Council archive · source document
Decision Notice MCU24 0001 & OPW24 0003 · MCU24/0001
Currency Period
2. This development approval lapses if the use has not happened by 9 April 2030, unless an
application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior to the issue
of any Development Permit for Building Works*
Plan No. Rev. Plan/Document Name Date
23-007 No.02 8 Site Plan prepared by QLD Built 21/02/224
23-007 No. 03 8 Ground Floor Plan prepared by QLD Built 21/02/2024
Annotated by Council
23-007 No. 05 8 First Floor Plan prepared by QLD Built 21/02/2024
23-007 No. 07 8 North & West Elevations prepared by QLD Built 21/02/2024
23-007 No. 08 8 South & East Elevations prepared by QLD Built 21/02/2024
23-007 No. 09 8 Sections 1 and 2 prepared by QLD Built 21/02/2024
23-007 No. 10 8 Sections 3 & 4 prepared by QLD Built 21/02/2024
23-007 No. 26 8 Landscape Plan prepared by QLD Built 21/02/2024
Annotated by Council
Nature and Extent of Approved Use
4. The void areas shown on the Approved Plans must remain as void areas.
5. The area adjacent to each laundry must remain open to the garage as shown on the
Approved Plans and be available for the storage of bikes, motorcycles and the like.
Building Height
6. The maximum height of the development must not exceed 8 metres above the ground level.
7. Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
certifies that the building does not exceed the maximum height requirement of this Decision
Notice.
Performance Bond
8. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works or prior to a pre-start meeting. The cash
bond or trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Building Appearance
9. External design features, materials and finishes must be as shown on the Approved Plans,
with no inclusions or alterations made without approval in writing by Council.
Page 2 of 13
Document Set ID: 22936245
Version: 3, Version Date: 10/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice MCU24 0001 & OPW24 0003.pdfRelated documentApplication case desk ↗
About this file
- File size
- 186 KB (small file)
- File type
No other editions are linked here.