Council archive · source document
Concurrence Agency Response - DERM · OPW11/0409
DERM Permit number: SPCC03748912
"tidal water" means the sea and any part of a harbour or watercourse ordinarily within the ebb and flow of the
tide at spring tides.
"watercourse" means a river, creek or stream in which water flows permanently or intermittently-
• in a natural channel, whether artificially improved or not; or
n in an artificial channel that has changed the course of the watercourse.
"waters" includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined
water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the
sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-
thereof.
"waterway" includes a river, creek, stream, watercourse or inlet of the sea
"works" or "operation" means the development approved under this development approval.
"you" means the holder of this development approval or owner / occupier of the land which is the subject of
this development approval.
END OF CONDITIONS
Page 6 of 8 ' 091217 Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Concurrence Agency Response - DERMRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.