Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

0015ECF3.001

of 79

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                          IDAS Assessment Checklist, Versidh 20, 2 April 2007
 State-controtled road matters           2.   The application involves: (tick applicable boxes)
 For more information refer to Guide 3,       [J (i)   development on land contiguous? to a State controlled road and for -
 Unless you answered "none of the above" fo Q2,                      .                                  .             .
 the application triggers referral to the Department  (_J (a) material change of use assessable against the planning scheme;
 Fe eee                 antes      ice                (7) (b) reconfiguring a lot unless -
 agency, while in other circumstances DMR will                e the total number of lots is not increased; and
 be a concurrence agency.                                     « the total number of lots abutting the State-controlled road is not increased;
 Schedule 2 of the IP Regulation will assist you to                   .                     .     ,         .                              .
 “ole ning where DMR an aiiceor                        [J (c) operational work {not associated with a material change of use assessable against the
 concurrence agency for the application.                      planning scheme or reconfiguring a fot mentioned in (b) above)—
                                                              * associated with access to a State-controlled road; or
                                                              e for filling or excavation; or
                                                              ¢ involving the redirection or intensification of site stormwater from the land, through a
                                                                pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                State-controlled road.
                                              (1 (i) development on land not contiguous to a State-controlled road and -
                                                       (J (a) material change of use -
                                                             « assessable against the local government's planning scheme; and
                                                             « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                that schedule;
                                                       [7] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
                                                               and exceeding the thresholds set by that schedule;
                                                       [1 (c) operational work (not associated with a material change of use assessable against ~@
                                                               planning scheme or reconfiguring @ lot mentioned in (b) above}-
                                                             * assessable against the local government's planning scheme; and
                                                             ¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                that schedule.
                                              EX (ili) none of the above
 Clearing vegetation                     3.   The application involves: (tick applicable box/es)
 For more information refer to Guide 12.      CL) (i) material change of use —
 Unless you answered “none of the above" to Q3,                              .             .           .
 the application requires assessment by the             (a)  assessable against the planning scheme;
Oepartment of Natura! Resources and Water               {b) on alot containing _
 (NRW).
 ff an agency other than NRW is the assessment               * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
 manager for the application, NRWisa                         e if there is no property map of assessable vegetation for the lot - remnant vegetation:
concurrence agency forthe application in relation       (c)  where the existing use of the land is a rural or environmental use; and
 IF you ticked Q3() or (i), your application requires   (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
 Teferral to NRW for assessment regardless of   | (ii)  reconfiguring a lot —
 whether vegetation clearing is proposed or not.                            ,
                                                       (a)   on alot containing a category 1, 2 or 3 area shown on a property map of
                                                             assessable vegetation or, if there is no property map of assessable vegetation for
                                                             the lot, remnant vegetation;                                                        ©
                                                        (b}  where the size of the lot before the reconfiguration is 2 hectares or larger;
                                                        (c)  where 2 or more lots are created; and
                                                        (3)  where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                              CJ (iii)  operational work -
                                                        (a)  for the clearing of native vegetation where the vegetation clearing is made
                                                             assessable under Schedule 8 of the IPA; and
                                                        (b)  not associated with a material change of use assessable against the planning
                                                             scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
                                                             Form 1
                                              EX (iv)   none of the above.
  Strategic port land                    4.   The application involves:
  Irosboed    te,   ve ae ist                 [J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
   you ticked (i) - the relevant Port Authority is the     .
  assessment manager for the application.            Act)   complete Part | of Form 1
 if you ticked (4) Queensland Transport is a  C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
  concurrence agency for the application.             TI Act for the strategic port tand - complete Part | of Form 1
                                              EX (iii) none of the above

 4  Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
    controlled road.
                                                                             Page 2

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015ECF3.001.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.