Earthworks
Issue
The proposed development will include significant earthworks but the submitted material does not include any
comment, plans or reports regarding the extent of earthworks and the proposed retaining structures.
Information Required
9. Provide detail and plans that clearly indicate the extent of earthworks and the proposed retaining structures. The
detail must also include a site specific soils investigation that includes recommendations for the construction of
the development works.
Response
Earthworks plans (prepared by Acor) have been provided in Attachment C. These plans show the extent of
all earthworks and retaining structures. They have been designed in accordance with the Stormwater
Management Plan.
It is submitted to Council that a site specific soils investigation be conditioned as part of development
approval that will better contemplate detailed design.
Traffic and Access
Issue
There will be a demand for customers to use both centres in the same trip and for this reason there should be
integration between the two buildings for cars, pedestrians and service vehicles.
Information Required
10. Provide amended plans that address and provide for the following:
a. Redesign the proposal to integrate the vehicular access arrangements (car and service vehicle) and
pedestrian connectivity of the proposed Bunnings expansion with the existing Bunnings development.
b. Demonstrate how vehicles would safely and appropriately exit the existing northern Bunnings access
driveway and then enter the proposed new Bunnings expansion driveway.
c. Quantify and justify the loss of on-street parking arising from the proposed access arrangements.
d. Demonstrate that a delivery vehicle entering the new driveway will have adequate height clearance where it
passes under the new building.
e. Justify one-way operation of the proposed basement carpark when the preferred two-way operation can be
readily accommodated.
Response
Traffic response has been prepared by TTM confirming the appropriateness of the proposed design, access
and circulation arrangements. In particular TTM indicate that:
• Integration of the site access arrangements is not physically possible due to the substantial difference in
levels between the two sites, being approximately 3m.
• TTM drawing number 21BRT0226-04B (Appendix B of the traffic report) demonstrates that the design
customer vehicle (large car and dual-axle trailer combination) can safely and adequately exit the
existing Bunnings northern access on Gateway Drive.
RPS Australia East Pty Ltd. Registered in Australia No. 44 140 292 762
rpsgroup.com Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU220051_Information Request Response_v1.2_130323.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.