Council archive · source document
0015ECF3.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1897 Part D, Version 2.0, 4 October 2004
Form 1 Development Application idas
Material change ofuse &
assessable against a local government's planning scheme Ze
Completion of all applicable questions on Part D is mandatory for alt applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application 1. This application is for: (tick 1 or both if applicable)
7 ceveopment permit autiorses fi [_] Preliminary approval for a material change of use of premises including conceptual
approval ls 2 step in the approval process design for any associated works that require approval under the planning scheme (ie.
and does not authorise development to occur. consideration of the proposal concept)
AND /OR
@ XJ Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
the planning scheme against which the Eastern Beaches Locality - Semi-Attached Housing Zone
application will be assessed.
3. _ Existing gross floor area: (if applicable)
4. Are there any existing easements on the land?
J NO
C1 YES - attach plans of the focation and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land fo shopping centre, house to apartment building,
vacant land to industry (tyre manufacturing) etc.)
vacant to Visitor Accommodation - Type 4 Conventional (visitor hostel)
6. Number of employees: 1 employee on site at any one time
7. Operating days and hours: standard industry operating hours
©} Associated building works details (if |g Site cover:
applicable) , ,
For the definition of "site cover’, “gross floor 9. Gross floor area: 757m2
area” and “storey” go to the planning scheme |" .
inst which the application will be . .
eee 10. Number of on-site car parking spaces:
14. Number of storeys / maximum height above natural ground: 2 storeys / 8 metres
12. Number of employees 1 employee on site at any one time
13. Hours and days the use will operate standard industry operating hours
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fill, drainage, road works etc.)
(eppicede) separate operational works application to be lodged
if applicabl
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 7.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager)
| REFERENCESee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015ECF3.001.pdfRelated documentPublic source context ↗
07/1685 - MCU - Visitor Accom. Type 4 - Visitor Hostel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.