08/0811 - MCU - Detached House [As Published] · 132008.811
aw ” ” "INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Details of the premises The term ‘premises’ is detined by the IPA, schedule 10 to mean a building or other structure, and fand (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A. . The premises may be identified in a number of ways ~- « Street address and tot on plan are most cémmon and will apply to most applications, * Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundarles on a targe let. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as Zone Reference or GS84 may be provided. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act. StrategicPortLandis within a local government area but a local govemment's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal araa’ for a local goverment and for strategic port land fs defined in the IPA (schedute 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a focal government has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmentat Protection Agency generally has jurisdiction for a local goverment tidal area. However, the IPA gives local governments Jurisdiction for assessing and deciding apptications for prescribed tidal works within the local goverment tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work), ° Resource entitlement Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they Involve taking or interfering with a prescribed State resource, Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State- owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning, Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitement, and the Department of Natural Resources and Water will accept the application as properly made, Far State-controlied roads, a resource entittement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads, Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land ‘above high water mark. Owner's consent Section 3.2. 1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner's, if the application involves: a material change of use; reconfiguration of a fot, work on jand below high-water mark and not within a canal as defined under the Coasta/ Protection and Management Act 1995; or work on rail corridor land. defined under the Transport Infrastructure Act 1994. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application, “Owner for the purpose of a lodging an IDAS development application means the person at the time of Jodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it wera let to a tenant at a rent). Templates are available from the !PA website for the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises. Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary ERA. a Portable Long Service Leave (PLSL) Levy ‘The Building and Construction Industry Portable Long Service Leave Scheme provides fong service leave entitlements to workers in the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave, To fund the scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensiand. The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry (Portable Long Service Leave) Regulation 2002. included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy. The Building and Constructian Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land. The PLSL levy need not be paid when the application is made, but the PLSL Act requires the tevy to be paid before a development permit may be Issued, , The Assessment Manager must sight an approved form Issued by QLeave advising of the status of the payment of the PLSL levy. Bullding and Construction industry Notification and Payment Forms are available from anyQueenstandpost office or agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.ald.gov.au. For further information contact QLeave (Tel; 1800 803 481 Web: www.gieave.ald.gov.au }
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0811 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.