Council archive · source document
0015ECF3.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
. INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Works that take overland flow water | 12. Does the application involve works that take overland flow water in a HPA or an FMA?
ihe levant wd iver declaration wi stl f LJNo ["] YES (ensure you have completed Part Ks of Form 1)
self assessable or assessable, or are exempt
from wild river requirements. 13. If YES, is the application for works stated in the retevant wild river declaration to be?
H you ticked Q13 ), your application must be ‘
assessed by NRW against the Wild Rivers Code CL] i) assessable works
and must comply with the code. (_1 ii) setf-assessable works
H you ticked 013 if) an application is not required ee
to be made however the works must comply with{ {_] iii) exempt works
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
if you ticked Q13 iii) your application Is not
subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessabte or
exempt will not be accepted.
Works that interfere with overland 14. Does the application involve works that interfere with overland flow water in a FMA?
flow water
The relevant wild river declaration wi state T) NO [] YES (ensure you have completed Part Kio of Form 1}
works that interfere with overtand flow water that . oo . oo .
are either self assessable, assessable or exempt} 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
from wild river requirements. Oo . bl k
@ If you ticked Q15 i}, your application must be l) assessable works
assessed by NRW against the Wild Rivers Code CT] ii) self-assessable works
and must comply with the cade. "
ff you ticked Q15 fi) an application is not required LJ iii) exempt works
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an apptication
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
H you ticked Q15 ifi) your application is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessabte or
exempt will not be accepted.
Waterway barrier works 16. Does the application involve building or raising waterway barrier works in a PA?
barrier works in a HPA will not be accepted. TL NO [] YES (ensure you have completed Part O3 of Form 1)
Applications for building or raising waterway
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
@ Aquaculture (non ERA) 17. Does the application involve aquaculture in a PA?
seed ns for aquaculture in @ HPA will not be []No [_] YES (ensure you have completed Part 0; of Form 1)
if you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with waterina | 18. Does the application involve operational works that interfere with water in a watercourse that is in
watercourse a nominated waterway in a PA?
Note: if the development is proposed in a HPA,
applications for all works that interfere with water LC NO C] YES (ensure you have completed the relevant Part K of Form 1)
in a watercourse (including dams or weirs,
steam realignment or steam diversion) will not |49 If YES
be accepted. , oo ; ;
in a PA, applications for instream dams and LI i) The application is for an instream dam or weir; or
if you ticked box jin Q19, your application wil TC ii) The application is for operational works that interfere with water in a watercourse, and is
weirs may be accepted in nominated waterways. ttt t ‘ . . . .
not be accepted. for development other than a dam or weir.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www. niw.qlid.gov.au or contacting the
department by email on:
[email protected] 13See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015ECF3.001.pdfRelated documentPublic source context ↗
07/1685 - MCU - Visitor Accom. Type 4 - Visitor Hostel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.