GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
Page 77 of 84
GENERAL COMMITTEE MEETING AGENDA 12 NOVEMBER 2018
ta Grants External er Tay Levy Other General Be) 1)
Funds Toa a Rates
[Noosa Heads Park Road Boardwalk RenewalConstucton |S 4,629,000] $ 4,621,000 |
[Noosa Heads Main Beach Trunk Pathway Upgrade Link from Surf Cub to Park Road @Om)———S«d| ~SSCSCS~dYSCSCSC~*dYSSSCSC*dSSCSCSC*dSCSCSCSC*S CBOSS _—349.057 |
[Cooroy Maple StrestRaised Pedestrian Crossing SSSCSCSCSC~C~—CSsYSSSSSC~*dSSSSSCSYSSSSSCS*dSSSSCSC +S 75,000 | $75,000 |
[Jacaranda Park, Tewantin-Pathway Renewal SSSSSCSCSC~—SCSSTC*dSdY iS 88,000 | $55,000 |
Wallace Park Pathway Stage5&6 0 SSSSSCSC~CSSSTSTTTTTTC*‘dLSC“‘(SN’ CY SYS*d LS 88,000 | $68,000 |
PPoinciana Shared Pathway Stage3SSSOSOSOSOTTTTTCCCTCTC YT Sid i | 27,000 | $27,000 |
Pathways &Boardwalks Total BSP $5,393,168 | $ 5,430,001
PublicAmenies OCC COSTCO
Peregian Beach Public Amenities Renewal Constuction SS SC«dS | iY i | $180,000 | $150,000 |
Public Amenities Total ga 000 § 150,000
Other Capital $ 430,500 $ 1,125,000 $ 3,740,026 $ 5,295,526
AssetManagemett
Shire CCTV Drainage progam SSSOSCSCSCSCSSCSCCCCSCSCSCSCSTSSS YY | 200,000 | $200,000 |
Technology One Asset Systems Mobiliy Rollout andHardware——SSSCSC~—~S~STSSSSC*dSSSSCSSS «d+ | $150,000 | $150,000 |
Zero Emissions proriyminorprjects SS SSSSSCSCSCSCSSSTSSTSSSdYSS SYS | $28,802 |
[Zero Emissions Noosa Project implementation —=S~S~—SSCSsSSTSSCdSSSSC*dSSSCS~sSSCSC~‘“CSCS*~«~SC« DA | S82 |
Shire Pavement Management System Road Surface Condition Modeling —————SSSSSCSCS~S~SSSSSSC*dYSCSSSCSS* iY _40,000[ $40,000 |
FTewantin Administration Building AirHandiing Unitreplaceme SSCS SSSC*d SSC STCd Cd +S 8000 $5,000 |
AssetManagement Total s—=“‘CS*™*™*™”™™O™O™~™~C~CCSNS“‘SSTSSSOSSS™S™S™SCSSSSSSC 880,897 | $880,597
Fleet-PlantReplacement—SSOSOSOSSSSSOSOCOSCSCCCCSNS SCS
[Council Fleet and Plant ReplacementProgram SS STSSSSSCSCSC~dS 18 OOOL |i SC S«*dS 0D] S 2.040.201 |
Fleet -PlantReplacementTotal = ss=<“C*‘“‘S*™*™”™”™”!!™!™™”™~™~™~SC«*éi&SOOSSSC*‘(‘ C;*‘*SSOC*‘<YN(C#C#‘(#(#”S#CS#S«O2&,241'| $ 2,080,204
Ce A
Technology One Cl Anywhere Systems Implementation - Property and Rating, Procure toPay——*«|——S~d~SC~dSCSCSCS~dCSSCSCS~*idCSSCSCSC*dCS SBT. |S_A7B_BTI |
ICT Hardware -Network Switch Replacement CSC I $870,000 | $370,000 |
Information Technology Total SS—~—“—~s~s~s~sSC“C~sSsSSSSCSCSSSCdCCC“ TS 8887S 888,37
CS
[Noosa River Bathymety SuveySSSSCSC~SSCSCSCCSCSSSTSY SS 80000 | SC*dS CO SB |
Shire Project Team Resources for NewPlanning Scheme —=—=~S=S~“~*“‘“*~*~*~*~*~*~‘~*~*~*~*~*~dCSC“‘*‘“‘*rtCSSCSC*dS«CR HOO C*|SSSC*dCSSCSCSC*«dS~C« OO
[Shire Planning Scheme Consultancy —SSCSC~“~“‘~*~*~*~‘“‘“‘“‘~*~‘~*~‘“‘“‘“~*~*s*s*‘“‘~*~S*s*sSS*dCSSCSCSCS*dSCSS*«*SC 8H, SS*YSSSCSSSSS«*S 14.000 |
Shire Planning Scheme Climate Change Adaptation _——=~=~<“~*~*~“‘~*~*~*~‘~*~*~*~*~S~S~«~SC BHO] ~*~ 80-000| —=«d;CSC*C*‘irSSC« BTL S78 |
NoosaRiver Hydraulic Model SSSCSC~—SSSCSCSCTCCSSSCdSCSCSC*dSSSCSC*dCSSC*dS 8 TOS 34,910 |
Shire Project Team Materials &Servces— Si (iS 15000 LS 125,000 |
Planning Scheme Total at 5008 4,125,000 |S 64,103 | § 1,476,397
Grand Total STARR) $ 3,075,000 $ 23,364,287 $29,814,603
Page 4
Page 77 of 84See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.