INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Versidh 20, 2 April 2007
State-controtled road matters 2. The application involves: (tick applicable boxes)
For more information refer to Guide 3, [J (i) development on land contiguous? to a State controlled road and for -
Unless you answered "none of the above" fo Q2, . . .
the application triggers referral to the Department (_J (a) material change of use assessable against the planning scheme;
Fe eee antes ice (7) (b) reconfiguring a lot unless -
agency, while in other circumstances DMR will e the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2 of the IP Regulation will assist you to . . , . .
“ole ning where DMR an aiiceor [J (c) operational work {not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a fot mentioned in (b) above)—
* associated with access to a State-controlled road; or
e for filling or excavation; or
¢ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (i) development on land not contiguous to a State-controlled road and -
(J (a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
[7] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
[1 (c) operational work (not associated with a material change of use assessable against ~@
planning scheme or reconfiguring @ lot mentioned in (b) above}-
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EX (ili) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. CL) (i) material change of use —
Unless you answered “none of the above" to Q3, . . .
the application requires assessment by the (a) assessable against the planning scheme;
Oepartment of Natura! Resources and Water {b) on alot containing _
(NRW).
ff an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa e if there is no property map of assessable vegetation for the lot - remnant vegetation:
concurrence agency forthe application in relation (c) where the existing use of the land is a rural or environmental use; and
IF you ticked Q3() or (i), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Teferral to NRW for assessment regardless of | (ii) reconfiguring a lot —
whether vegetation clearing is proposed or not. ,
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; ©
(b} where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(3) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
CJ (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
EX (iv) none of the above.
Strategic port land 4. The application involves:
Irosboed te, ve ae ist [J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
you ticked (i) - the relevant Port Authority is the .
assessment manager for the application. Act) complete Part | of Form 1
if you ticked (4) Queensland Transport is a C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. TI Act for the strategic port tand - complete Part | of Form 1
EX (iii) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015ECF3.001.pdfRelated documentPublic source context ↗
07/1685 - MCU - Visitor Accom. Type 4 - Visitor Hostel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.