Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU14/0106 - Attachment 2

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (56.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Existing carpark garden
beds replanted with local
native trees complimenting
surrounding bushland

species

Wide spanning, post free
arbour section at bus stops

New large canopy shade
tree over seating area

  
 
 
  
 
  
  
  

Feature pavement
to pedestrian areas
adjacent to arbour

 

   

End of Trip Facilities

End of trip facilities
to comply with CPTED
guidelines.

Zone C Plan

Scale 1:200
New high level feature screen treatment
along existing building facade

New vegetated
screen partition concealing
service room entry doors New batten and clear

behind roofing shade structure

 

Recycled Timber Arbour

Shoppin
Centre.
Tenancies

   

 

 

600mm clear from
kerb to arbour as per
Translink guidelines

Feature pavement
to Arbour pathway

Feature pavement
to pedestrian areas
adjacent to arbour

   

Existing services
rooms

Coarse speed-check paving
to shared bicycle / pedestrian
zones at intermittent locations
along arbour

Existing escape

   

New large canopy shade
tree over sculpture court
and seating area
Existing shopping

centre behind

 

 

 

 

 

 

 

 

 

 

Zone C Elevation
Scale 1:200

 

OIC

= Global
Bark Real Estate

 

 

  

 

 

 

 

Batten screen
wall to end of
trip facilities

Recycled timber arbour
with climbing plants
providing a green buffer
between pedestrian and
vehicle zones

  

Noosa Civic Expansion

C1V1C _ For QIC Noosa Civic Pty Ltd

 

Existing Issues

ited landscaping and green space;

ted weather protection to existing
footpath;

- Existing End of Trip Facilities is inefficient
& not easily located;

- Bus stop feels too 'back of house’;

- Bus stop appears too symetrical in the
context of the overall front elevation

    

 

 

 

Pe RY

Zone C Plan

ri

1:200@ A3

Drawing No. / Revision

DYMO
Log in to download the original file

MCU14_0106 - ATTACHMENT 2.pdf · 56.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.