GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
Page 42 of 84
GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
2007/2446
16.4.4. Transport to alternative site for breaking down materials provided that all
necessary permits have been obtained to allow the alternate site to be
used for this purpose.
16.4.5. The disposal method for clearing works is to be submitted in conjunction
with an application for a Development Permit for Operational Work. The
Applicant is advised that other methods may be considered provided full
details of the method are submitted.
The Applicant is advised that burning off is an unacceptable method of disposal.
Security Bond
17. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
retumed on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
18. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Relevant Period
19. The Development Permit for a material change of use of premises lapses if the use has not
happened by 17 August 2013, unless an application to extend the relevant period is
approved by Council.
Frontage Works
20. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants
& Guidelines. Grass shall be couch, free of weeds.
21. The applicant shall be responsible for providing an edge-of-road yellow line marking
between the proposed Entry and Exit driveways from the site to indicate “No Parking” area.
The line marking shall be provided in accordance with Manual of Uniform Traffic Control
Devices (MUTCD) Part 3 and shall be indicated on the plans submitted for Development
Permit for Operational Works.
22. All paths, ramps, driveways and parking areas shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and
to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
1428.1 Design for Access & Mobility.
23. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council's Standard specifications prior to commencement of the use permitted by this
permit.
24. The applicant shall replace the existing length of the kerb line between the proposed
driveways (Entry and Exit).
Page 4 of 17
Page 42 of 84See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.