NE@renw we Checklist - Applications Involving Land
./ Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1... “APPLICATION FORMS ~ ~~ a. . *: ~ oe . ci
1.1. Form PartaA
1.4.1 Ensure that the form is fully completed. wm
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1. If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
4.2. Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed.
2. REFERRALINFORMATION “7 OT
) 2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. [CA ot
3. ~ ENVIRONMENTALLY RELEVANTACTIVITIES, ©)
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
‘4. ' FORM 2-REQUEST TO CHANGE APPROVAL ~~
4.4 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
%. PLANS) oe 7 SD TR ea
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 4 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6.. “SUPPORTING INFORMATION “7077 TT I Oe aa
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
© 6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. ¥
7. FEE OD CUETO
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. .
Receiving Officer 2 dmc pos Date we St ECD coccccsees
Having completed this form and accepted the lication, please deliver both to the following IDAS Application Receiving
trays:-
e Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
» If the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
« {f the application is for Operational Works (for parking, access, sewerage or drainage) exclusively ~ AOD2Z2 in the
Land Devetopment Section.
« Inall other circumstances - AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEPI g:\ant\orms\application checklist.doc
“ae (AOSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 47 (of 79)
Section 2
(y RECEIVE ‘A rT lartoo
Our Reference: 00856 L04 HB ' “IVED consulting oO
. ad AUG 2007 By pty Itd
3 FRONT Cee town planners +
S,
17 August 2007 > ée/ urban designers
Chief Executive Officer aT
Noosa Shire Council
P.O. Box 141
Tewantin Qld 4565
Attention: Environment and Planning Department
@ Dear Sir/Madam
RE: Application for Development Permit for Material Change of Use of
Premises for Visitor Accommodation - Type 4 Conventional (Visitor
Hostel) at 1 Hill Street & 162 Edwards Street, Sunshine Beach:
Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit
Trust
Please find enclosed a development application for the above proposal which has been
prepared in accordance with the Integrated Planning Act 1997 and lodged with your
Council as the Assessment Manager of this application.
The attached development application includes:
¢ six (6) copies of the Proposal Report and associated proposal plans;
* acompleted IDAS application Form 1 Parts A, D and associated checklist;
and
@ * a cheque for $21,750.00 which is understood to be Council's application
fee as the Assessment Manager.
Please contact our Noosa office if you require any further information and/or clarification.
Yours faithfully
Hannah Blue
Senior Planner :
Martoo Consulting Pty Ltd
SUNSHINE COAST OFFICE GYMPIE OFFICE
1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570
TELEPHONE 07 54555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 54824952
[email protected] [email protected]Section 3
‘ ™ - .
2
* INTEGRATED PLANNING ACT 1997 ° Part A, Version 2.4, 29 May 2006
Form 1 Development Application ETS
a /
Ommon deralis Sr
ee
The completion of all appticable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.
Description of land 1. Street address: fncludinghouse number, street name, suburb/locality name & postcode) {if applicable)
identifed, Howover, a description ofthe land isnot 1 Hill Street & 162 Edwards Street, Sunshine Beach
Laetrentaly Reloont Achy (ea 2. Name of water body or watercourse, within which the development is proposed: (i applicable)
development is proposed within a water body or
@ watecourse. 3. Loton plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be
identified by a lot on plan description. These details Lot 106 & 107 on RP 94566
be obtained from title d ts of through th tops
localgovenment «14. ~The above description is for: (tick applicable box)
However, if the land on which the development is [XJ (i) the land on which the development is proposed; or
ed d have al description (i.e. -. ae wap . .
enicveoomath pepeedhevasrtenor (1 (ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
9 adjoningiacentian. or ° 1 (iii) the water body or watercourse.
i) the lot on plan descripti th ass
ii) GPS coordinates where there is no
" adioining/adjacent land (eg. in Moreton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
sence: oo oh 000m
development is within a water body or watercourse. .
* Agvice for completing Q8 - Q8 applies if i i ie . ” :
development is within a local gavernment area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) {if applicable)
Note: Areas below high water mark are not within a Noosa Shire Council
local government's area unless provided for under the
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing Q9 - Q9 applies if i . ‘ He) (7 }
developments on stratagic portland or a strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
provided in an attachment to the application. Vacant
11, Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
Visitor Accommodation - Type 4 Conventional
Other applicable parts of Form 4 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc)
completed parts of Farm 1. For information about
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who is making the application. The i ;
applicant need not be the owner of the land. So Brash Cone’ P/L ATF Zana Larrika / Greg Martoo
When signing and lodging this application 16. Facsimile number/e-mail address:
The applicant is responsible for ensuring the 14. Contact number: 5455 5725
information provided is correct. The assessment 5455 5425 .
manager, any referral agency & the Chief Executive [email protected]
(where appiicable) will rely on this information when
assessing and deciding the application, 17. Postal address:
Ifthe applicant Is a company - a contact person PO Box 1684. Noosa Heads Q 4567
must be shown. ,
18. Signature) 19. Date:
August 2007
L$
[2 aSection 4
© INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
application must contain, or be supported by, the
written consent of the land owner/s, if the application .
involves: (i) see attached
{i} amaterial change of use; doce en ce ccc cece rece e ee ee eee cece ecb cece eee ee eee ee eee eee ee eee cece ecb cece eee
{i)_ reconfiguration of a lot
(ti) work on land below high-water mark & not within a {il}
canal as defined under the Coastal Protection and we ee ee ce ce eee eb ec cee eee ewe eee cece cece weeecenabho ee eee eee
Management Act 1995;or a
(iv) work on rail corridor tand defined under the (iti)
Transport infrastructure Act 1994. a CS
Section 3.8.1(2)(a) of the 1PA provides that
landowner’s consent is not required for a mobile or (iv)
temporary ERA . wee een ee ee nn ap cee nn ee ee re nn nef e enn e wenn
For more information refer to Guide 4. (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2. 1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
fesource entitlement be given for applications that
involve a prescribed State resource. XJ NO - go to. Q24 1 YES - go to a22
Section 3.2.1(40}{a)(ii) of the IPA prescribes that : soe . .
applicafon ae akon be rope mate {| 22. This application is accompanied by evidence: (tick applicable box)
ie nee . te mee [1 (i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(v)
Refer to schedule 10 of the Integrated Planning 1 (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource - go
required by the State in support of the fodging of this to Q23 OT
development application. . . . ., ; . .
@ [_] (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource — go to Q23
Advice for completing Q23 23. Evidence of the resource entitlement:
The information in (i} ~ ¢v) i datory if evi is . . : : ‘ .
remurad unde O22 th Wine evidence is (i) Resource entitlement / authority details (vil) Official stamp of the department
The official stamp of the Department of Natural administer ing the resource (if
Resources, Mines and Water Is mandatory where the . applicable,
application involves any water of riverine quarry (ii) Name of delegated officer
material under the Water Act 2000.
Section 3.2.1(5A) allows the resource manager to fimit
the time the evidence may be used. Q23 (vi} must be iti it;
completed if the evidence is time limited. (i > of delegated officer
‘ (iv) P of ~ officer
(v) Date
(vi) _ date of evidence a
Assessment triggers 24. \s the IDAS Assessment Checklist completed and attached to this application?
hhocompiion of Pars ne here Poomeahe ‘t ° x YES CT NO ~ the assessment manager may refuse fo accept this application on the
must be completed for alt other applications. grounds that the application has not been property made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
support the proposal & enable the assessment Plan / Drawing / Report Number | Tite |e
An application should be accompanied by details to 1 .
manager, referral agencies and any person viewing : .
the application during public scrutiny or public (i) 00856 RO1 HB Proposal Report (including August
Notification to understand the scope of the proposal proposal plans) 2007
and any potential impact. we ee en ne ee ee eee eben ee eee en nee
(ii)
{iii)
(iv)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
A
OFFICE USE ONLY (applicable to assessment manager's)
DATE RECEWNING OFFICER'S [ 9 REFERENCE
FE®) 24,750 neceneo | 17/@lo7 | naw PD Rien, | ‘Woneens [OT [Les |Section 5
Lo-AUL ee Di 2> RUM MARK BRIN CUNSRUCT UNS IU wrSayod're> v.11
7? 79972987 14:41 -87-5447-5464 DOLPHIN BAY R/ESTATE PAGE 92/02 |
we
TEGRATEO PLARMINS AGT 1897 Patt A, Yoenion 2.4, 29 Hay 2008
Land camar’s conesot (f appicabty $0. Land gure’ consent to the making of this apstcafon:
cements, | [hee Lae :
siatasiaenzinn Sane -
[eae Dx Bp ptte LKR a ee MRO
4 ‘
secant) Oat) Deleaes |e. esaadetltee... Wk:
A week Ce Pal cori nd! dain ond he (rt :
‘anpert sactre Al 199, vnecuesstntecesenneneemercneuasumeceatbener----stenpyecscecaserestdannsa banner senna a |
Booted 35,16299 of 0 PA provides Tet
ico cases preys rash oF y)
Henmrare ERA - ewe ow nee ahd Ewe mae eh een eh OR ph ees PERE RO Se Er em rer aRans tO} eas sa way se Tee
fee mpia roennston refer Buide f, (vy) :
Sarena) [RT ene nce a Beat eed erie Dor tn |
mecha. ve rmdnt win | query mabede! of Bbtto cosets land ancioy e Conta! Pratestisn aod Menesgemcol Art 1
eh neon DINO-powaa LD YES - pr ar |
Caner 22, ‘Tris egptoation Is accampanied by evidence: (tek npprcabie box
iho She rewearoa (1G) atthe allocation ot, or enlitement ts, the ressutce — otech erkionce and goto G2nfH) |
en ge pitas pan Pe E10) the chat exocurtve of he dopartment administering the resource fs satieied the
rita etc leaiencr¥a ian ans development lp scrtetent with an allacatinn oto element oy he renousos - ge :
@ (eens (169 the chist execulve of the deparinant administering the resource fs eatetad the :
devaiomont applicalion may nrocemd In the absence of ap afiocaticn of, or
entitlement fo, the rexmrce - go & G24 ! :
Abletenanalaion ' , 23, Evidence of ihe resource entifament:
te ered ing iy and teknes | 1) Rpaourge enttemen/ suri datale (pone eam fo depen |
2 Po 4
Tecaidey decanted LCi a !
Resor Mic acaonany | (i) Name of delogttnd sffoar = ;
saan Pf :
aesiiacoatemerammmriot| 5 satel oat
Saad Ya events Faw ( en SP
(vy) Sipatur of dabageted aficer
(vy) Bate | |
[TOL
{i} Exphy date of evidence m enptens |
Tsusonedt tigger Site he DAS Acoenstoerd Checttal comipisted and eftadhed lo thie applcallony? -_
“Tie cheats dows al oopty Wiha eppeetios manu YES (TINO ~ tho ssteaeaestt manager may ratiee to scons this application on ike
e oe OS |
Pane! drawings /raports G8. Plans/drewinge/repoits ancampanying Unis epphoation: |
ecercgnareemcse’ | peibemlnontimiw | te | ae) |
ae cr aeeeh ETS Q
tra eprom se kenpe el Int popotal ebm cmemenns os cad ndueogen amt f sp hOeke aera) am mnne ene me anne r— sn AREA RS TOES peommenenser |
an peeve Oo. Ree we knee ar oa Men dW a are men en ne ream ae sae bad eRe gee--seaeeeee \
v _ eel
SEAR NOTE: The axecnecemt manger nay ree to acoapt 2a spol hata the Sm cf geen, fab poe el pple Woon recured by Part A |
ened ary ches rateent part ! Form 6 |
OFFICE USE ONLY (epptcabie & ancoanngnt morse "EER Nae OTTER Ian rt
rT Hoéficalfon of Engegamert of Private Cortifier Opuanay farmay ;
t Cound, Have been engaged a3 the private cera for Crm mulling werk raferac to tis eDpicatFOn.
Op i TTI TTT AS r
Dats st ongapomant 7/1 AcstotIan§On RUTHHE cere — f= ES FAR,
| |
TOTAL P.O1Section 6
*
7 INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Notification of Engagement of Private Certifier (Optional format)
To Council, | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement / / Accreditation Number. ___ Name: Signature:Section 7
INTEGRATED PLANNING ACT 1897 Part D, Version 2.0, 4 October 2004
Form 1 Development Application idas
Material change ofuse &
assessable against a local government's planning scheme Ze
Completion of all applicable questions on Part D is mandatory for alt applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application 1. This application is for: (tick 1 or both if applicable)
7 ceveopment permit autiorses fi [_] Preliminary approval for a material change of use of premises including conceptual
approval ls 2 step in the approval process design for any associated works that require approval under the planning scheme (ie.
and does not authorise development to occur. consideration of the proposal concept)
AND /OR
@ XJ Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
the planning scheme against which the Eastern Beaches Locality - Semi-Attached Housing Zone
application will be assessed.
3. _ Existing gross floor area: (if applicable)
4. Are there any existing easements on the land?
J NO
C1 YES - attach plans of the focation and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land fo shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
vacant to Visitor Accommodation - Type 4 Conventional (visitor hostel)
6. Number of employees: 1 employee on site at any one time
7. Operating days and hours: standard industry operating hours
©} Associated building works details (if |g Site cover:
applicable) , ,
For the definition of "site cover’, “gross floor 9. Gross floor area: 757m2
area” and “storey” go to the planning scheme |" .
inst which the application will be . .
eee 10. Number of on-site car parking spaces:
14. Number of storeys / maximum height above natural ground: 2 storeys / 8 metres
12. Number of employees 1 employee on site at any one time
13. Hours and days the use will operate standard industry operating hours
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fill, drainage, road works etc.)
(eppicede) separate operational works application to be lodged
if applicabl
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 7.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
| REFERENCESection 8
21. Aug. 2007 15:43 MARTOO CONSULTING No. 0681 PP. 2
INTEGRATED PLANNING ACT 1997 Part N, Version 1.0, 4 October 2004
| Form 1 Development Application fe Fels
—_ Mm. Ee
4 Contaminated land %
/ , tim cy ESSE oy :
wr PRY NE
ey, bal Wee
(2... oe | . u
fl VL.
Completion of ali. questions on Part N Is mandatory for all applicalions involving assessment against (he Environmental Protection Act 1994 when
development 's proposed on contaminaled of potentially contaminated land. ‘
For further information refer lo Gude § Contaminated Jand matters available free from www.tpa.dld.cov.au or the Environmental Protection Agency's
(EPA's) information sheets available {ree from wew.epa.qld,qov.au under Ecoaccess/ business and industry. Alternatively, contact (he local governmenl.
Nature of the application Tt. This appilcalion ts fof: rick one (S}ortoth fapotcade) =
Exemptions may apply (o your proposal, —— a — —— ———
© Refer fo Gulde § Confemnhtafed land matters Aspect of developme _ Type of approval bln 60
for advice regarding development (hat ts re Tt “Fe ar os ;
exempl tam tls assessable devalopmant Malesia! change of use (1 Preliminary approval |X) Development permit
tigger. = : . — . — . ‘ ~ —
(J Reconfiguring a tol [[) Preliminary approval |] Development permit
2. Does this application require assessment against a planning scheme?
LJ No Ps YES — comiplgte othar rolavant parts of tha IDAS Appfcation Form 4
The subject [and 3. Has an Environmental Management Register (EMR) and/or Contaminated Land Register (CLR)
search beat conducted for lhe land lhe subject of the application?
KINO [J YES - attach rosuds of the search and complete O4
4. All or part of the land the subject of ihe application Js:
[1 @) _ onthe EMR or the CLR under lhe Environmental Protection Act 1994;
(C1 (ii) used for, or if the tand is vacant, was last used for-
C1 (a) anotifiable activity
: (1) anindustrial activity and the proposed use is for a child care centre,
educational, recreational or residenUal purpose (including a caretaker residence on
industrial fand), .
CA {il) tn an area for which an area Management advice has been given for natural
mineralisation or industtal activity and lhe proposed ase Is for child care, educational,
©} . recrealional or residential purpose {including a caretaker residence on industrial fand);
EX (iv) In an area for which an area management advice has been given for unexploded
ordnance, —
Pians and documents 5. Confirm, by licking the applicable box(es), that the following details are provided in plans and ,
For further Infomation about preparing 2 wrlten information supporting this application:
proposal report reler lo Guide 7 Preparing @ (-)@) _ plans showing where any Notifiable Activily, Hazardous Contaminant, or polentially
proposeseben contaminated aclivily / activilas have occurred on sile;
C1 (1) if the application involves a material change of.use from an Industrial use to a more
sensllive USO (eg. child care, éducsillonal, recreational of residential purposes), Supply a datalled
site history outlining previous potentially contaminated uses on the site
PLEASE NOTE
PART N of Form 1 cannot be accepted by the assessment manger unless accompanied by PART A of Form 4.
Tha assessment manager may refuse to accep! an appilcalion that, al the ima of lodgement, fails to provide all applicable Information |
requested by Part A and any other relevant part of Form 1. |
OFFICE USE ONLY fapplicable to assessment manager) .
REFERENCESection 9
’ INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Verston 20, 2 April 2007
Form 1 Development Application idas
YY Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4, Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
§. itis the responsibility of the applicant to accurately complete this checklist
6. Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
© 7. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?
9. To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 4 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more Information refer to Guide 4. (J (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Uniess you answered “none of the above" to C11, has not been made - complete Part G of Form 1
the application requires assessment by the se mg . . .
administering authority’. [_] (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the | (ii) none of the above
@ application, the administering authority is a
concurrence agency for the applicatian in relation
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 4
for approval where an allocation under the Water
Act 2000 is required.
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicable to assessment manager)
1 The assessment manager is responsibte for assessing and deciding an IDAS application. The assessment manager for an application is prescribed In schedule 8A of the IPA.
2 For additional information refer to Guide 6 ‘Dees my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1Section 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Versidh 20, 2 April 2007
State-controtled road matters 2. The application involves: (tick applicable boxes)
For more information refer to Guide 3, [J (i) development on land contiguous? to a State controlled road and for -
Unless you answered "none of the above" fo Q2, . . .
the application triggers referral to the Department (_J (a) material change of use assessable against the planning scheme;
Fe eee antes ice (7) (b) reconfiguring a lot unless -
agency, while in other circumstances DMR will e the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 of the IP Regulation will assist you to . . , . .
“ole ning where DMR an aiiceor [J (c) operational work {not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)—
* associated with access to a State-controlled road; or
e for filling or excavation; or
¢ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (i) development on land not contiguous to a State-controlled road and -
(J (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
[7] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
[1 (c) operational work (not associated with a material change of use assessable against ~@
planning scheme or reconfiguring @ lot mentioned in (b) above}-
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EX (ili) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. CL) (i) material change of use —
Unless you answered “none of the above" to Q3, . . .
the application requires assessment by the (a) assessable against the planning scheme;
Oepartment of Natura! Resources and Water {b) on alot containing _
(NRW).
ff an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa e if there is no property map of assessable vegetation for the lot - remnant vegetation:
concurrence agency forthe application in relation (c) where the existing use of the land is a rural or environmental use; and
IF you ticked Q3() or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Teferral to NRW for assessment regardless of | (ii) reconfiguring a lot —
whether vegetation clearing is proposed or not. ,
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; ©
(b} where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(3) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
CJ (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
EX (iv) none of the above.
Strategic port land 4. The application involves:
Irosboed te, ve ae ist [J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
you ticked (i) - the relevant Port Authority is the .
assessment manager for the application. Act) complete Part | of Form 1
if you ticked (4) Queensland Transport is a C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. TI Act for the strategic port tand - complete Part | of Form 1
EX (iii) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2Section 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
. Acid sulfate soils 5. The application involves development on land situated in an identified local government area
For more information refer to Guide 10. and where the surface of the land is: {tick applicable box)
Unless you answered “none of the above" to Q5, (71 (i) betow 20m AHD® and the development will involve the excavation of 1000m3 or more of
the application requires assessment by . . below 5
Department of Naturat Resources and Water soil or sediment at or below 5m AHD, or
(NRW). [_] (ii) at or below 5m AHD and the development will involve filling the site with 1000m: or more
If an agency other than NRW is the assessment of material
manager for the application, NRW is an advice .
agency for the application in relation to this 1 (iii) none of the above
matter.
Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible
major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 47. mR NO
\f you answered “YES” to Q6, the application
requires assessment by the Department of _] YES - complete Part L of Form 4
Emergency Services (DES).
If an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
relation to this matter.
Water related development under the |7. The application involves:
Water Act 2000 1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a) - (f), refer (tick applicable box/es)
to Guide 15. For more information about item . ,
(g), refer to Guide 14 Does my application (] (a) in a watercourse, lake or spring, (eg. e pump, gravity diversion, stream redirection, weir or
involve assessment of a referable dam? dam) - complete Part Kz, Ks, Ks, Ke, or Ks of Form 1 whichever is applicable;
@ Unless you answered ‘none of the above" to Q7, [-] (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by the .
Department of Natural Resources and Water Ky of Form 1;
(NRW). (1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
fran agency heap than we by a water resource plan, for use for purposes other than stock and/or domestic
anager for the application, :
concurrence agency for the application in USE - complete Part K; of Form f;
relation to this matter. [_] (4) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
[] (e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1;
(] (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kroof Form 1
(J (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
(X1 (ii)_ none of the above.
Removal of quarry material froma |8. Does the application involve development for the removal of quarry material from a watercourse®
watercourse requiring an allocation notice under the Water Act 2000?
For more information refer to Guide 16. ned NO
If you answered “YES” to Q8, the application
requires assessment by the Department of [J YES - complete Parts Kr and G of Form 1
Natural Resources and Water (NRW).
if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the appfication In
relation to this matter.
Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Doungtas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Datum {AHD).
7 The declared ground water areas are listed in Guide 13 Develooment in a declared catchment area,
8 Referable dam is defined under the Water Act 2000.
9 Watercourse is defined in sch 10 of the IPA.
Page 3Section 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Versién 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: (tick the epplicable box/es)
work in coastal management district (CO (i) tidal work" as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For : : :
more information about prescribed fidal work in Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or
local government tidal areas refer to Guide 24. (-] (ii) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; of
Unless you answered “none of the above" to Q9, vee . tay og
the application requires assessment by the (1) (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
an agenty dther tran en i the assessment (1 (a) constructing or installing works in a watercourse between MHWS and HAT {ie
manager for the application, a :
concumence agency for the application in other than those works in tidal water) where the development has been determined not
relation to this matter. to be assessable against the Water Act 2000;
Local government is the assessment manager (1 (b) constructing a canal"? intended to be connected to tidal waters:
for all prescribed tidal work. : pe
(J (c) constructing an artificial waterway;
[J {d) reclaiming land under tidal water;
(J (e) disposing of dredge spoil or other solid waste material in tidal water;
[J (f} interfering with quarry material on State coastal! land above high-water mark;
[1 (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(4) (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(9 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or @
X1 (iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: ( tick the applicable boxes)
mak . (C1 (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For : . . :
more information about prescribed fidal workin Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Or
local government tidal areas refer to ee CJ (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
Unless you answered “none of the above" to oe . tgs sae
at0, he application triggers referral to C (iii) carried out within a coastal management district's under the Coastal Act and for -
Queensland Transport (QT} (Maritime Safety i i i ; ial in ti _
Qld) as a concurrence agency. (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
. M of Form 7;
Local government is the assessment manager . :
for all prescribed tidal work. [J (b) reclaiming land under tidal water - complete Part M of Form 1; or
(J (c) constructing a canal’, if the canal is associated with reconfiguring a lot ~ complete
Part M of Form 1;
(iv) none of the above.
Coastal management 11, The application involves: (tick the applicable box/es)
For more information refer to Guide 18. CJ (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to work carried out completely or partly in a coastal management district’
Q11, the application requires assessment by the . ; ; . .
Environmental Protection Agency (EPA). C1] (ji) a material change of use assessable under a planning scheme involving building @
Hf an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is —
for the application, EPA is a . . .
conearance agency for the application in e the construction of a new premises with a GFA'® of at least 1000m?
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2
C1 (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
L1 (iv) reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? - complete Part M of Form 1
(J (v) none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works fo construct the artificial waterway.
Page 4Section 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
, Development within the limits ofa | 12. Does the application involve development below high water mark’? and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For ® NO
information about prescribed tidal work refer to
Guide 24. [J YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
\fyou answered “YES” to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
© within 200m of a shipping channel or an enty
and exit shipping corridor for the port
e within 1000m of a swing basin, a commercial
Shipping wharf, a mooring, anchorage or spoit
grounds;
© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994.
In ail other situation the Port Authority is an
advice agency.
Marinas 13. Does the application involve operational work that is tidal work for a marina’? with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed me NO
tidal work refer to Guide 24. The local
government is the assessment manager for all - abe 4 te ot $5
prescribed tidal work, ([] YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
if you answered *YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
© Service as an advice agency.
Tidal works in strategic port land tidal/ 14. Does the application involve tidal works within a strategic port land tidal area20?
areas &K NO
For more information refer to Guide 18. Cc YES - complete Part M of Form 1
Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies far the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
If you answered “YES” to Q15, the application Kl NO
tiggers referral to the Queensland Heritage
Council as concurrence agency for the [_] YES - complete Part C of Form 1
application,
Unless you answered “none of the above" to Oe application mvowes: ee applicable mes) vast the lanni , the |
Q15(b), the application involves referral to the (i) | amaterial change o use assessable against the planning scheme an the lot shares a
Environmental Protection Agency as an advice common boundary with a protected area or registered place under the Queensland
agency for the application Heritag e Act 1992:
(_] (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
© registered place under the Queensland Heritage Act 1992:
[XJ (iii) none of the above.
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the involves: (tick the applicable boxes)
declared catchment areas within Queensland, ' . ' . oo
refer to Guide 13. (1) (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Unless you answered ‘none of the above" to J (ii) development assessable against the planning scheme involving the establishment or
Q16, the application requires assessment by the expansion of a waste water disposal system, other than a disposal system for carrying
Department of Natural Resources and Water . oe . . ,
(NRW). out an environmentally relevant activity under the Environmental Protection Act 1994;
if an agency other than NRW is the assessment (X (iii) none of the above
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1998.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page §Section 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Versidn 20, 2 April 2007
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving materiat change of use j i i j -
and) or reconfiguring a lot may bigger this 0 i) reconfiguring a lot for which all of part of the premises are
referral, (a) premises mentioned in the IPA, schedule 8, part 1, table 2 —
For more information refer to Guide 5. + item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above" to * item 6, including the exemption otherwise provided for by paragraph (e); or
Q17, the application requires assessment by the ei i i i i i ini ivi
Environmental Protection Agency (EPA) fan ter 7, including the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment a vity; or . . .
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in ordnance - complete Part N of Form 1
hii a material change of use -
relation to this matter. . .
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
. (b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
. complete Part N of Form 1
BY (iii) none of the above
Ls.
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the [P [J (i) reconfiguring a lot where any part of the lot is -
Unless you answer ed “none of the above" to e subject to an easement in favour of a distribution entity or transmission entity under the
Q18, the application triggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is granted in that Act; or
favour of as advice agency, « situated within 100m of a substation site;
L (ii) a material change of use, assessable against a planning scheme and not associated @
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
[_] (iii) @ material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
(1 (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
e the work is tocated wholly or partly within 10m of a substation site;
EJ (v)_ none of the above.
Land designated for community 19. Does the application involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure? @
Applications involving development on land ar : ; a.
designated for community infrastructure may (i) intended to be supplied by a public sector entity; and
trigger this referral. (ii) on land not owned by or on behalf of the State; and
F informati to schedule 2 of th -.
IP Reaatoe refer to schedule 2 of the (iii) other than development -
ff you answered “YES" to Q19, the application (a) for the designated purpose; or
requires assessment by the chief executive of ; :
the department administering the Act authorsing (b) carried out by, or on behalf of, the designator.
the development for the designated purpose. kK] NO
lf an agency other than the designator is the
assessment manager for the application, the O YES
designating agency will be a concurrence
agency for the application in relation to this
matter,
Page 6Section 15
INTEGRAT&D PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
. SEQ Regional Plan 20. The application involves (tick applicable boxes) -
For more information refer to schedule 2 of the (J (i) amaterial change of use of premises -
PReaulaton in a Major Development Area in the Urban Footprint for
Refer to Chapter 2, part SA and schedule 10 of (a) in a Major Development Area in the Urban Footp -
the Integrated Planning Act 1997, and schedule CI {i) an urban activity -
‘onions = frretevan (1 _ in an area included in a structure plan where the IPA, section 3.1.6
Unless you answered ‘none of the above" to applies;
Q20, fhe application requires assessment by the [-]_ in an area not included in a structure plan where -
Ofnce of Urban ement (OUM) » the IPA, section 3.1.6 applies to the application for the material change
of use; or
e the premises exceeds 10,000m2; or
e the gross floor area (GFA) on the premises will exceed 10,000m2; or
e impact assessment is required under the relevant planning scheme
C) (ii) intensive animal husbandry, or
{) (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
(J (i) an urban activity and not specified in section 2.4(2); or
] (ii) residential development involving a rural residential purpose and not
P g
specified in section 2.6(2}
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
@ (d) in the Investigation Area for -
C1 (i) anurban activity and not specified in section 2.10(2);
(J (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
[) (iii) intensive animal husbandry
CJ (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
KX] (iii) none of the above
Fisheries matters 21. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP C) (i) an assessable material change of use for aquaculture - complete Part O: of Form 1;
equiation. ” . : . we .
Unless you answered “none of the above" to CJ {ii} assessable operational work that is the construction or raising of a waterway barrier -
Q21, the application requires assessment by the complete Part Os of Form 1;
Coe at nisiies and Penal C1 (iii) assessable operational work completely or partly within a declared fish habitat area-
f : . complete Part O2 of Form 1;
an agency other than DPI&F is the assessment!
manager for the application, DPI8F is a [_] (iv) assessable operational work that is the removal, destruction or damage of a marine
© concurrence agency for the application in plant - complete Part O2 of Form 1;
relation to items (i) - (iv) and an advice agency , .
in relation to item (v). (J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
(vi) none of the above.
Page 7Section 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 .
Integration of land use and public 22. The application involves: (tick the applicable box/es)—
vanspo r emation refer to Guide 23, schedule (] (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the IP Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Untess you answered “none of the above’, the schedule.
application triggers referral to QT as a
concurrence agency. [] (ii) reconfiguring a tot—
(J (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
LJ (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
[1] (c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
("] (d) _ for a residential purpose within the 25 ANEF contour for an airport;
(J (e) for a residential purpose resulting in 100 or more allotments.
1) (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(J (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
[J (b) will result in work that encroaches into an airport's operational airspace.
EX] (iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule CJ (i) a material change of use assessable against the planning scheme for a purpose
BA ofthe IPA & sched 2 of the IF Regulation ° mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above”, the
application triggers referral to QT as a schedule.
concurrence agency. [_] (ii) reconfiguring a lot—~
[1 (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[_] (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(J (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
{]{d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
["] (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(J (f) for aresidential purpose resulting in 100 or more allotments.
(1 (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii) @
above, involving extracting, excavating or filling greater than 50m, on land that—
[J {a) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[]{b) is completely or partly within future railway land, or a railway tunnel easement:
(1 {c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
DX] (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to
For more information refer to schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
oe sed" {the hove’. the (JJ (i) a material change of use assessable against the planning scheme and not associated
applicaton tiage’s vefenal to the bolder of with reconfiguring a lot, and any structure or work will be located wholly or partly in the
pipeline licence No 1 issued under the Petroleum easement.
Act 1023, currently Santos QNT Pty Ltd, for 1 (ii) reconfiguring a tot
: _] (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
[XI (iv) none of the above.
Page 8Section 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
. Koala habitat area 25. The application involves: (tick the applicable box/es)—
Four Pofte P Rea st Gate 28 and C1 (i) a material change of use of premises in a koala conservation area or koala
Unless you answered “none of the shove", the sustainability area made assessable under a planning scheme, that is not for a domestic
application requires referral to the Environmental activity and will result in -
Protection Agency as a concurrence agency. (J (a) clearing of native vegetation over an area greater than 2500m?;
{_] (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
(1 (c)_ an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
[-] {d)} extracting gravel, rock or sand from an area greater than 5000m:?;
[-] (e) excavating or filling an area greater than 5000m2;
(1 (f} additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
(J (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
(_] (a) an increased number of lots;
[J (b) clearing of native vegetation over an area greater than 2500m2.
CJ (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ij) above) that will result in the clearing of native vegetation
over an area greater than 2500mz2.
@ 1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
[-] (a) clearing of native vegetation over an area greater than 2500m?;
[_] (b) extracting gravel, rock or sand from an area greater than 5000m?;
[1 (c) excavating or filling an area greater than 5000m2.
(XJ (v) none of the above.
Wild river area 26. Does the application involve development in a wild river area declared under the Wild Rivers Act
For more information, refer to Guide 27 2005?
If you answered YES to Q26, you must also &) NO
complete section 2 of this checklist. This will
enable you to determine if your application can J YES
pfoceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.
@ Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under
Ifyou answered YES to Q27, the application Section 3.1.6 of the integrated Planning Act 1997?
triggers referral to the Department of Local
Government, Planning, Sport and Recreation as X] No
an advice agency. C) YES
Wetlands 28. The application involves: (tick the applicable boxes} -
Domestic acthity the construct (| (i) — amaterial change of use, other than for a domestic activity, assessable against the
esIc ai means the consi ion of use * tat ans .
of a single residence on a lot and any reasonably . planning scheme that is in or within 100m of a wetland,
associated building or structure. Examples of a C1 (ii) reconfiguring a lot -
building or svcture that could be reasonanty In or within 100m of a wetland that will result in
associated with a single residence include: . .
caretaker’s residence, granny flat, building or LJ (a) more than 10 lots being created; or
structure used for a home business. [_] (b) lots less than 5 hectares;
(X1 (iii) none of the above
Note: Welland is defined in the Integrated
Planning Regulation 1998.
Untess you answered “none of the above’ to
028, the application invoives referrat to the
Environmental Protection Agency as an advice
agency for the application.
Page 9Section 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 A rl 2007
Conservation Estate 29. The application involves: (tick the applicable box/es)—
Urban purposes is defined in the Integrated CL (i) a material change of use for urban purposes that is in or within 100m of any of the
Planning Act 1997 as “purposes for which land is following -
use nes beghindaenal Sena (1 {a) aprotected area, forest reserve, critical habitat or area of major interest under
purposes, but not inluding environmental, the Nature Conservation Act 1992;;
conservation, rural, natural or wildemess area (-) {b) a State forest or timber reserve under the Forestry Act 1959:
purposes”. (J (c) amarine park under the Marine Parks Act 2004;
Unless you answered ‘none of the above” to (_]{d) arecreation area under the Recreation Area Management Act 1988;
Ge ne applcalin vob refer ON ice Ci(e) a world heritage area listed under the World Heritage Convention;
agency for the application application. (J (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
(1 (ii) reconfiguring a lot if -
(J (a) any part of the lot is situated in, or within 100m of, any of the following —
CJ (i) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
(1 (ii) a State forest or timber reserve under the Forestry Act 1959;
C1 (iii) amarine park under the Marine Parks Act 2004;
[J (iv) arecreation area under the Recreation Area Management Act 1988;
[1 (v) aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(J (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than 5ha;
(XI (iii) none of the above. @
Page 10Section 19
- INTEGRATED PLANNING ACT 1997 iDAS Assessment Checklist, Version 20, 2 April 2007
(completion mandatory if the proposed development is located in a wild river area)
Wild River Area 1. Which wild river area is the development proposed in?
tt the responsibility of the applicant to
determine if the development fs proposed in
a wild river area.
Information about wild river areas including the The proposed development is to be located in: (tick the applicable box/es)
geographical location and position of . . .
management areas in relation to properties, can Cc i) a high preservation area (HPA);
be accessed by contacting the Department of “ . :
Natural Resources and Water (NRW), accessing | L_ ii) a preservation area (PA) ;
contacting the department by email on: LC] i) a wild river floodplain management area (FMA);
the department's website www.nnw.qid.qov.au or An Id ri [email protected] CT] iv) a wild river nominated waterway;
Note on Referrals (_] v) a designated urban area (DUA).
Referrals for development in a wild river area
{other than for agricultural activities and animal
husbandry activities} are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27. The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
May vary between wild river areas. The relevant
declaration will provide the infermation applying
to each wild river area.
Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.
Environmentally relevant activities | 2, Does the proposed development only involve any of the following environmentally relevant
(ERAs)} in a designated urban area activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
Hyou answered YES, your application for an : :
ERA is exempt from any wild river requirements i) An ERA 28 or ERA 14; or
and provided there are no other aspects of this, ii) Alevel 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
development that require assessment against
wild rivers, you do not need to complete the CT NO C] YES (ensure you have completed Part G of Form 1)
remaining questions in Section 2.
{f you answered NO to Q2, please complete the
remaining questions in Section 2.
Clearing native vegetation 3. Is the application operational work for clearing native vegetation in a HPA?
for which an application to clear native [] NO C] YES (ensure you have completed Part J of Form 1)
If YES, there are a limited number of purposes
vegetation may be accepted In a HPA. See
Guide 27 for a list of relevant purposes for | 4. If YES, is the clearing?
which an application may be made in a HPA. . . . . . ;
Hf YES and you ticked Q4 box i) the application J i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
may be made and is assessable against the Wild area of agriculture in a HPA (see Guide 27); or
Rivers Code. If YES and you ficked Q4 box ii vey . . .
the application will not be accepted. ia ii) in a HPA outside a registered area of agriculture?
Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
Page 11Section 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20,2 April 2007 °
Works in tidal areas, coastal 5. Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
management districts and fish habitat Development in a wild river area
Pp
areas
H you answered YES to Q5, and ticked any O NO O YES
boxes in Q6), your application is required to be oo, .
assessed against and must comply with the Wild) 6. The application is for one or more of the following:
ers ec. . . . , . . .
t you answered YES to 05 and ticked box in (J i) Operational works that is tidal works or works in a coastal management district (ensure you
Q6, your application is required to be referred to have completed Part M and/or Part P of Form 1), or
the EPA, + . . :
Note: I specified works are proposed in a loca CL] ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
government area, it is prescribed tidal work — the completed Part O2 of Form 1), or
ascosement henager with the EPA as a (J ili) Building or operational works in a fish habitat area (ensure you have completed Part O2 af Form 4).
relevant local govemment will be the Pa ag ‘ : A
concurrence agency
{f you answered YES to Q5, and ticked box ii} or
ii) in Q6, your application requires referral to
OPIF.
If you answered NO to Q5 and ticked box |) in
Q6, the application will not be accepted.
if you answered NO to Q5, ticked bax ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.
If you answered NO at Q6 and ticked box fii) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27 ;
Residential, commercial or industrial |7, Is the application for residential, commercial or industrial development in a designated urban
development area?
lf you answered YES to Q7, your application is
Not subject to wild river requirements. Provided L NO LJ YES
there are no other aspects of this development
that require assessment against the relevant wild| 8 {f NO, does the application for residential, commercial or industrial ent involve:
river declaration or Wild Rivers Code, you do not . } pplicat esidential, ercial or industrial developm one.
need to complete the remaining questions in CO i) a material change of use made assessable in a local government planning scheme
Section 2. (ensure you have completed Part D of Form 1); or
If you answered NO to Q7 and ticked either box ue ; . . .
i) of if) in Q8, the assessing agency is the C ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
relevant local government. The application must of Form 1).
be assessed against and must comply with the
Wild Rivers Code.
Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
Hf you answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
requires assessment against and must comply
with the Wid Rivers Code. LJNo ["] YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW.
Note: Applications for animal husbandry
activites will not be accepted if proposed in a
HPA, For more details and a definition of anima!
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Agricultural activities 10, Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
tf you answered YES to Q10, your application a PA?
requires assessment against and must comply
with the Wild Rivers Code. LINo [_] YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW.
Note: Applications for agricultural activities wu | 11. If YES is the application for:
not be accepted if propesed in a HPA. For more : . .
details and a definition of agricultural activities [_] i) a material change of use; or
2 Guide (1) ii) operational works.
see the Wild Rivers Act 2005 and refer to Guide i :
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
Page 12Section 21
. INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Works that take overland flow water | 12. Does the application involve works that take overland flow water in a HPA or an FMA?
ihe levant wd iver declaration wi stl f LJNo ["] YES (ensure you have completed Part Ks of Form 1)
self assessable or assessable, or are exempt
from wild river requirements. 13. If YES, is the application for works stated in the retevant wild river declaration to be?
H you ticked Q13 ), your application must be ‘
assessed by NRW against the Wild Rivers Code CL] i) assessable works
and must comply with the code. (_1 ii) setf-assessable works
H you ticked 013 if) an application is not required ee
to be made however the works must comply with{ {_] iii) exempt works
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
if you ticked Q13 iii) your application Is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessabte or
exempt will not be accepted.
Works that interfere with overland 14. Does the application involve works that interfere with overland flow water in a FMA?
flow water
The relevant wild river declaration wi state T) NO [] YES (ensure you have completed Part Kio of Form 1}
works that interfere with overtand flow water that . oo . oo .
are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
from wild river requirements. Oo . bl k
@ If you ticked Q15 i}, your application must be l) assessable works
assessed by NRW against the Wild Rivers Code CT] ii) self-assessable works
and must comply with the cade. "
ff you ticked Q15 fi) an application is not required LJ iii) exempt works
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an apptication
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
H you ticked Q15 ifi) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessabte or
exempt will not be accepted.
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
barrier works in a HPA will not be accepted. TL NO [] YES (ensure you have completed Part O3 of Form 1)
Applications for building or raising waterway
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
@ Aquaculture (non ERA) 17. Does the application involve aquaculture in a PA?
seed ns for aquaculture in @ HPA will not be []No [_] YES (ensure you have completed Part 0; of Form 1)
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with waterina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nominated waterway in a PA?
Note: if the development is proposed in a HPA,
applications for all works that interfere with water LC NO C] YES (ensure you have completed the relevant Part K of Form 1)
in a watercourse (including dams or weirs,
steam realignment or steam diversion) will not |49 If YES
be accepted. , oo ; ;
in a PA, applications for instream dams and LI i) The application is for an instream dam or weir; or
if you ticked box jin Q19, your application wil TC ii) The application is for operational works that interfere with water in a watercourse, and is
weirs may be accepted in nominated waterways. ttt t ‘ . . . .
not be accepted. for development other than a dam or weir.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www. niw.qlid.gov.au or contacting the
department by email on:
[email protected] 13Section 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 A\ fil 2007 * .
Environmentally relevant activities | 20. Does the application involve an ERA?
beaented ae -leabone which may be made C] NO L YES (ensure you have completed Part G of Form!)
require referral to the EPA. The assessment of
some ERAs is assessed by NRW, othershave | 21. Is the application for an ERA 20 instream?
been devolved to DPIF, NRW or delegated
local govemment (see EPA website for more {_]No (_] Yes
information on devolved ERAs)
vorolele Oe 3 Me 0. Q20 youdanotneedto 122. fs a quarry allocation notice held for the proposed ERA 20 instream?
if you answered YES to Q20 and the [No L] Yes
development is in a PA, your application must be
assessed by the administering authority?! Satta t feet 0
against the Wild Rivers Code and must comply 23. Does the application involve any of the following in a HPA?
with the code, unless the proposal is for i) a level 2 ERA 11, (and is for specified works or a residential complex)
development where an application will not be . \
accepted, or is exempt from wild river ii) an ERA 19 (dredging)
delemnine ek eppliet on il not be acceote ‘4 iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
for the development by answering’Q21 ~ Q24. the Wild Rivers Act 2005, and Environmental Protection Act 1994)
if you answered NO to Q21, you do not need to iv} an ERA 22 (out of stream)
complete Q22, If you answered YES to Q21 you
are required to complete Q22. J NO C] YES
Hf you answered NO to Q22, the application will
not be accepted. If you answered YES toQ22, | 24 Is the proposed development for ERA 20 (out of stream) and;
the application must be assessed by NRW . P FM A: and Stop ( ) 0;
against the Wild Rivers Code and must comply - ina an
will the code, — not low impact; and
is proposed in the Wena sonication will not be — not for a residential complex in the area, or for specified works. @
if d NO to Q2. devel it : . . .
application must be assessed by the EPA or Oo NO CI YES
accepted. H you answered YES to Q23, the
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
If you answered YES to 024 the application will
not be accepted. If you answered NO to 024, /
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
if the development is proposed in a designated
urban area there may be no wild fiver
requirements, See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).
Documentation - 25. Has documentation been included with the application describing how the applicant proposes to
Hf you answered NO to Q25, your application comply with the mandatory requirements, required outcomes, and/ or performance requirements
may be subject to an information request and . id Ri C
processing of the application may be delayed. as set out in the relevant part/s of the Wild Rivers Code? @
[No Cl yes
21 The administering authority may be either the EPA, or if devolved or delegated, the local govemment, DPIF or NRW.
Page 14Section 23
. INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 20, 2 April 2007
SECTION 3 - BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
schedule 2A of the IP Requlation. (IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia,
deemed refusal.
Fire safety for budget accommodation | 2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation
Reaulation building.
Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the 1P if the application involves a workplace incorporating spray painting.
Regulation
Retail meat premises 4. An-application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the IP retail meat premises.
Regulation
Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the JP involves a private health facility.
Regulation
Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
© For more information go to schedute 2 of the IP. application involves a work place area less that 2.3m2.
Requlation
Land contiguous to a State-controlled | 7. | An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the IP
Regulation
Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP application involves a childcare centre.
Requtation
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line??.
Regulation
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a heritage registered place.
Regulation
Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedule 2 of the iP concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regutation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
@ habitat area.
Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?%.
Far rnore information go to schedute 2 of the IP
Regulation
Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
For more Information go to schedule 2 of the [P involves future railway land.
Regulation
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19}, and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :
particular building work for single e for a single detached class 1 building or class 10 structure; and
detached class 1 building or class 10 e the local government has declared by resolution the following:
building or structure - the appearance of the building or structure will have an extremely adverse impact on the amenity of
For move Information go to schedule 2 table 1 of the the locality; and
{P Requlaion. —~ the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a locality
deemed approval. ‘
2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
23 Qperationa! airspace is as defined in State Planning Policy 1402 “Development in the Vicinity of Certain Airports and Aviation Facilities".
Page 15Section 24
es .
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 A oil 2007’ ,
Whether particular buildings maybe | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
iP Regulation.
Assessment period 15 days. No response is a
ceemed refusal.
Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work
For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
[P Requlation. 18. An application may trigger referral to the local government as the concurrence agency if the building work
Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.
deemed refusal, 19. An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.
Fire safety in particular budget 20. An application may trigger referral to the local govemment as the concurrence agency to determine the
accommodation buildings building wil! comply with the fire safety standard under the Building Act 1975 when the building work has
For more information go to schedule 2 table 1 of the been completed.
IP Regulation.
Assessment period 15 days. No response is a
deemed refusal,
Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
services building work
For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
IP Requlation and the QDC part 15. * — the work does not comply with an acceptable solution stated in the part.
Assessment period 15 days, No response is a
deemed refusal.
Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential
For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
IP Requtation and the QDC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days. No response is a , :
deemed refusal.
Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
rebuilding referral to the local government as the concurrence agency.
For more information go to schedule 2 table 1 of the
IP Requiation.
Assessment period 5 days. No response is a
deemed refusal.
Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the
designated rainwater tank area building work or structure complies with the relevant performance criteria if -
For more information go to schedule 2 table 1 of the e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
IP Regulation and the QDC part 25. building work, in a designated rainwater tank area; and
Assessment period 15 days. No response is a e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
deemed refusal, solution for a relevant performance criteria.
Page 16Section 25
= =
PROPOSAL REPORT : .
oo, consulting m=
Development Application pty Itd
town planners +
for urban designers
Development Approval for Material Change of Use
of Premise for Visitor Accommodation - Type 4
Conventional (visitor hostel)
for
Sunshine Beach Constructions P/L ATF The Village
¢ Way Unit Trust
ew, p ty i
ic Ae
} — | Z
— i=)
7 he
Situated at
162 Edward Street & 1 Hill Street, Sunshine Beach and described as Lots
106 & 107 on RP 94566 Parish of Weyba, County of March
Prepared: August 2007 RO0856-01-A
SUNSHINE COAST OFFICE GYMPIE OFFICE
1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE PO BOX 391 GYMPIE Q 4570
TELEPHONE 07 54555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 54824952
[email protected] [email protected]Section 26
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at } Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
Contents
1 Pvt Uti oc ccccccccsssssssscssesssssssssssssccuseesssvenssueessoueessnececcaeessuvecsaneessaseessevessne
2 Basic Wforrm ation oc cciscccsssesessseesssssssscessveesssesssvessetssseesesassenessatessatesseees 3
3 The Characteristics of The Site oc licccssssescsuteccssecsssecesseceesscesesneee
3.1 Site Characteristics occ ceceececeeceseeccssessescecssecseseceeecesaecsssersasesessrsssevenees ce
3.2 Existing Infrastructure Servicing the Site 4
4 The Characteristics of the Surrounding Environment... ii‘ tS
4.1 Description of Land Uses Adjacent to the Site and within the Surrounding Area, 5
5 THE Proposal ooo cccccsssssssssssssssescssssssessssssssessscsssscsssessssecsessuuseensssantecensansesesssenee®
5.1 Building Design and Siting [email protected] Intent of Landscaping and Other Associated Development Works. 7
6 Development Assessment ooo ccccccssscessccsssscsssecesesesuvessssueesessnectsscsesseneeeess 8
6.1 Applicable Codes
6.1.1 Minimum Vehicle Parking Requirements ce ccecceccececeseccteeceeseeeeeeeee 8
6.2 Overlays and State Planning Policies.
6.3 Overall Outcomes for the Eastern Beaches Locality.
POX cc ccccaeccsssecssnsesssseessosssssssessusesssseessseessussscasersussssseneveccevenseversutescassseceseseeesneeene U4
Appendix A: Location Map
Appendix B: Development Plans for the Proposal
Appendix C: Eastern Beaches Locality Code
Appendix D: Visitor Accommodation Code
@ Appendix E: Landscaping Code
#y |
Re martoo consulting - Town Planning + Urban Design Consultants 1Section 27
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Sereet & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
1 Introduction
This planning report has been prepared for Sunshine Beach Constructions Pty Ltd ATF The Village
Way Unit Trust being the applicant of a development application proposing a Material Change of Use
of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) over premises located
at 162 Edward Street & 1 Hill Street, Sunshine Beach.
The subject site is described as Lots 106 & 107 on RP 94566, Parish of Weyba and is within the
Noosa Shire.
The proposed development of this site constitutes ‘development’ as defined by Section 1.3.2 of the
Integrated Planning Act 1997. This development application seeks a Development Permit for a
Material Change of Use of Premises for Visitor Accommodation — Type 4 Conventional.
The proposa! is deemed a code assessable development under the provisions of the Noosa Plan
2006 and the Integrated Planning Act 1997.
This planning report covers the following matters in order to assist the assessment of this
development application:
¢ Section 2: The basic details of the application as extracted from certain parts of the
@ application forms;
* Section 3: Adescription of the subject site;
* Section 4: A brief description of the locality surrounding the subject site;
* Section 5: An explanation of the proposal;
¢ Section6: An assessment of the proposal against the 2006 Noosa Plan; and
* Section 7: A conclusion that provides summary grounds, which support the approval of the
application as proposed.
The Noosa Council is the Assessment Manager for this development application.
Any words or terms are shown in italic font in this proposal report, refer to either relevant state
legislation direct quotes from this planning scheme as indicated. Words in bold font refer to
definitions as detailed by the Noosa Plan.
te
{2 martoo consulting - Town Planning + Urban Design Consultants 2 |Section 28
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
2 Basic Information
Basic information relating to this development application includes:
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
C/- Martoo Consulting
PO Box 1684, Noosa Heads Qld 4567
Address of Site: 162 Edward Street & 1 Hill Street, Sunshine Beach
RPD of Site: Lots 106 & 107 on RP 94566, Parish of Weyba
Owners: | & B Sellars
Area of Site: 1032m? (526m? + 506m’)
Current Use of Site: Vacant
Land Use Zonings: Semi-Attached Housing
Strategic Area: Urban
Overlays: N/A
Proposal: Visitor Accommodation — Type 4 Conventional
Approvals Sought: Development Permit for Material Change of Use of Premises
@ Administering
Authority: Noosa Council
Referral Agencies: Nil
Existing Easements: Nil
Consultants for
development
application: Town Planners: Martoo Consulting Pty Ltd
Building Designer: Residential Design Studio
ey
22 martoo consulting - Town Planning + Urban Design Consultants 3 |Section 29
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
3 The Characteristics of The Site
3.1 Site Characteristics
The subject site is comprises two irregular shaped allotments located at the intersection of David Low
Way and Hill Street. A map showing its location is included in Appendix A of this report.
The subject site slopes upwards away from the road frontage. This slope is generally consistent and
contains a rise of approximately 3.6 metres. Given the site is currently vacant; it appears that the
ground levels are consistent with those in existence on the first day of survey. A scattering of native
and exotic vegetation is located across the site. The following photographs clearly detail the current
site characteristics.
: SS sais — ha ie ey ee. ‘ - Cs 4.2 tot Me RS ee
‘ Le ehh ae of ; ; Sane | - ra
F re ie 3 a | re > EP a : Seda So Sy rar . Yip
ie. - gt ler +k ae aoe = P “AS TWh vie 4 A Fig.
Lg tia kee, | a ves - i ae ae
oh . Pia oe ok” : aoe ve 7 - 4 J
4 Er ie 4 at) EG
Spee” ee eet -—
€ ae a Sy va
rs x b i my =" ; ) cS oe ge: >. e - ~- sant . Ka
3 ' intl — ‘ - 0 ae pee * “Te
°* Yate - . bs - 2 : ot P ‘git mi oi x +
ae nee) ee > ae eS - 3 oe Oa ee aw >.
yon test SI eal os <tr en 0 ES ee ae —
Ba Mp eS , — 1, a eee ah v2
y- As aii ‘ : My mS x 7 * 2 s - san OR ee ae a 4 t vk
. = - ~~ Pe < Ce = . at os pes, ee a. ss ps" on ye
oo Oe ke SE ee Oe OEE
Photograph 1 — 7 Hill Street Photograph 2 - 162 Edward Street
3.2 Existing Infrastructure Servicing the Site
The subject site is serviced by standard community infrastructure including reticulated water supply
and sewerage, underground telecommunications, underground electricity supply and street lighting.
The subject site fronts a one-way service road, which links Wildflower Street to Hill Street. This
service road provides allotment access for a total of three sites; the two subject allotments and the
© adjoining northern allotment. As can be seen in the following images this road is constructed to a
bitumen standard, with kerb or channel provided along the western edge.
;
{ re ae
i . - os Fe ei ace. =e = ——
a ? ee oy : ‘ =
noe zee Pee a) ‘ss an
ae a : ri aT cae 5 a ad
Photograph 3 — Looking towards Hill Street Photograph 4 - Looking towards Wildflower Street
a.
%!2 martoo consulting - Town Planning + Urban Design Consultants 4Section 30
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
4 The Characteristics of the Surrounding Environment
4.1. Description of Land Uses Adjacent to the Site and within the
Surrounding Area
Land uses in the locality are characterised by a mixture of older style and recently constructed
detached houses, duplexes and multi-residential developments. Almost all surrounding development
is two storeys in height.
The adjoining parcels of land have the following uses:
e North east (adjoining): Older Style Detached House
e East (adjoining): Older Style Detached House
e North (rear): Vacant
‘ es aan PONTE RoR es ROIS OO ns
Th 4 TTY A -? A oS, gate 4 LS a eas ait a s, me
€ 1 - Ty ei rae Dee og sia keels
1 A Pees, ’ =e ie gi : : a. ae Oe ee ee
era Tl ume eee Bak: re ta a
ay ae a ; ' reS Se take aa he it “eae <a iFs
; a ~ Saas mens 3 oe e i - ae seca a in
. La . af ks wt Sy a ee >. "2. be - Peart SS o* “a =|
: Airey oe ; We ar Ey 4 mat nd Ee
ae Ar he are a x eas Pe eee
||. is e : rs
oo nn aaa ee ? a : ae "
ee en ig
es = « - =. = ‘
o Bit - S sng —_ 2 See ~ <i =~
Detached Dwelling to the north-east Detached House to east
Although the subject site is currently surrounded by older style detached dwellings, it is noted that the
site is located within a precinct zoned for duplex development. In this regard, a number of premises
fronting both Hill Street and Wildflower Street have been previously developed for multi-residential
premises and/or duplexes. Accordingly, it is considered that both Hill Street and Wildflower Street are
= deemed to have capacity for higher density development.
Further, given the sites proximity to David Low Way and the scattered coastal landscaping (ie.
banksias) located within the road reserve, it is considered that the subject site and adjoining premises
are adversely impacted upon by vehicle noise generation.
Ay < , ». 7 fs J . s sd
MoS. DN may < Fre Bi ‘A
Sour. YS ~~’ ! Pat) te” °
% eee ,. eit: tae 7)
Stl fits “4 Renee ie eR
a ees F- ad A le a hme LA
~~ mM, ITY Th ‘ a, Ray ;% R ; EEL 4d
» OUTS ae a Ae Oe?
OS Pee i \ jl el a va , “4
> wc ee es
Detached Housing becker elk Se a Rowse i ten i am
Semi-Attached Housing Sa. 3 y f CC ‘
Attached Housing > a RSS See
Visitor Mixed Use Beret ie BH LESS elena
Neighbourhood Centre pee sas ee ares of ENS “S-
Community Services Dm i cca, laces . : OE STILE EROS is
|Rural Settlement sini om ag i LARS SO RE
cee Seed arate Mame =
open Space Conservation ee i a E =
Multi-Residential Development in Wildflower Street
"282 martoo consulting - Town Planning + Urban Design Consultants 5Section 31
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
5 The Proposal
As indicated in Section 1 of this report, this application proposes the construction of Visitor
Accommodation - Type 4 Conventional (Visitor Hoste)).
The material change of use of premises is impact assessable development under the 2006 Noosa
Plan. Residential Design Studio has prepared proposal plans for the development, which are
included in Appendix B.
5.1 Building Design and Siting
The proposed Visitor Hostel comprises the following elements:
Lower Level
o 7 bedrooms designed to each cater for a maximum of 4 persons;
o 2 bedrooms designed to each cater for a maximum of 2 persons. Each of these
rooms is provided with ensuite facilities;
o Male and Female bathroom facilities;
@ © Communal laundry facilities:
o Formal entry and reception area;
© Information display area;
o Open terrace dining area;
o Open air recreation facilities including a swimming pool.
Upper Level
o 6 bedrooms designed to each cater for a maximum of 4 persons;
o Male and Female bathroom facilities;
o Common room comprising communal cooking, dining and entertainment facilities.
Vehicle access for visitors is provided by a dedicated driveway leading from the David Low Way
service road. This driveway is located towards the south-eastern corner of the site and provides
access to five (5) vehicle parking spaces. A separate pedestrian access way is provided adjacent to
this driveway.
Vehicle access for the staff member is provided by a dedicated driveway leading from the David Low
Way service road. This driveway is located towards the south-western corner of the site and provides
@ access to a single parking space and manoeuvring area. This entry way and car space will be
signposted and line marked to indicate it use for ‘staff parking only’.
It is noted that the building designer has taken great care to ensure the noise generating elements of
the proposal are located away from the side and rear property boundaries and are orientated towards
the David Low Way frontage. In this regard it is noted that all sleeping and washing areas are
provided towards the rear of the building, and a large landscaped setback is provided between the
proposed development and adjoining premises.
Further, the project design has utalised the slope of the site to ensure the visual impact of the
development is minimised when viewed from the side and rear premises. In this regard the lower
floor of the development has been backfilled, with high level slit windows providing natural sunlight to
this area. This design technique results in the proposal appearing as a single storey development to
the adjoining residences. This will be further off-set by the provision of a 1.8 metre high rendered
concrete block fence along the length of these boundaries.
The building adopts a contemporary design and proposes to utilise a range of high quality materials
and finishes which include:
e Painted rendered masonry walls for the lower level:
« Amixture of FC battens and weatherboard for the upper level:
aX
£82 martoo consulting - Town Planning + Urban Design Consultants 6Section 32
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at } Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
« Timber slatted balustrades; and
« Colourbond roofing.
5.2 Intent of Landscaping and Other Associated Development Works
A detailed landscaped design will be prepared in accordance with Council's relevant code at the time
of lodging a development application for operational works (landscaping). This plan will includes the
following concepts:
¢ Dense screening vegetation established along all side and rear boundaries;
* Reinstatement of the natural ground level along for significant lengths of the side and rear
property boundaries;
e Backfilling of the lower level, to reinstate natural ground levels towards the rear of the site:
e Removal of all existing vegetation across the site given its incompatibility with residential
development; and
e Provision of 1.8 metre rendered concrete block fence along all side and rear boundaries.
@ It is the applicant’s intention to use native plant species and feature plant species recommended in
the Landscape Policy. More specific softscape elements will be identified in the development
application for operational works (landscaping).
Other development works will also include building works, plumbing and drainage works, and
operational works for stormwater drainage and driveway and access construction. These works will
be the subject of detailed design and the lodgement of formal development applications to the Noosa
Council once the development permit for material change of use of premises takes effect.
The intent of these other development works includes:
* connection of the proposed Visitor Hostel into Council's reticulated sewerage system to
service the premises; and
« connection into Council reticulated including a master water meter with individual meters for
each unit.
Pd
tame martoo consulting - Town Planning + Urban Design Consultants 7Section 33
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant Sunshine Beach Constructions Pty itd ATF The Village Way Unit Trust
6 Development Assessment
The Noosa Plan includes the site in the Eastern Beaches Locality and provides the site with a Semi-
Attached Housing zone. The assessment table for the Semi-Attached Housing zone indicates that a
Visitor Accommodation - Type 4 Conventional is an inconsistent use and accordingly is impact
assessable development.
Under Section 3.5.4(2) of the integrated Planning Act 1997 an Assessment Manager therefore must
limit its assessment to only the following matters for the impact assessable component of the above
application:
(a) applicable codes (other than concurrence agency codes the assessment manager does not
apply);
(b) subject to paragraph (a) - the common material;
(c) if they are not identified in the planning scheme as being appropriately reflected in the
planning scheme:
(i) State planning policies, or parts of State planning policies;
(ii) for the planning scheme of a local government in the SEQ region; and
@ (d) if the assessment manager is an infrastructure provider - the priority infrastructure plan.
6.1 Applicable Codes
Although an impact assessable development application may be assessed against the entire
Planning Scheme, the codes identified in the Noosa Plan as being relevant to proposed development
are the:
. Eastern Beaches Locality Code;
- Visitor Accommodation Code
» Landscaping Code
+ Engineering Works Codes
A comparison of the proposal against the requirements of the Eastern Beaches Locality Code, the
Visitor Accommodation Code and the Landscaping Code is detailed in Appendix C, D and E. As
indicated above, separate applications for Operational Works Landscaping and Engineering works
will be lodged with Council. However, a brief assessment of the proposal against relevant provisions
@ of the Driveways and Carparking Cade is provided below:
6.1.1 Minimum Vehicle Parking Requirements
Type 4 Conventional- _ For Visitor Hostel
1 space per 12 guests capable of being accommodated; AND
1 space per staff member; AND
Parking for a courtesy shuttie bus (no greater than 30 seats).
A total of 56 persons are able to be accommodated on site. This equates to a demand for 5 vehicle
parking spaces. A total of 1 staff member is proposed to be present on site at any one time.
Accordingly the applicant has provided 6 on-site parking spaces.
The applicant intends to provide a courtesy shuttle bus service. Given the constraints of entering and
exiting the site in a forward direction for this vehicle type, it is proposed to construct a parking bay
within the service road reserve. As this road caters for 3 allotments only (2 of which comprise the
subject site), it is considered that this parking area will not adversely impact upon the operational
safety or streetscape amenity of the existing roadway.
er
2% martoo consulting - Town Planning + Urban Design Consultants 8Section 34
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional {Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicanc Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
During a pre-lodgement meeting held with Council staff, the issue of ‘Wicked’ vans was identified.
Discussions with existing hostel operators within both Sunshine Beach and Noosa Heads have
confirmed that it is highly unusual for backpackers with transport to utilise a visitor hostel. In fact it is
noted that the primary attraction of vans is to enable backpackers not to pay for hostel
accommodation, instead allowing them to sleep within the vans themselves. A recent inspection of a
number of Wicked vans confirms that they are utalised for overnight accommodation.
6.2 Overlays & State Planning Policies
No overlay maps are applicable to the subject site. No adopted State Planning Policies are triggered
by the development application.
6.3 Overall Outcomes for the Eastern Beaches Locality
As the proposed development is an inconsistent use over the subject site, following is an assessment
of the proposal against the Overall Outcomes for the Eastern Beaches Locality.
a) New uses and works are located, designed and managed to-
i) be compatible with other uses and works;
@ ii) maintain the safety of people and works;
ii) avoid significant adverse impacts on the amenity enjoyed by users of other premises,
including acoustic and visual qualities;
iv) avoid significant adverse impacts on the natural environment, including native habitat
removal, fragmentation and attrition; and
v) protect the natural beach experience and overall visual amenity for beach users.
v The subject site is considered to be an appropriate location for the establishment of a visitor
hoste! as the following points are noted:
¢ The Noosa Plan identifies a number of Sunshine Beach sites zoned Semi-Attached
Housing for the establishment of visitor hostels. Accordingly it is surmised that
Council considers this zoning to be appropriate for the establishment of these uses.
*+ The Wildflower Street sites nominated within The Noosa Plan for the establishment
of a visitor hostel have been recently approved and/or developed for duplex uses.
Further the proximity of these sites to the Duke Street shopping precinct and
Sunshine Beach precludes their financial viability for the development of low-cost
accommodation.
* The subject sites are well located for the establishment of low cost accommodation,
@ as the residential amenity of this location is compromised by their proximity to the
David Low Way. Accordingly, the financial viability for housing development is
reduced.
* The project designer has configured the proposed visitor hostel to ensure the
acoustic environment of the surrounding residents is not adversely impacted. In this
regard all noise generating activities are oriented towards the road frontage, and all
sleeping and washing quarters are located towards the side and rear boundaries.
Further the large setbacks and dense landscaping between the proposed
development and adjoining users ensures the use will be compatible with the
adjoining residences.
+ The backfilling of the rear portion of the allotment ensures the proposed development
utilises the subject site conditions to address potential concerns regarding acoustic
nuisance. Further, this treatment also reduces the visual bulk of the development
when viewed from the adjoining rear premises.
+ As previously detailed, the subject site fronts a service road which provides access
only to another single allotment. Further, discussions with backpacker operators in
Noosa Heads and Sunshine Beach confirm that almost all travelers access this site
via public transport or courtesy shuttle bus. Accordingly it not considered that the
proposal will significantly increase the vehicle traffic using the service road, and
accordingly the safety of this environment is protected.
es |
22@ martoo consulting - Town Planning + Urban Design Consultants 9Section 35
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Villoge Way Unit Trust
* The subject site does not contain significant vegetation which is considered to be
worthy of retention. It is noted that the applicant intends to establish dense native
vegetation screens along all side and rear boundaries.
- Given the site’s proximity to David Low Way, it is not considered that the visual
amenity or beach experience will be impacted by the development. Nonetheless, it is
noted that given the high property prices of Sunshine Beach, it is unlikely that a low-
cost accommodation facility will be developed elsewhere in the area. The subject
site is located approximately 700 metres from the Duke Street shopping precinct, and
accordingly provides excellent accessibility to these facility whilst still ensuring the
feasibility of the project.
b) The Eastern Beaches Locality retains its primary role as a residential area, though continues
to provide some visitor accommodation and a range of local retail and commercial functions
at Sunshine each, Sunrise Beach and Peregian Beach;
¥ The proposal ensures the residential characteristics of the immediate locality are retained.
However it further provides a low-cost accommodation alternative within close proximity to
the Sunshine Beach centre, which given current property prices would not be able to be
provided elsewhere.
@ c) The scale and form of buildings and other structures are —
i) designed to be responsive to the informal beachside character of the locality, being
low rise buildings, with pitched or curved roofs and building materials that blend with
the dunes and coastal landscape;
ii) in keeping with the surrounding streetscape and landscape qualities;
fii) integrated into the topography and native vegetation of the dune system which
dominates the locality; and
iv) consistent with the amenity and safety expectations of the community.
v Given the slope of the site away from adjoining residences towards the David Low Way, the _
proposed development will present a low rise built form. The project designer has
incorporated design elements consistent with the beachside character of Sunshine Beach
including pitched roof forms, visual interest elements and open entertaining spaces. All these
features have been addressed with up most consideration to the acoustic and residential
amenity of the adjoining premises. As detailed previously, dense landscaping will be
provided along the side and rear boundaries of the site to both ensure the acoustic and visual
privacy of adjoining uses, but to assist with the developments integration into the vegetated
character of Sunshine Beach.
d) Residential development is characterised by-
@ i) low impact buildings of a domestic scale within densely landscaped settings;
ii) building designs that are well articulated and that use design elements, materials that
respect the coastal landscape character;
iii) building designs that avoid hard lines and boxy shapes characteristic of
Mediterranean / Tuscan influenced design;
v As detailed previously, the slope of the site away from the side and rear boundaries, ensures
the proposed development presents as a low-rise form. Further, the considerable side and
rear boundary setbacks, and the provision of dense landscaping within these ensures that the
building is placed with a landscaped setting consistent with the existing character of Sunshine
Beach. The building design reflects the casual nature of the locality through the incorporation
of elements such as pitched roofing, semi-indoor / outdoor spaces and open recreation
areas.
e) Emphasis is placed on the protection and retention of low cost accommodation consistent
with maintaining a diversity of accommodation types for visitors to the locality;
v The subject site is considered uniquely placed to be able to address this Overall Outcome. In
this regard it is noted that the site is located approximately 800 metres from Duke Street,
thereby providing excellent accessibility to both the shopping, entertainment and recreation
centre of Sunshine Beach. A brief review of the recent real estate sales within an 800 metre
#
Ri martoo consulting - Town Planning + Urban Design Consultants 10Section 36
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
radius of Duke Street reveals that it would not be economically feasible to establish low-cost
accommodation facilities on any other property other than the subject sites.
) Vegetated views from the beach and David Low Way are protected from the potential impacts
of development;
ve The subject site is well setback from the main thoroughfare of David Low Way. The applicant
does not seek to remove any existing vegetation located within the wide road reserve.
Further, dense vegetation is located along the side and rear property boundaries, ensuring
the development sits within a landscaped setting
ee Ti 5 my oil Ss Baer Be ONS
. seed Vs ph Ae: ae 4: *S-
e ee Ek ba kn rit Ie ge e
Lg ks, {1 Weegee Lays
Pye See hen ne ies Ba
. *,* 3 Ae ‘ A . we te iv A és \ - x
mae iq, de Foy = Diss 7 BS au YY RE. re “ <
ie * eee ns pee ales Bas [5 ia 4 is ;
2, il : aad eS; 3 4 3 <a $F aie ~ \ Ti ‘* ’
es Ye ad OY ee a i ee Pe < ~ - Say 4 :. 7
- ‘i 8 a a ay aS re a
bis * <i i 3 ") Pe : pee t ra
& OM * a 4 E. : os hago) { ’
ri 3 ” «a i aS a . hal " - | i 5 4 . r
= Aa x t 3 ‘ A ~; , ~ : | 4 ‘ r
: oa mH ly aa a |
eat tp ee cd
= . ze Se a 2 > ia nas RRA ae Fitter pies a a ans 3
Ei . — r
¢ eect Wi Mae ME mere Se sR a a a
eee ‘ MOR ail CAME acy. eee DEAS a areel a 7
2 ot ns Pies * 5 PRES SEE AO are Oe ae
hima tees: Rie ie PM, Asteg gee a eke s vs Pe <. nn aes “a
ee , : ior s eae.
E yin ; . — : See
PEs ¢ ee ae = , Pca... FO A og ee e
ae . peer TANG oe Pn AE AN as ie
we ee io fs a # oe > y ie Rukie? SSR
eee ve mn: fates 5 7 > he ate ’ ‘ es weal .*
fois 0 ee fe Ra pes one Shadi
ee arn a oh / at | a ¥.. 2 x ) 3 >
Se For Sunshine Beach-
i) Sunshine Beach provides the highest proportion of Multiple Housing for visitors and residents
in the locality, though the scale of such developments is less than other accommodation
complexes found in Noosa Heads and Noosaville localities;
v The requirement for Sunshine Beach to support the highest proportion of multiple housing
within the Eastern Beach indicates that Council considers this area to be appropriate for the
provision of higher density accommodation types. Accordingly, the proposal is considered to
provide a use consistent with the surrounding development and infrastructure provisions.
il) development is predominantly of domestic scale and is well integrated with the natural
landform and landscape of the surrounding area;
v As detailed above, the proposal incorporates domestic design elements and large areas of
dense native vegetation. Further, the backfilling of the rear level ensures that the
development integrates well with the topographical constraints of the site.
iv) development makes a positive contribution to the amenity of the streetscape and the natural
environment;
.
52 martoo consulting - Town Planning + Urban Design Consultants 11Section 37
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visiter Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Led ATF The Village Way Unit Trust
v As detailed above, the proposal provides the hostel outdoor recreation facilities towards the
service road, thereby increasing the activity of the street frontage. Further, given that the
service road supports a total of 3 allotments (two of which form the subject site), the
development will improve the overall presentation of the streetscape. The dense native
planting proposed along the side and rear boundaries contributes to the natural environment.
roa
Ee martoo consulting - Town Planning + Urban Design Consultants 12
eeeseeseseFeseseseFesSeFSection 38
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional {Visiter Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant: Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
7 Conclusion
The above development application has been submitted to Noosa Council as the Assessment
Manager of the application under the Integrated Planning Act 1997. This application seeks a
Development Permit for a Material Change of Use of Premises for a Visitor Accommodation — Type
4 Conventional which is impact assessable development under the 2006 Noosa Plan.
Although an inconsistent use on the subject site, this application can be supported on a number of
grounds as provided in detail in the above report. These grounds include:
* The proposal is consistent with the Overall Outcomes of the Eastern Beaches Locality Code;
* The proposal is generally consistent with the relevant code requirements;
* The subject site provides a high level of accessibility to the recreation, commercial &
entertainment facilities of Sunshine Beach;
¢ The sites located on the corner of Wildflower and Hill Street which are nominated within The
Noosa Plan for the provision of a visitor hostel have been approved and/or development for high
end duplex uses. Accordingly it is considered unlikely that these sites will support this use in the
near to medium future;
@ ¢ The sites nominated for the establishment of a visitor hostel within The Noosa Plan are located
within the semi-attached housing zone, thereby indicating that Council considers this zoning to be
appropriate to support the proposed use;
* Both Wildflower Street and Hill Street support current / future duplex and multi-residential
development. Accordingly it is considered that both these roads have the capacity to support a
minor increase in vehicle movements;
¢ The David Low Way service road fronting the site, services a total of three allotments. Of these,
two comprises the subject site. Accordingly it is considered that the existing streetscape amenity
of this roadway will not be adversely impacted;
* The residential amenity of the subject site and those directly adjoining it is already significantly
impacted by the proximity of the David Low Way;
¢« The design of the proposal utilises the existing slope of the natural landform to reduce the visual
and acoustic impacts of the use upon the adjoining premises;
¢ The design of the proposal ensures all potential noise generating uses are located towards the
front and centre of the site, away from the adjoining residences;
* The design of the proposal reflects the development form sought for Sunshine Beach, through the
© incorporation of building elements such as a skillion roof, open decks and verandahs and varying
window shapes and forms;
* The proposed building materials reflect the casual seaside nature of Sunshine Beach, and are
consistent with the fabric of surrounding properties; and
* The site is uniquely placed to provide low cost visitor accommodation, as the property values of
other land within a similar proximity to Sunshine Beach are prohibitive to the establishment of a
visitor hostel.
The Assessment Manager's favourable consideration of the above development application is
therefore recommended.
#x
{222 martoo consulting - Town Planning + Urban Design Consultants 13Section 39
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Sweet & 162
Edwards Street, Sunshine Beach
Applicant Sunshine Beach Constructions Pty Ltd ATF The Villoge Way Unit Trust
Appendix A: Location Map
222 martoo consulting - Town Planning + Urban Design Consultants 14
—— TTSection 40
Z ~S NS x BOX
: Owe
XS \ Lys CX Ze
Ys D NES
ABHE 20 LO —
Ee TT ox aeSection 41
Proposal Report Proposed Material Change of Use of Premises for Visitor Accommodation - Type 4 Conventional (Visitor Hostel) at | Hill Street & 162
Edwards Street, Sunshine Beach
Applicant Sunshine Beach Constructions Pty Ltd ATF The Village Way Unit Trust
Annexures
Appendix B: Development Plans of the Proposal
#¥
ZR martoo consulting - Town Planning + Urban Design Consultants 15Section 42
DESIGN FOR THIS BUILDING HALL SE IN
ACCORDANCE WITH THE BCA DESIGN CRITERIA - _oww Legend MARK BAIN CONSTRUCTIONS tyAtd
WIND SPEED W41 N ut Ueence No. 58274
OxDen tain
AY
Fioor Areas AGT) 27 Ress Cresent,
293:
rr
Sunshine Booch, Qld. 4567
Do not scale plans, use written dimensions only. If any ee Level 41 pa, Tint ae Phone 07-5447 4443
|Site Plan i (ssts—‘—sSCiszS living area Ty Kay? Moble -— 0412 711 151
ie testssiba rake Lede Hens e
discrepancies ore found, the following must be notified deck area
RESIDENTIAL DESIGN STUDIO-PHONE 5448 9000 | 3 hevel 2 Floor Pian Level 2
living area Site Address
| S| Revel 4 Dimension Pian deck aren 67¥m2
Cut/fill indicated on plans moy vary at construction [6] bevel 2 Dimension Pian ——S—S—*
stage, & builder to adjust os required pT | Bite Sever laundry area Lots 106 & 107
Any variation at construction stage is to comply with
local building authority on earthworks/drainage fo communal kitchen area= Edwards Street,
Alt cut & fill embankments up to 1 m in height comon room area = 109m2
ore to be no grecter than 1 In 4 ho level 2 deck 52m2 Sunshine Beach
level 1 terrace
Ml retain wails and emban ents are ta com y Project
with local building authority requirements
Any retaining wall over 1 m in height must be
enghneer designed. Site Calculations ” Backpackers
Position of retaining walls & embankments may site area = 1032m2
to suit site works. g.f.a. = 412m2 (40%) Od Accomodation
T5Tm2
Floor stabs to finish a minimum of 300mm obove no. people = 56
prepored platform ievel, 225mm above finished landscape area = 335m2 (32%) 4
ground level.
Timber floor framing to finish to heights above
as shown on drawings. Real Property Description oe Drawing Title
All surfaces adjacent to buildings for a minimum Lots 106 & 107
dth of 1 m ,to be graded away from buildings Reg. Plan No. 84566
a minimum slope of 1 In 20 Parish of Weyba
evel at alignments to be In accordance with local
building authority requirements Site Plan
Owner /bullder is responsible for accuracy of cut/fil
levels
See Batu
RL 4.050
All sewage & wastewater to be discharged to local
building authority requirements.
Licensed plumber & drainer or local building
authority to prepere drainage plans. \ ‘& & wee ee ew rr $esited Botum jsrewtne | tf a
All rainwater from roof discharge to be drained to Ri 4.200
street channel or as directed by local building 7— 74
authority.
a aN Ks
YA
Ail boundary clearances shown are to verified by / Ser" Si) We dectps & orig hom
builder prior to set out & commencement of any ¥ Ae\ ZY \4 we ee ee ae ee ene ---4 2 thane pie re
constriction. \.7 24 rene be property of
It is recommended that a licensed surveyor be “sé SA etsg) ~— rin A nan Cl! fdattotion of Crees
Bl
engaged to ensure minimum setbacks are not
encroached on. na Te, i
Owner /Builder to confirm correct building allotment. er Pr N} Ping)
Builder to confirm position of all services prior to RL 0.600 yer 1 HH YH
sommencement of construction. NG C Ca)? Coe ar
F)
4]
Ve’ aT ef eta) ry
a)
Hace,
3 1 or 4)
(4
N call
a oj a
Lf
Sf RQ GED ee “B= == ‘|
AiG
il
i-
it
lo
—+--i
pane Pop ~e /> HH E
sit
RL -0700 ty
Sin, ee ey ee te ee
~~.
atid
Te
ee
Stree, Ree Batten
RL 0,000Section 43
eo GRP Q MARK BAIN CONSTRUCTIONS ptyAtd
yp p Q
Q
Ui a) Gino
i © Gatncnl iin Ueence No. 58274
gt © SARS
O i
pf pe Q 27 Ross Cresent,
fi @
eC
Ve a a Sunshine Beach, Gd. 4567
Qo
gt © Pings
rrarrnsreetrreeatorerrrya ys
tenes Sits Phone 07-5447 4443
”
2
ge Q ERC EE i iar CE Moble - 0412 7iT 151
2, PeyeIMo TACT CLL ede UE Mel OLA LEED
re!
op Q
ft o
fi 2
Yh oO
Ha th gfe MG “ey, { rendered concrete block fence ETL La AMAA AML E LE ; 4
eo 9 St
% AAI LLL ELE DL OTLEY
oe Ti Hf © Ce fe OO CD - iy WY
ai 0
i Ht 52 37 m2 A garden rye g “XO
oi P garden y
ge t 3 140 m2
gt gt 4) gt tie pp t Pp pe gb \ \\ wt ao \ 5 \\ . retaining wall J © 08 y oF Project
gt gt eo ue a Vw % ‘ 8
He on™ et \ ad B
ge ge vs qe ti tH \ VO 12-24 oxo Y (LL LLL LLL LL LL LL LLL Liddieidihivihtidilsiiissgy Y Backpackers
gt Wo
y G % N . META LLL LA LLL lll llelig | %
gg Y \ got U femde —s— L4|| mote Cc Accomodation
AL
He go % f \\ my A
ys
ge ge , Y 4 people le C33 Z
tt !
gP My g ga
iy arden
qf 12 Ne y ad ge % Y 4 people | é LATTE y y a ror] 4
2 ’ ba Y Oke Drawing Title
ge ie Bz Lhdhitbdg ede {Th femdde A, idy Y La UML LLL ph LL Z 2
0 fff Tt ULLLLA LLL LL iy
(Lea
pts % pp oe \ e Floor Plan
Z
Yi: eS y
oe “x og? i) Ac % iL Fe [LLL LLL LLL ALL EL LEAL ELLY 4 people Level 1
Ns, aC : Uhr nn FY} lo A ~ Y y >
y vA
NX klosk Z Z iy
ON Ai \% Me Z| s, Z Z
g A
feo Wet one yl 820 @ ZL Ya LELLS Up LILLE ZILIZELELELETEIELLLILY y
ber -% Milbd
Lin
a ie va 4
aN waa pl ee Ms \ y [Brewing Mo] 9237 | te8un
fe 4
<p A Ve Up
Po Oe t ee oy \s CS os ‘ Z 4 GZ
aN
QD d ex NT". AON at Ne ye g Z of DI &
a
a \- x ag A A ‘x kiosk Z 4 people y
“O ft. \-* ee as xX [Dine |] V 2 people Bs —— garden y alain
* vY nn Ve A Z
ff -~ whG \- AL YA 4:
ae A
&) ae \ - v g [EXIT] Y
Ye =
Q -< TO
O Qy “A \-" Sh Ve Ve ot VLMMMA ALLL PLL Lh gs r 12-18 ox 15-30 oxxo Z % The design & creviegs hom
4 af Ve LA WE] LEME rr LLL AD
‘a ae a3 o Om
x \- “ ay T emeemiimaaasaaaaaaats the praperty of
xy x 73, *% Z BIN STORAGE & Vendestid Omeig Studio."
Sn Y “XS WASH DOWN
“fy ms A fdatrtxtion wf these
2E
tM wo a y y
U>> Oh
Peach
5%, ont iy x5 AT th 24-18 Z reception y LILTSTPLS IDES SELES IL Mh b fa G)
a ¢ doo ZY Zhe
A A
N: ae IN ~ my a ‘ y
yy
oy Ve V22222 When
co A }5-M_oxxo I.
wee --_-_-=
i» a SS * ¢ EEO
yp aw KV of car parking
*§ 2 ms py Op» of ” y
CZ
<2; SS ad
Je
Cr * Fo -. Upper floor _over
“Lipp ~_—_——- ene me we ee oe —4
LP —
~ ey) Lop py
Lops >>
Pp
ar ez car parking
>
a
11 “td “te
oe A
4 ~ E
ig of -
.?
tf oe ‘ear parking
x
ee A
x ETT Lt dhbd bbb gh LheaecLeLieer
BED Ny, ~ee it) 14 m2 i!
Wa ~-—- tae Z
~~
ElevationsSection 44
MARK BAIN CONSTRUCTIONS
ptyAtd
OA
CN Ucence No. 58274
Tau
Breriiods
Fre Ross Cresent,
or Sunshine Beach, Old. 4567
(Akers Da rs cble - ost? 71 St
em Piet ee meet eh ee mci
ee we a nT em 4 oe”
Nee ee ee e
oY
Ves xO
“X
cA WW oF Project
ag
res retary ‘ved
gy
ie QD
we
fe % \ \ 15-30 oxo 6~6 ox 6-6 ox 6-6 ox 6-6 ox Backpackers
Ce
) \ \i F a a
\ tofy- {female i mde PS 2 Accomodation
vA % oe ‘ | 4 people
2 3
4 ® NN v7
a At a‘ i Bi ) Drawing Title
Ne
I
a a7
“Ny
(Y HTT te) Floor Plan
a\ ¥ Huts | aT} e
mB)
* tot Level 2
lee
eo Ao A
LTT
VL ARR iwrag a HTT rp (etal: f
iA Pr NX |
Y \ 6
Sy
\ oY [IIs i
=
a
Qs Ac . [exer issue)
Sy | Drawing Ko, G237
BOs ~* A 24-36 oxxo jereatne | os fat
Lays os? tt sling doc Kit | We i Date a
YY
£ EE BESET Him Scale 1:100 po
oe
nie
oe a Lt tT ta GAC
\ eX eZ oat ch a AT A2
\ Bon Yt ae |
- Lt Pa |
MIS To LF td rT The deskne & dosing thom
oe ten
Yt Ter bre prepay
coca is -p-- fdairfeutica ct these
Yt
SE CHH EEE tt fot
Ctra rir 14
Pty ye wre
|
ah Lt | common room
Pat HL
Yt
SSH co
4 | CELTS B-30 oxo TT
a =
ee aaa Eur Ia
HY
Py
pa ns
ttt
Pi
15-30 oxxo
Te
~~.
-+
~
weeSection 45
MARK BAIN CONSTRUCTIONS
td
PONS Licence No. 56274
27 Ross Cresent,
Sunshine Beach, Gd. 4567
Ta Phona 07-3447 4445
Ss SS srl EE fear agement Moble O42 710 151
Qs SS iin,
a FSS SS << ST TUTTLE - »”
lu SS) BUM | ——-—~ 4 —- ee SS ee ye od
poy PLUELELET TESTES TET
“TTF Me xO
i LUT
eA rie et | LES a
4
——— 1 Tf, | Tblataod | ii i | i ea eS SER BRI OE OS ——4 FLOR __ ge oF
FRA en PRA TO Phang WSed,
POS
oe
a
mL Lt tt de PL LL CEMUNG
—
mls
iP Project
ty Liye
K ah
é} pee
ir Wi Su fa FLOOR. a
=— a Ce UMTS -— Backpackers
Ca
Elevation A Accomodation
Roofing Wall Cladding Legend
COLORBOND CUSTOMORE AT & PITCH WO DENOTES 'HARDIES’ WEATHERBOARDS
FCH OENOTES FC SHEETING MATH 42x19mm HARDWOOD
a ee a ee A) Cl | ee Roof Trusses BATTENS AT JOINS & WINDOW
nat at | TT ays —— te ENGNEER DESIGNED ROOF TRUSSES AT PITCH pg DENOTES CEMENT RENDER TD CONCRETE. BLOCKWORK Drawing Title
——— TH SELECTED P, FINISH COUNG
=. li uy -- ES = = 4 Po ms ee ee ee aa a a Se ee eee Elevations
HU a
we HR eee HT | = | de ety US —<——— me af RY 2m
tig aye
Fea S_ ---81° pee ty wee ee Pe ee KE Ma & >
eee HH ee ee eee of —-——-——-————— — — -— Ses
Bae —-—-- Ce
a — een ee = — ee ee eRe
ee Re ee eee ee ee ee ee ee
oF ATUL —— in CALLING [orming no] car |resus
| ‘er
me ee a ee ef eh ee ee ee jae ee ee fe XT ---- e+e fe eee ee je te ee te a a ee eam ft
~~
Elevation B 40/8/2006
Scale
UNA & Genk thon
eta we coyigiiod
the property of
on ———s fi Pentterttid Ovnkgi Shidio.
SS Paitin of them
CEILING 1 SPECTER TEA Teh
SSS Ar
—- SS a i. ad | = - J FRE HH awe ee ee ee ee 3 —--—-—-—-—
(1 ~~ eee ee pT ALTE HH SieJ
Ul
FLOOR UI t pat’
Lb om
I ee ee [=F ae eee ee eee ee 8 eee
-
Te
Elevation D Taree
ye
> CES CS
ed Yin,
iZ >
bea
LTTE bo iS af ao ee ee 8 a a ee an pe ee ee
mee we ee a a a a ae ee eo ont CT = ‘a wf A) COUNG
ee oe
ie pagel { oles
ve
a’ tg be By Br eee ory Sa pa daa _— = _— ~_—
wg PE eet
ey a side dignnen
—
Ae He eee oh gored we a eee
—e ee — 4 — ee ee ea ee —e eee eee we ewe Ee EE eH a ee be ee SE EE
Too “GS om ———- — we a re eee ee
Bey —_——
pee
[yy pa TN {> __\\ fy nen a
fL__t\ _X\ poh ff tN ONS —-ebew eee ne errr nner
it ft tT ie aT — i 1 a a Lt iT 1a
Se ee ot = i “al —
ieee eet hee od a ————S recent nal
~~~ ef ES a i= = TE —_] [f= — +4 a ee ee ae a eh ee a me aw FR ee ee
evatio UySection 46
<>
aN
SS
>
S>
oe ee > >
Pe >
Ye >
S>
wo SS
Sa aoe!
oa)
oS
—eefN Wes
va
- \- \ =
%
nN ob,
fy SS \
Le > 0 > >
<>
S>
os a >
>
> > WA ov
\ 7 >
>
\.
cS my
Ve % CU oe \ > >
-& 5
=
y \\ <<
>
Ny) >
iy \\ Ne SS
S “oe
i Ry Why We" “ cS S
Sy SS
S cS
iy SS
y
iy aS
>
N S>
Ny =
Ny ~ = = 2 oe i Ye
sy S cS
S >
hy
SY
ae
N
S KS
S SS
Ry ESSE ES SS a
Ry
&
7 C3 SS
<>
a ~~, <=
N
SS Ss
N “Hh
N
8
S RY
S TN S
Ry S
Ay Corrs SY
S
S N S
S
Ay a N 1810 (ft ei | N “ S S
Ny S
Ry
y Ny N TN S
S Pt [WN SSS SEEN een S
ny up N N S
S
iy
S >
S po N aN S
y 3580 S>
y N N S
Sy
S
y >
S N >
S>
/ “Sa y N N N
peep N
N
Sy N N
N N
6120 N N
N
N N
fi N SoES SSSI] RSS SSS X N
i | 3700 NSS N N N
N
N N N=
N S N N NS
N
N N N IN N
ENS SSRERNS NER Ssomaans N
SSS N
LE N N
N
N
ESS Sa Samia No
N / N N
Ss ao ’ N N
N - N N
N
N 8
N N
N
N N
NS N N N
TL N
3700 3700 N 3700 \ N
a —----—-— N
N N
N N a N
8
S N N
N N
N N N
¢ N SY ANRAARARRAAAAAAAARAAAARRAARAR 2. Sg SS) N
8 g g 2 N N | sos N
N
hig i i i i N N | N
N seta!
N N
N
N N N
N N
hing
N N
BESS SSS SESS SSE SESS SSSA EES A AD A SNS ASSN NSS SSS SSS SANSA S SSS AANA AANA SENS SNA AA NDNA NANA SONOS NA ONES SSN NNN ANN NE ROSAS NNR SS NNN ANS SSNS SOON SPADA ASA SSS SSSA A ANSON SSAA NSS RSA SS
1800mm high rendered concrete block fence
O iy
iza;
Ht BG 3
key
it rm
i o 9
ii Oo 3 00 %
*& qo @ oR
=_i
|i a U
ge
I me SE
un
“eeSection 47
MARK BAIN CONSTRUCTIONS
tyAtd
Rats Ucence No. 58274
On
RY
27 Ross Cresent,
Sunshine Booch, Gid. 4567
hy
IT Phone 07-3447 4445
mM he
porn Mobile - 0412 7it 151
a“ em men ee ee ee eee a
“N rd
ye “C i710 xO
wo
“N ME » 2° Project
war
ee se Ve
ee
EE
ae
Mo Cael : es, — Backpackers
HO TRS ee
Nae | Accomodation
“ft AS ‘ - ] 8
\ aN sis Drawing Title
\
i. “ ar
S Ver TT Floor Plan
Y
\ ‘\ 4s A Wht 10360 Level 2
Ya
% o-
VoN a7k LT PLY
YA
AN
AC YA C- [Pemwing No] 6237
wh car_[eo
\e, Ve ‘ WW, ~_ _s 10820 janectn |e fat
me ‘% ge Date
a1
ee
Ye EEN, 2 ie
yor Ny Wwe ae iy ja
L
“A 4] The desire &
Vf © these plane are copyrighted
1} _— the property af
oe fF fdatrtaticn of Howe
'}
I} 9820
ly
‘AN 1}
1}
an
eo
Lo
Lj]
Li
4200 1000
ee ee
meeThe text continues on section 48.
Used in these records
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
The download may take up to a minute.