Council archive · source document
Town Planning Assessment Report · MCU24/0120
AO23.3 The distance between Complies with AO23.3
the ground level and the lowest
part of the floor of the building
does not exceed 3 metres.
PO24 Filling and excavation for AO24 Filling and excavation for Can comply with AO24
operational works do not operational works is designed Refer engineering plans.
directly, indirectly or and constructed to ensure
cumulatively cause adverse overland flow and/or flooding is
impacts external to the not worsened, impeded, or
development site by: otherwise diverted to adversely
(a) causing ponding of affect other properties or
water on the site or downstream environments.
nearby land;
(b) increasing flooding,
which adversely affects
the safety or use of any
land upstream or
downstream; or
(c) adversely affecting the
flow of water in any
overland flow path.
Dual Occupancy and Multiple Dwelling Code
Performance Outcome Acceptable Outcome Response
PO1 Development is located No acceptable outcome provided Complies with PO1
within the urban boundaries on The proposal is located within
land with good access to a urban boundaries and is zoned
variety of essential services and for residential land uses. The
facilities, including retail, site is in close proximity to
commercial, social and medical public transport, recreational
facilities and public transport opportunities, and a range of
services. goods and services.
PO2 A dual occupancy or No acceptable outcome Complies with PO2
multiple dwellings occur only on provided The site is zoned Medium
land that is suited to the Density Residential.
development and occupation of
residential buildings avoiding
risk to people or property from
natural disaster.
PO3 Development does not No acceptable outcome provided Complies with PO3
adversely impact on existing or The proposal will integrate with
future infrastructure including existing infrastructure, and will
water or sewerage utilities, provide upgraded infrastructure
electricity or transport to suit the proposal as
infrastructure. required.
PO4 Development addresses AO4 Dual occupancy and Complies with AO4
the street, contributes to the multiple dwellings do not occur The proposal is on a corner
streetscape and does not on battleaxe or rear allotments
44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.