Specific Outcomes

05 The provision of landscaping is to a satisfactory
standard ensuring that it does not lead to opportunities for
conceaiment and possible assault sites.

O6 Street trees and plantings in towns and villages,
carparks and other areas where potential conflicts with
vehicles and pedestrians are evident, are planted so as to
maximise vehicle and pedestrian safety.

Services and utilities

07 Alllandscaping works maintain adequate safe distance
from services and utilities including substations, overhead
powerlines, power poles and transformers, street lamps,
stormwater catchment pits, and underground services and
utilities.

 

Landscaping Code

 

Column 2 a

Probable Solutions (if code assessable)

$5.1 Landscaping provided which allows adequate visibility for
casual surveillance of public and semi-public spaces, including
entrances and exits to sites and buildings, by:

@) planting trees which have clean trunks to a height of at least
1.8m; and

b) appropriately spacing shrubs at 1.2m horizontal centres, with
a maximum height of 0.75m, to avoid clumping and to retain
sightlines.

$6.1 Street trees and trees in carparking areas achieve a
maximum of 900mm clear trunk height for a 2.0m high tree at
planting and are able to attain a clear trunk height of 1900mm on
maturity;

$6.2 All scrub planting to be a maximum height of 700mm from
the road pavement (not top of kerb).

$7.1 Plant species used in landscaping adjacent to substations,
or adjacent to or on electricity transmission line easements, are
less than 4m high at maturity and do not encroach within 3m of a
substation boundary;

OR

$7.2 For trees higher than 4m, trees are planted at a distance
from any part of an electricity transmission line at least equal to
the expected height of the tree at maturity

$7.3 For power lines that connect to a premises, the height of
plant species at maturity provides for a 2m clearance below the
power line;)

 

$7.4 Trees and large scrubs are located a minimum of—
a) 5m from electricity poles and pillars;

b) 4m from street lamps;

C) 2m from stormwater catchment pits; and

d) 2m from underground services and ulilities;

AND

$7.5 Plants are located to enable tradespersons to access, view
and inspect service meters, such as water and electricity meters.

Page 3

 

 

   

    
 

Column 3
Compliance

A separate application for Operational works landscaping
will be submitted.

Not applicable

A condition may be imposed if considered appropriate.

A separate application for Operational works landscaping
will be submitted.

 

Glen Irwin & Trevor Mathews

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2357 - MCU - Multiple Housing Type 2 - Duplex [As Published].pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.