Enclosure 4 - Schedule 4a
Attached to the e-mail Operational Works Application OPW17/0016.
18.6 Prescribed tidal work that is a pontoon is The design and construction of the pontoon is consistent with Not applicable
designed and constructed in a way to ensure the following standards—
the pontoon’s flotation unit will rise and fall to (a) for a pontoon located in an area prone to flooding—subject to
allow for changes in tidal water paragraph (c), the pontoon’s flotation unit is moored by piles;
levels. (b) for a pontoon other than a pontoon mentioned in paragraph
(a)—subject to paragraph (c), the pontoon’s flotation unit is—
(i) attached, through the pontoon’s system for mooring the unit,
to concrete anchors in the bank landward of the pontoon; or
(ii) moored by piles; (c) if a relevant planning scheme
standard is more stringent than the standard mentioned in
paragraph (a) or (b)—the relevant planning scheme standard, to
the extent it is more stringent than the standard mentioned in
paragraph (a) or (b).
22
Coastal Protection and Management Regulation 2003 – Schedule 4A – IDAS code for the development of prescribed tidal work