EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Childcare Centre Lot 4
11 May 2022
              PERFORMANCE OUTCOMES                                               ACCEPTABLE OUTCOMES                                            RESPONSE

 Dams

 PO11                                                           AO11.1                                                      RO11
 Dam location and construction does not impact                  Where the site is in the Rural Zone— a) the land has a      Not Applicable. No dams constructed as part of
 upon neighbouring properties in terms of—                      slope of less than 25%                                      development
 a)       hydrology;                                                 (1:4); and
 b)       alteration of existing overland flowpaths and         b)      the earthworks including cut and fill batters and
          patterns;                                                     retaining walls are setback a minimum of 50m from
 c)       landslide or failure of dam wall; and                         the property boundary; and
 effluent disposal areas.                                       c)      the size of the lot is greater than 5 hectares;
                                                                AND
                                                                AO11.2
                                                                Where the site is in the Rural Settlement Zone or the
                                                                Rural Zone where the lot is less than 5 hectares—
                                                                a) the land has a slope of less than 1:6; and
                                                                b)      the earthworks including cut and fill batters and
                                                                        retaining walls are setback a minimum of 20m from
                                                                        the property boundary; and
                                                                c)      involving less than 500m3 of material;
                                                                AND
                                                                AO11.3
                                                                For all other zones — No solution provided.




      l:\9000-9999\9300-9399\9307\codes\11-05-22 earthworks code.docx

Used in these records

About this file

File size
12.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Item 10 Appendix D - Civil Engineering Report-1.0.pdf · 12.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.