Council archive · source document
0015ECF3.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
THE DESIGN FOR THIS BUILDING SHALL BE iN MARK BAIN CONSTRUCTIONS pty/itd
ACCORDANCE WITH THE BCA DESIGN CRITERIA - Licence No. 58274
WIND SPEED W41 N Drawing Legend 27 Ross Cresent,
Floor Areas Sunshine Beach, Qld. 4567
Notes Drawing Title Level 1 Phone 07-5447 44435
Mobile — 0412 711 151
General Site Plan living area 342m2
Do not scale plans, use written dimensions only. If any Level 4 Floor Plan deck area 50m2
discrepancies are found, the following must be notified Level 2 Floor Pian Level 2
RESIDENTIAL DESIGN STUDIO-PHONE 5448 9000 living area 365m2 Site Address
Elevations deck area 67m2
Level 1 Dimension Plan
Cut/fill indicated on plans may vary at construction Level 2 Dimension Plan total 824m2 Lots 106 & 107
stage, & builder to adjust as required Site Cover laundry area 5m2 Edwards Street,
Any variation at construction stage is to comply with aa communal kitchen area = 45m2
local building authority on earthworks /drainage comon room area = 108m2 Sunshine Beach
All cut & fill embankments up to 1 m in height level 2 deck = 52m2
are to be no greater than 1 in 4 level 1 terrace 2 80m2
All retaining walls and embankments are to comply a Project
with local building authority requirements
Any retaining wall over 1 m in height must be Site Calculations Backpackers
engineer designed.
Position of retaining walls & embankments may site area zs 1032m2 Accomodation
vary to suit site works. site cover = 412m2 (40%)
g.f.a. a 757m2
Contours & Levels no. people zs 338m2 (32%)
Floor slabs to finish a minimum of 300mm above landscape area =
prepared platform level, 225mm above finished
ground level.
Timber floor framing to finish to heights above Real Property Description
as shown on drawings. Drawing Title
Lots 106 & 107
All surfaces adjacent to buildings for a minimum Reg. Plan No. 94566
width of 1m ,to be graded away from buildings Parish of Weyba
to a minimum slope of 1 in 20
Level at alignments to be in accordance with local Site Plan
building authority requirements.
Owner/builder is responsible for accuracy of cut/fill
levels.
Gone A Baty
RL 4.030
“NS
All sewage & wastewater to be discharged to local
building authority requirements. “A o\ (eenthed “Batum Drawing No. 6237 ISSUE
Licensed plumber & drainer or local building
authority to prepare drainage plans. _ RL. 4.200 Sheet No.
All rainwater from roof discharge to be drained to vo - ——_—— —- ee —--
street chonnel or as directed by loca! building Date 10/8/2006
authority. “N Scale 1:1200
AA,
Cy V\ & drawings mhosn
All boundary clearances shown are to verified by a Ae oo on theme phase ore
builder prior to set out & commencement of any Ve Pm ry) y) a and remain the property of
construction. ca ——- _— — copying/ distribution of these
It is recommended that a licensed surveyor be % OS ri a ryt
engaged to ensure minimum setbacks are not — Ci —4i ey
“A
encroached on. reo \ ar We al A
Owner /Builder to confirm correct building allotment. YA i iy (oie! i]
Builder to confirm position of all services prior to RL 0.600 Xx
commencement of construction. ag: \ : UW Lea
LETS | roe
i+
WY a
VS Le
OS | (ort lew 2800 |
& Ne 3
CA) '\,
“OY EE wee HE E CT
a
Lint —<e—6e-4gqcc-
i
| a
—— —
_~---4 HE
Se gan ron
RL -0.700 &
—e
soo
'4650
“are ~ ok
Strag, -— Cornet od Batu
Core:
RL. 0.000See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015ECF3.001.pdfRelated documentPublic source context ↗
07/1685 - MCU - Visitor Accom. Type 4 - Visitor Hostel [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.