Council archive · source document
08/0811 - MCU - Detached House [As Published] · 132008.811
INTEGRATED PLANNING ACT 1997 : . IDAS Assessment Checklist, Version 21.2, 31 March 2008
B Does the proposal involve development, other than development mentioned in the integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 7B of the Queensiand Heritage Act 1992?
[eo] No - Go fo Q1.2 O Yes - (Complete Form 1, Part C2} This appfication requires assessment by the relevant local government against the IDAS
Code in the Queenstand Heritage Regutation 2003. If the development involves building work and the local
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency. .
IPA, schedule 8, na 2A, schedule 9. lables 1, 2.3. 46 5: IP Regidation, schedule 2. late 1. item 1 1A: IPA, section 1.2.5 (Definitons for terms used in development}:
Queensland Hesil lage Reguiatia
(REMOVING QUARRY MATERIAL; WILD RIVER AREA be % : |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[2] No-Gotoa3 [7] Yes
IPA, schedule 8, part t, fable §, item 1; IP Regulation. schedule 2, tadle 2, ite 14: iP Regulation, schedule 1, table 5. item 2 raid fiver area): Weter Act 2000,
section 966C; Wild Rivers Act 2005, section 434
pis
whe:
‘ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA :
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[=] No-Gotoai.4 [-] Yes :
IPA, schadute &, part 1, table 2, Kem 1 IPA. schedule &, part 5. iat 5. items 2 and 4; 1P Regulation. schedude 2. table 2. items 1 and 23: Envimnmentai Protection Act 1994. section
TIAA (wild iver area); Wid Rivers Ace 2 eokOn +24; metevant wild river declaration; Wid
WITHIN THE LIMITS OF A PORT : : |
14 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
[2] No - Goto. 01.5
C1 Yes
IP Regulation, schedule 2, tabie 2, tems 15 and 16
IDECLARED FISH HABITAT AREA =.=: : a ee " |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[2] No -Goto.a1.6
Oo Yes - if answers to questions in other sections of this checklist indicate that the proposed development i is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
{P Regulation, schedule 2, table 2, item 26
COMMUNITY INFRASTRUCTURE
1.6 ls any part of the premises designated for community infrastructure?
[2] No - Gotoat.7
0 Yes
IP Regulation, schedule 2, tale 3, item 7
WASTE WATER MANAGEMENT _._* a a ]
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[2] No -Endof Section 1 [_] Yes
IP Requiation, schedule 2, table 3, tom 5
PLANNING SCHEME
24 Is the proposed use assessable under the planning scheme?
[FJ No - Goto.a2.2 [e] Yes - Complete Form 1, Part D and answer Q2.1.1 - 2.1.13 below
If yes, does the application request that the proposal be assessed against a superseded planning scheme?
[2] No [[] Yes- (Complete Form 1 Attachment 1)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0811 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.