EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Childcare Centre Lot 4
11 May 2022
          PERFORMANCE OUTCOMES                                             ACCEPTABLE OUTCOMES                                                  RESPONSE
 Drainage
 PO1                                                        AO1                                                             RO1
 Finished surface levels ensure land is free                The finished surface gradient of any filled or excavated        Development complies with the acceptable outcome
 draining.                                                  area is within the range 0.5% to 1.5% and drains to             and will be free draining.
                                                            Council’s stormwater infrastructure where available or
                                                            where stormwater infrastructure is not available, toward
                                                            the street.
 Hydraulics

 PO2                                                        AO2                                                             RO2
 Any change to the level of the land does not have          No solution provided.                                           Any ground level changes will not impact on site
 an adverse flooding impact on the flooding and                                                                             flooding or drainage characteristics.
 drainage characteristics off-site.
 Geotechnical considerations
 PO3                                                        For assessable development—                                     RO3
 Earthworks do not result in geotechnical instability       AO3.1                                                           Earthworks completed on site will be adequately
 on the premises or nearby premises.                        Filling works are undertaken in accordance with Section         supported and ensure the stability of the surrounding
                                                            2.8- Filling of Site of                                         land
                                                            Council’s PSP5 - Engineering Design
                                                            Standards- Roads and Drainage & Earthworks
                                                            AND
                                                            AO3.2
                                                            Where the filling is for residential commercial or industrial
                                                            purposes the works comply with Australian Standard -
                                                            Guidelines for earthworks on commercial & residential
                                                            development.




  l:\9000-9999\9300-9399\9307\codes\11-05-22 earthworks code.docx

Used in these records

About this file

File size
12.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Item 10 Appendix D - Civil Engineering Report-1.0.pdf · 12.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.