Skip to the record
The gold standard in government transparency.

Council archive · source document

08/0658 - Operational Works - Road and Drainage/S/Wter/Water and Sewerage [As Published] · 142008.658

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

    

cou i Devere ment Application

s Sie ke oe ae ee Se

 

Nature of the works

1. Nature of work that requires assessment against a planning scheme:
LZ Building work - Complete Table A Operational work - Complete Table B
Table A

 

{i) What is the nature of the building work made assessable in the planning scheme?

(ii) Are there any current approvals associated with this application? (e.g. material change of use)

 

 

 

 

 

 

 

 

 

CINo (71 Yes — Provide details below
List of approval reference/s Date approved Date approval lapses (@ known)
[1
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
Ed Roadworks (Xd Stormwater (H Water infrastructure ~—[] Clearing vegetation under the planning scheme
Ej Drainage works} [[] Earthworks BS Sewerage infrastructure
C1 Landscaping (Signage C1 Other - Specify

 

(iii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers fo this question
would be different for different operational work, it may be more appropriate fo provide these details in an attachment to this form)

{Xd Development Permit (0 Preliminary Approval 1 Both (specity below)
|

(iv) Is the operational work necessary to facilitate the creation of new lots (Le. subdivésion)?
(No EX] Yes - Specify the number of lots being created 11 plus AeA non loasis

{v) Are there any current approvals associated with this application? (og Development Permit or Prefminary Approval for MCU or reconiiquring a io)

 

 

 

 

 

 

 

 

[CINo Dd Yes - Complete Table Bia)
Table B(a} Ust of approval references Date approved Date approval lapses (if known)
1. [Reena 2e0o7/l62e \> Dec ZO07 v2 Dec ZOT]
2. | Bulle Cadhworks 2007) bes 27 Dee 2907 2 Oee 2011

 

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour} $1,105 0O0
4

 

 

Mandatory information
3. Confirm the following mandatory information accompanies this application

 

‘Confirmation of lodgement} Method of lodgement

 

 

 

Plans, and specifications if applicable, showing the nature and location of the proposed works (induding the [BQ Confirmed
lextont of any cut and fa)

 

 

 

OFFICE USE ONLY

 

Date received Reference numbers.

 

 

 

 

Advice for completing Part E

General advice
Part A must also be completed for al IDAS development applications.
‘The applicant is responsible for answering ail questions fully and correctly, untess following a response there is a stalement to go directly to another question.
at I A development permit authorises development to occur, while a prelmminary approval is a step in the approval process and does not authorise development to occur.

 

 

 

 

Page 1

 

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0658 - Operational Works - Road and Drainage_S_Wter_Water and Sewerage [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.