Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2018-11-12 General Committee Meeting Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   12 NOVEMBER 2018




                                        Page 75 of 84

GENERAL COMMITTEE MEETING AGENDA                                                                           12 NOVEMBER 2018

                           ta)                                                                                Grants External     er Ta)     7   Other     General      Bred]
                                                                                                                       ated            Se                    Rates
                         ‘Sunshine BeachNAC-Roof Replacement                                                                         tS 100,000]                     100,000
                         (Cooroy SES Shed Alterations SSSCSC~—SCSSSTCC*‘dSSSCC*SSS*d YY 90,000 $30,000,
                         /Peregian Beach SLS Building RoofReplacement——SSSSCSCSCSCSCSCSCSSCdYCS SS 176,200 | $176,200 |
                         [Bicentonial Hall Extension Fire Pump Works             SSSSCSCSCSCSCSCCCCCC*dL'—*dY Sd                    (|      |__| $100,000 $100,000
                         CommunityFaciliies Total = SC—~“*~*~“‘“‘—*S*S*S*~“‘“*~‘“S*S*S*S*S*S~S~C~s~SSC‘“‘CS*sSCSC‘“‘“RSC“C(#SNSC“CNSNN#NN YUN. | $840,948 / $840,948
                         CorporateBuldings.                                                  OOOO                                 COSCO
                         FTewantin Administration Building -Roof Replacement ———SSSSSSSSSCSCSCSC~—~SSSSYTSSSSC~*d SSC SSSSSC*dYCS            «iY   _+ $770,000, $770,000,
                         FTewantin Administration Building - Master Planning & detailed design —=~=S~—~—~*—*—~*S*S~wSCSCSCSCS~*dSSCSCSC*dSSSCSCSCSC*dSCS «| $200,000, $200,000
                         FTewantin Admin Building Automatic Transfer Switch Sid i                                                                   LS 17.087 $17,087
                         Corporate Buildings Total                                                                                                     $987,037 | $987,087 _
                         Gravel Road Network
                         [Shire Gravel Resheeting Annual Progam ——=S~S~SSSSS = +                                          (dS        *dY |_| $280,000 $280,000
                         Hinterand Gravel Road Upgrade (Donnellys Road)                  SSS                        |S 788.015 |S 798,05 |
                         (Gravel Roads Extension Progam                    SSSSCSCSCSCSCCCTCCCCCC*dS.         =| |_|                        |__| $120,000 |'$ 120,000
                         Gravel Road Network Total                                                                                                     $1,146,018 | $1,146,015 |
                         Holiday Parks
                         [Noosavile Noosa River Holiday Park Large Amenities Renewal    SSOSCS~SS =                 TiS «iS 48000 | $428,000 |
                         [Noosavile Noosa River Holiday Park Small Amenities Renewal ——=S~S~S~S                 «SYS                 *dYSSS*dYCSC*dS 2387 |S 288
                         [Noosa North Shore Beachfront Campground Redevelopment             SSSSSSSC*dY SCT               «dS 700000;        | SSCS            ~*S 700,000
                         [Noosaville Noosa River Holiday Park Road Reseal and V Drain Foreshore Woks —SSSSSSSSC*| Si S|              |      (|_| S$ 149,000 [$149,000
                         Holiday Parks Total                                                                                  700,000) | $801,387 | $1,501,387 |
                         Parks & Playgrounds
                         [Noosavile Gympie Terrace Park Furniture Renewal ——=SC~S~—C~—SSSCSCS*dSSSSSC*dSSSCSCSCS*dSCSSS*d +S                               80,000, $80,000,
                         [Pomona Jo Bazzo Park BBQ and Associated Pathways ==S=S~*~“*~—*~*~*~*~*~‘“‘“‘“‘~*~*~*~*“‘“‘“‘“*~*~**~*~*~é~“SC“‘CCYT_+ +i     $30,000 | $30,000
                         [Pomona Stan Topper Park - Basketball CourtRenewal ——SSSSSSCSC~—SCS~SCSCSCSS S|                 Sid SSS SS*dY              (YS    95,000 | $95,000,
                         [Botanic Garden Shade House             SSSCSC~“—~S*SCSC“CSsSSTSTTTTCSdNSC“             *SCdC~*dSSCSCS~*dSCSSCSC*dS               B'S
                         (Cooroy Hinteriand Priority Playground=Constuction——=S~S~S~S~S~SSSCSCSC*«dCTSCSCS~*S BOG |= SSSSC*dS «88D |S 7.200.917
                         /Peregian Beach Town Square Upgrade Planning & Design. ——=—=S~C~—SC~—~SSSsSCS~‘TS~d SSCS            SSSSC*dY Sd            +S 25.000,       25,000,
                         [Headland Park PlaygroundRenewal    SS         SSSCSC~—“—sSCSCSCSCSCSSTSSSSC*dSSSCdST*dS YS                                       00,000, $60,000,
                         \Wavecrest Park Shade SailRenewal ———SSSSSSOSC~—SSSTTTT SSS SSS*dTSdY                                                      dS 48,000 | $43,000 |
                         [Noosa Heads Pinaroo Park Swing & SoffallRenewal ——=S~—SCSSYTSSSSSC*d SSC SSSS*dY Sd                                       YS 19,000, $19,000,
                         [Sunrise Beach Orient Park North Swing & SoftfallRenewalSSSSCSC~SCSYSSSSCSSSCSCSC«dSSC“‘(N#’ CL                     +i      | S_ 19,000 $19,000 |
                         [Sunrise Beach Comet Park Swing & SoftfallRenewal SSSSSCSC~—SCSYTSSSSSSC*dSCSSSC*dSSSSSS*dSCS*dSC +S 19,000 $19,000,
                         (Cooran PioneerPakUpgradeSSOSCSCSCSCSSCTCTCCCCSCSYTS—SCSC*dS S188 588 |S 109,509,
                         Parks & Playgrounds Total                                                                          $1,250,000) |S _816,580 | $1,766,580
                         Public Transport Infrastructure
                         [Shire Bus Shelter Disabled Compliant Program: Years —~—S~S~—~S~S~S8HOLOO| «| SSSSSC*|SS*SSSC*dS 288,000 /8                                 818,000,
                         Public Transport Infrastructure Total                                             800                                       $268,000 | $518,000
                         Sealed Roads Network
                         \Weyba Road Corridor improvements SSSCS~—SSSSTTCCSdSSSCSTSSCSSTS*dC dS 40,000 | $40,000 |
                         [Peregian Beach, David Low Way GuardrailRenewal —SSSSCSC~—SCSYSSSSC~dSSSCSCSC~idSSCSC“‘(S +i                      Cd        *dS   80'S       4500
                         [Sunshine Beach Resurfacing PreparationWomks SSSC~S~SCSCSCSYTSSCSCS~S~*dSSSCSC*idSSTSSSSSC*dSC*dYSCT +d S985 400- S15 400
                                                                                                                                                                                          Page 2

                                                                                                                     Page 75 of 84
Log in to download the original file

2018-11-12 General Committee Meeting Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.