Review of Noosa Oyster Ecosystem Restoration Project
Key Issues Report — Noosa Shire Council Confidential and subject to legal privilege
18 October 2022
yan) LSA id 4 LC abst) Recommended action
category
NRF Observations: set out detailed reasons in the internal
Based on the General Committee Meeting Report of 14 January 2019, assessment of an application (and subsequent
Council considered relevant assessment criteria. For example, Council: briefing to Council) as to its compliance with the
: s ea ; , ; criteria as well as a justification as to why the
e considered the risks and opportunities for the Project (noting that it project is being considered in isolation
appears that Council considered this Project in isolation to other :
environmental initiatives and actions that could have been available); / ae
* considered the Noosa Environment Strategy, specifically the alignment of his assessment and justification should also
the Project with a key focus area of this strategy, being “Waterways, include a detailed risk and opportunities
Wetlands & Coasts” (with the first priority of this focus being to [email protected] improve the health of waterways, wetlands and catchments);
e consulted with many internal and external stakeholders, e.g. the Noosa _—Note: this is not a material concern for the Project
Parks Association, Noosa Biosphere Reserve and both Council’s as the Council briefing report transparently
Governance office and Environmental and Sustainable Development identified that this Project had been considered in
office; and isolation (with an opportunity for additional
e considered local content, value for money and public interest criteria (this oration Foated. by Councillors to
was addressed both in the report itself and the report’s attachments). : 4 ee .
Separately, Council might consider the need fora
: . probity advisor to be appointed, as appropriate,
Notably, the above report did not specifically appear to address insurance for grant funding programs to monitor the
and work health and safety criteria. However, we note that this criteria was application of the program.
subsequently addressed in the Alliance Funding Agreement that was entered
into by the parties.
4. Stakeholder consultation undertaken. Council to ensure that its internal assessment
process has an action identified, as part of the
- . assessment, to ensure appropriate stakeholder
BRE Shservatlons: consultation is undertaken. If there are concerns
Council undertook substantive stakeholder consultation before, during and regarding the extent to which such consultation
after the proposal evaluation process. For example, the findings of such can be done at the assessment stage (e.g. due to
consultation were documented in the 2015 TNC Report and 2018 USC confidentiality or the sensitive nature of the
Report. The General Committee Report of 14 January 2019 also noted project), Council should retain an internal action to
Council had consulted with many external stakeholders as part of the Oyster — continue such consultation at subsequent
Reef Pilot Project. appropriate gates.
APAC-#302981652-v3 6 © Norton Rose Fulbright Australia
Page 53 of 113See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.