 INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 20, 2 A oil 2007’ ,
 Whether particular buildings maybe | 16.         An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
 occupied for residential purposes                 referral to the local government as the concurrence agency.
 For more information go to schedule 2 table 1 of the
 iP Regulation.
 Assessment period 15 days. No response is a
 ceemed refusal.
 Design and siting                           17.  An application may trigger referral to the local government as the concurrence agency if the building work
 For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
 [P Requlation.                              18.  An application may trigger referral to the local government as the concurrence agency if the building work
 Assessment period 5 days. No response is a       does not comply with the qualitative statement for building clearance and site cover.
 deemed refusal,                             19.  An application may trigger referral to the local government as the concurrence agency if the building work
                                                  does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
                                                  Development Code, part 11 or 12.
 Fire safety in particular budget            20.  An application may trigger referral to the local govemment as the concurrence agency to determine the
 accommodation buildings                          building wil! comply with the fire safety standard under the Building Act 1975 when the building work has
 For more information go to schedule 2 table 1 of the been completed.
 IP Regulation.
 Assessment period 15 days. No response is a
 deemed refusal,
 Higher risk personal appearance             21.  An application may trigger referral to the local government as the concurrence agency to determine if the
 services                                         building work
 For more information go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development code part 15; and
IP Requlation and the QDC part 15.                * — the work does not comply with an acceptable solution stated in the part.
 Assessment period 15 days, No response is a
 deemed refusal.
 Building work for residential service | 22.      An application for building work for premises in which residential care service under the Residential
 For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
 IP Requtation and the QDC part 20.               referral to the local government as the concurrence agency.
 Assessment period 15 days. No response is a  ,                                                            :
 deemed refusal.
 Building work for removal or                23.  An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
 rebuilding                                       referral to the local government as the concurrence agency.
 For more information go to schedule 2 table 1 of the
 IP Requiation.
 Assessment period 5 days. No response is a
 deemed refusal.
 Building work for rainwater tank in         24.  An application may trigger referral to the local government as the concurrence agency to determine if the
 designated rainwater tank area                    building work or structure complies with the relevant performance criteria if -
 For more information go to schedule 2 table 1 of the e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
IP Regulation and the QDC part 25.                     building work, in a designated rainwater tank area; and
 Assessment period 15 days. No response is a       e   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
 deemed refusal,                                       solution for a relevant performance criteria.

                                                                                   Page 16

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015ECF3.001.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.