Council archive · source document
09/0940 - Op works - Jetty [As Published] · 142009.940
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, take, canal)
Name of water body, watercourse or aquifer (if known)
[ 1 Noosa Waters Canal
Table £ Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port Authority for the fot
[7
Table F Complete if the premises are in tidal water
fi
3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include tand both above and below water)
Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable}
Total area of premises
820.00 (lm? []hectares (Tick applicable unit)
‘Existing use of the premises
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
[Tine ]
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
4] No Cc Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
[Proposal details
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
Timber jetty
7. Does the poposal include new buildings or operational work (including any services) on the premises?
[No [XI Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
[Resource entitlement (i applicable} - further information is provided in the advice section at the end of the form ]
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
kK No -Go10Q9 oO Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
‘Owner's consent (i applicable) - further information is provided in the advice section at the end of the form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal! Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide detaits for each owner on a Separate row, or on an attachment to this form if applicable.
Premises Owner's name/s Details of the premises owned | * Date consent
Table H and postal address (street address of fot on plan description) Owner's signature was obtained
1 Clifton Sim Ci- PO Box 299, Noosaville QLD 4566 23/06/2009
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent bbs be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2007 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent afe available on the [PA website .
‘Attachments and supporting information (Complete Table! - Use a separate row for each type of attachment or information, including information required
under this Part) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.
Description of attachment or information ‘Title fa ; 1 ars
‘ i ipplicable) Method of delivery to
Table { | feg. Pas c at Far 3 owner consent ovkionce of resource (e.g, General Authorty James Sireet Trai Report Date assessment manager
1 Part E 23-Jun-2009 | over the counter
2 Checklist 30-Jun-2009 | over the counter
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0940 - Op works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.