Skip to the record
Accept no substitutions.

Council archive · source document

09/0940 - Op works - Jetty [As Published] · 142009.940

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1897

 

[Nature of the works

4. Nature of work that requires assessment against a planning scheme:

Part E, Version 3.2

 

 
  
       
   

   
 

bx <<
RECEIVED
15 JUL 2099

“SCRO™ igwantin
= Front mr, “

Building &/or operational works assessa|
against a planning scheme!’

  

   
 

 

 

[LJ Building work - Complete Table A (XJ Operational work - Complete Table 8
Table B
(i) Whatis the nature of the operational work?
(CJ Roadworks (J Stormwater (2) Water infrastructure ([] Sewerage infrastructure
7] Landscaping ( Earthworks (C1 Drainage Works ([] Signage
[] Clearing vegetation under the planning scheme [X] Other - Specify below
Jetty

 

 

 

 

(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this,
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit (7) Preliminary approval (] Both (Specify below)
(iil) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
EX} No [Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

DB No [[] Yes - Complete Table B(a)

 

@ 2. Whatis the dollar value of this operational work? (ie. the total value including GST, materials and labour) 1$ 15000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[Mandatory Information °°” oo ; — ]
3. Confirm that the following mandatory information accompanies this application
Confirmation of: .
lodgément ~~ Method of lodgement
vane if applicable, showing the nature and tocation of the proposed works finctuding the Confirmed _ | over the counter
OFFICE USE ONLY
Date Received Reference Numbers |

 

 

 

 

Advice for completing Part E

 

General advice
Part A must also be completed for alt IDAS development applications.
The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.

 

Qt

 

A development penmit authorises development to occur, while a pretiminary approval is a step in the approval process and does not authorise development to occur

 

 

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0940 - Op works - Jetty [As Published].pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.