683-5
06583-6
06583-7

 

DESCRIPTION DWG No
COVER SHEET AND SITE PLAN 96583-18
ROADWORKS ALIGNMENT PLAN . 6583-19
EARTHWORKS LAYOUT PLAN 06583-20
EARTHWORKS CROSS SECTIONS 06583-21
ROADWORKS AND STORMWATER DRAINAGE LAYOUT PLAN 06583-SE1
LONGITUDINAL SECTION VENTURE DRIVE 08583-SE2
CROSS SECTIONS VENTURE DRIVE

DESCRIPTION

SEWERAGE RETICULATION LAYOUT PLAN

SEWERAGE RETICULATION LONGITUDINAL SECTIONS LINES NV33/08, 12, 13 & 14
SEWERAGE RETICULATION NOTES

WATER SUPPLY AND PRELIMINARY SERVICES LAYOUT PLAN

SEDIMENT AND EROSION MANAGEMENT PLAN

SEDIMENT AND EROSION MANAGEMENT NOTES AND DETAILS

 

 

 

 

 

 

 

 

 

 

 

 

 

06583-8 LONGITUDINAL SECTION ROAD 1

06583-8 CROSS SECTIONS ROAD 1 CHGE 20 - 168,516

06583-10 CROSS SECTIONS ROAD 1 CHGE 200 - END

06583-11 INTERSECTION AND CUL DE SAC DETAILS

06583-12 STORMWATER DRAINAGE LONGITUDINAL SECTIONS LINES A-K

06583-13 STORMWATER DRAINAGE LONGITUDINAL SECTIONS LINES G - M AND MANHOLE DETAIL

06583-14 RETAINING WALL DETAILS SHEET 1

06583-15 RETAINING WALL DETAILS SHEET 2

06583-16 RETENTION AND BIORETENTION BASIN LAYOUT PLAN

06583-17 RETENTION BASIN DETAILS AND SECTIONS
eer ane | f ORT ORAWING TITLE ASSOCIATED CONSULTANT
Geagn hereon are P|
e==~ || PROPOSED INDUSTRIAL SUBDIVISION COVER SHEET AND PROJECT STRATEGY aL Pty Ltd |TTODCORISULTIMG May sts Ncsaie
gene — || VENTURE DRIVE, NOOSAVILLE LOCALITY PLAN Teen to Pron (S44 900 Fax (7) 40 4
ser || for GATEWAY RISE PTY LTD lnm Sica ritaniaent anes ENGINEERS “he wosnach
(Deeetng Reece Wa : vor, . : :
ae
= ° ee Ar mn, | eee D Hopcott me HAR 208
Pad LOT 14 ON Sr70206 STRUCTURAL CIVIL Tap yarn RPEO 2029 |""AS SHO
ces
Reta || COUNTY OF MARCH eRe OATUM BM 108982 Top consuunnepry.to. | — 7 Hufof— 0
gman, || NOOSA COUNCIL APPROVAL No 2007/1626 RL 3.818 AHD Set j ABN. 99.128 005336 *" 06583, 1 al

 

 

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0658 - Operational Works - Road and Drainage_S_Wter_Water and Sewerage [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.